CN201961952U - Electronic translation of novel bridge crane clamp - Google Patents
Electronic translation of novel bridge crane clamp Download PDFInfo
- Publication number
- CN201961952U CN201961952U CN2011200718038U CN201120071803U CN201961952U CN 201961952 U CN201961952 U CN 201961952U CN 2011200718038 U CN2011200718038 U CN 2011200718038U CN 201120071803 U CN201120071803 U CN 201120071803U CN 201961952 U CN201961952 U CN 201961952U
- Authority
- CN
- China
- Prior art keywords
- clamp
- suspension hook
- finished product
- wire rope
- coupler body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses an electronic translation of novel bridge crane clamp so as to solve at present some operation link need overflow the great coil of strip in limit and carry out the handling the steel scrap fill on ground, rectangle panel and some time, must take off electronic translation clamp from the lifting hook, and the reuse steel wire rope carries out handling, the problem that wastes time and energy. It comprises power part and two clamp arms, and Ann has the lifting hook respectively on two clamp arms. This utility model can be directly hung the steel wire rope on the lifting hook, need not take off the clamp, has practiced thrift the production time greatly, has reduced workman's the amount of labour, and the steel wire rope can not lead to the fact the damage to the extranal packing that the steel sheet that overflows and finished product were rolled up in addition, thereby has improved the lumber recovery, has protected the extranal packing of finished product book and finished product rectangle panel.
Description
Technical field
The utility model relates to a kind of novel crane in bridge type electric translation clamp.
Background technology
In cold-rolling thin plate is produced, volume rolls off the production line from each unit supply of raw material to finished product, all need crane in bridge type handling coil of strip from the delivery that is packaged into certified products of finished product volume, must use special-purpose electric translation clamp to carry out the clamping coil of strip in hanging the process of volume, large-scale cold rolling factory often is equipped with more than 100 of electric translation clamp.But in some cargo handling operation, need the bigger coil of strip of ground-surface steel scrap bucket, rectangle sheet material and some bleeding edges is carried out handling, in the process of handling, the electric translation clamp must be taken off from suspension hook, with steel rope steel scrap bucket, rectangle sheet material and bleeding edge coil of strip be carried out handling again.Caused the problem of two aspects like this, on the one hand be with the electric translation clamp from gib head take off or install all cumbersome with lose time, and damage the plug of clamp easily, the maintenance of serialization production and equipment has been brought a lot of troubles; When handling rectangle sheet material and bleeding edge coil of strip, because steel rope directly hangs on the gib head, its stressed back steel rope is triangular in shape, and very big influence is equipped with in the outsourcing of bleeding edge and sheet material, can cause the damage of coil of strip, influences lumber recovery on the other hand.
The utility model content
The purpose of this utility model is to overcome the prior art defective, and a kind of novel crane in bridge type electric translation clamp is provided.
The technical solution of the utility model is achieved in that novel crane in bridge type electric translation clamp, comprises power pack section and two holder arms, and it is, is equipped with suspension hook respectively on two holder arms.
Preferably, described suspension hook is made of gib head, coupler body and weight, and gib head and weight are at the coupler body two ends, and bearing pin passes coupler body suspension hook is fixed between two blocks of tong arm steel plates of holder arms.
Preferably, also be equipped with the suspension hook fixing pin between two blocks of tong arm steel plates, when bearing pin rotates, gib head be positioned working position at the suspension hook coupler body.
The utility model has installed two suspension hooks additional on the tong arm of clamp, can directly steel rope be hung on the suspension hook when handling steel scrap bucket, rectangle sheet material and bleeding edge coil of strip, does not need to take off clamp, has saved production time greatly, has reduced workman's labor content; And owing to the distance of two tong arms of clamp can be regulated according to the width of bleeding edge coil of strip; with steel rope handling bleeding edge coil of strip the time; the no longer triangular in shape but rectangle or trapezoidal of steel rope; steel rope can not cause damage to the external packing of the steel plate that overflows and finished product volume; thereby improved lumber recovery, protected the external packing of finished product volume and finished product rectangle sheet material.
Suspension hook is by ingenious design, under the situation of not using suspension hook, suspension hook is in two tong arm steel plate intermediate gaps of holder arms naturally by weight action of gravity meeting, can not cause the variation of clamp volume and external structure, during operation, avoided suspension hook and other objects to clash at the scene.When using suspension hook, with hand suspension hook is pulled out, hang up steel rope then, under the effect of hanging thing, suspension hook rotates around bearing pin, when rotating to certain angle, the lower part of suspension hook contacts with the suspension hook fixing pin, no longer rotation after the contact, and gib head is positioned at working position, so just weight can be sling, carry out operation.
Description of drawings
Accompanying drawing 1 is the utility model structural representation.
Accompanying drawing 2 is suspension hook scheme of installations.
Accompanying drawing 3 is suspension hook installation side views.
Among the figure, the 1-power pack section; The 2-holder arms; The 3-suspension hook; The 3-1-gib head; The 3-2-coupler body; The 3-3-weight; The 4-bearing pin; 5-tong arm steel plate; 6-suspension hook fixing pin; The 7-sleeve.
The specific embodiment
Be further described below in conjunction with accompanying drawing.
