CN201956748U - Intelligent high-voltage forward electricity purchasing meter - Google Patents

Intelligent high-voltage forward electricity purchasing meter Download PDF

Info

Publication number
CN201956748U
CN201956748U CN2010206615191U CN201020661519U CN201956748U CN 201956748 U CN201956748 U CN 201956748U CN 2010206615191 U CN2010206615191 U CN 2010206615191U CN 201020661519 U CN201020661519 U CN 201020661519U CN 201956748 U CN201956748 U CN 201956748U
Authority
CN
China
Prior art keywords
management terminal
load management
data
meter
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206615191U
Other languages
Chinese (zh)
Inventor
谭珍忠
胡伟强
戴艳平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENZHOU DONGTANG ELECTRIC EQUIPMENT Co Ltd
Original Assignee
CHENZHOU DONGTANG ELECTRIC EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENZHOU DONGTANG ELECTRIC EQUIPMENT Co Ltd filed Critical CHENZHOU DONGTANG ELECTRIC EQUIPMENT Co Ltd
Priority to CN2010206615191U priority Critical patent/CN201956748U/en
Application granted granted Critical
Publication of CN201956748U publication Critical patent/CN201956748U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model relates to an intelligent high-voltage forward electricity purchasing meter, which consists of a high-voltage vacuum circuit breaker (1), a current transformer (CT), a potential transformer (PT), a prepayment electricity meter (2), an electric power load management terminal and a center computer of a control center main station, wherein the electric power load management terminal comprises a data collection controller (3) and a data receiving and sending device module (4) which use a singlechip as a core, a watchdog circuit (5), an RS485 interface (6), a state collection interface and a control output interface (9) are arranged on the data collection controller (3), and the data receiving and sending device module (4) of the electric power load management terminal carries out data communication with the center data receiving and sending device module of the control center main station through global system for mobile communications/general packet radio service (GSM/GPRS) network via a transmission control protocol/internet protocol (TCP/IP) protocol. The intelligent high-voltage forward electricity purchasing meter can realize the electric energy metering and the prepayment electricity purchasing, and the electricity purchasing control, the protection and the detection of electric appliances can be realized.

Description

Intelligent high-pressure is purchased electric metering device in advance
Technical field
The utility model relates to the forward purchasing electricity remote monitoring device based on mobile communication network, and particularly a kind of intelligent high-pressure is purchased electric metering device in advance.
Background technology
Along with urban construction and economic development; power demand increases day by day; power industry high speed development, distribution network also constantly enlarge, and all kinds of electricity consumption clients are more and more; corresponding to the metering of needs use high voltage; the department of monitoring and protection requirement in real time is also more and more higher again, and electrical management progressively moves towards to standardize, the marketization, and it is imperative that electric power moves towards market as a kind of commodity; the progressively foundation of electricity markets at different levels certainly will propose new requirement to the operation and management of electrical network.At present sales department and infrastructure management company rely on manual metering merely, and that personnel dispose is many, efficient is low, poor accuracy, to copy the fetch cycle long, is difficult to adapt to electric power development and requirement of client.In order to satisfy the operation requirement of electricity market, reach the purpose that reduces people's synergy, building reliable, a practical electrical energy automatic measure system and protecting control system automatically is imperative trend.
The utility model content
Technical problem to be solved in the utility model is, designs a kind of intelligent high-pressure that replaces the small-sized power consumer of artificial centering to carry out remote monitoring, metering and purchases electric metering device in advance, and realization electric energy metrical, pre-payment are purchased; And electrical equipment carried out purchase electric control, protection and detection.
Its technical scheme is: a kind of intelligent high-pressure is purchased electric metering device in advance, is made up of the centralized computer of high-pressure vacuum breaker, current transformer, voltage transformer, prepayment meter, electricity load management terminal and main website of control centre; Electricity load