As Fig. 1, Fig. 2, shown in Figure 3, novel crane in bridge type electric translation clamp, comprise power pack section 1 and two holder arms 2, on two holder arms 2, be equipped with suspension hook 3 respectively, described suspension hook 3 is made of gib head 3-1, coupler body 3-2 and weight 3-3, gib head 3-1 and weight 3-3 are at coupler body 3-2 two ends, bearing pin 4 passes coupler body 3-2 and suspension hook 3 is fixed between two blocks of tong arm steel plates 5 of holder arms 2, be equipped with sleeve 7 to gain in strength outside the bearing pin 4, also be equipped with suspension hook fixing pin 6 between two blocks of tong arm steel plates 5, when bearing pin 4 rotates, gib head 3-1 be positioned working position at suspension hook coupler body 3-2.
The utility model has installed two suspension hooks 3 additional on the holder arms 2 of clamp, when handling steel scrap bucket, rectangle sheet material and bleeding edge coil of strip, can directly steel rope be hung on the suspension hook 3, do not need to take off clamp, saved production time greatly, reduced workman's labor content; And owing to the distance of two holder arms 2 of clamp can be regulated according to the width of bleeding edge coil of strip; with steel rope handling bleeding edge coil of strip the time; the no longer triangular in shape but rectangle of steel rope; steel rope can not cause damage to the external packing of the steel plate that overflows and finished product volume; thereby improved lumber recovery, protected the external packing of finished product volume and finished product rectangle sheet material.
Claims (3)
1. novel crane in bridge type electric translation clamp comprises power pack section and two holder arms, it is characterized in that: be equipped with suspension hook respectively on two holder arms.
2. novel crane in bridge type electric translation clamp according to claim 1, it is characterized in that: described suspension hook is made of gib head, coupler body and weight, gib head and weight are at the coupler body two ends, and bearing pin passes coupler body suspension hook is fixed between two blocks of tong arm steel plates of holder arms.
3. novel crane in bridge type electric translation clamp according to claim 2 is characterized in that: also be equipped with the suspension hook fixing pin between two blocks of tong arm steel plates, when bearing pin rotates gib head be positioned working position at the suspension hook coupler body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200718038U CN201961952U (en) | 2011-03-18 | 2011-03-18 | Electronic translation of novel bridge crane clamp |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200718038U CN201961952U (en) | 2011-03-18 | 2011-03-18 | Electronic translation of novel bridge crane clamp |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201961952U true CN201961952U (en) | 2011-09-07 |
Family
ID=44524486
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200718038U Expired - Fee Related CN201961952U (en) | 2011-03-18 | 2011-03-18 | Electronic translation of novel bridge crane clamp |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201961952U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106672792A (en) * | 2017-01-07 | 2017-05-17 | 青岛蓝天创先科技服务有限公司 | Safe and rapid aerated concrete block overhead hoist |
CN108622790A (en) * | 2018-06-21 | 2018-10-09 | 安徽马钢和菱实业有限公司 | A kind of coil of strip hoisting mechanism |
-
2011
- 2011-03-18 CN CN2011200718038U patent/CN201961952U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106672792A (en) * | 2017-01-07 | 2017-05-17 | 青岛蓝天创先科技服务有限公司 | Safe and rapid aerated concrete block overhead hoist |
CN106672792B (en) * | 2017-01-07 | 2017-11-24 | 青岛蓝天创先科技服务有限公司 | A kind of quick handling apparatus of safe air-entrained concrete building block |
CN108622790A (en) * | 2018-06-21 | 2018-10-09 | 安徽马钢和菱实业有限公司 | A kind of coil of strip hoisting mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202594610U (en) | I-shaped beam hoisting device for hoisting of pressure steel pipe tiles | |
CN201961952U (en) | Electronic translation of novel bridge crane clamp | |
CN203255914U (en) | Unit-typed curtain wall lifting device | |
CN204873413U (en) | Portable concurrent hoist and mount frame | |
CN202186835U (en) | Device for hoisting motor stator | |
CN204529090U (en) | Electric precipitation anode plate hanging apparatus | |
CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
CN202164037U (en) | Adjustable plate hook | |
CN201495028U (en) | Horizontal hoisting tool for large-tonnage concrete segments of tunnel | |
CN201562917U (en) | Special roller device for bridge cable laying | |
CN204057010U (en) | Bucket-wheel stacker reclaimer cantilever belt conveyor counterweighted take-up | |
CN202131014U (en) | Fork hook | |
CN202988576U (en) | Simple and easy chain hoist lifting support | |
CN202575686U (en) | Self-tightening type lifting appliance | |
CN202829430U (en) | Movable type lifting appliance for comb plate expansion joint installation | |
CN203333145U (en) | Self-separation type special lifting tool for cylinder-shaped proximate matter | |
CN202609752U (en) | Edge protection device for steel structure lifting | |
CN206457791U (en) | A kind of dam monitoring instrument embedding protection device | |
CN206969602U (en) | One kind send die device | |
CN205772813U (en) | For 40 tons of door machines built-in decelerator remove and install one suspender | |
CN206858031U (en) | A kind of preventing wire rope from falling slot device | |
CN102756988A (en) | Movable sling for mounting expansion joint of comb plate | |
CN205087799U (en) | Horizontal clamp special lifting device | |
CN208087122U (en) | A kind of slow hanging dress furred ceiling table apparatus of machinery | |
CN201665468U (en) | Lifting device for disassembling and assembling a furnace roller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110907 Termination date: 20160318 |
|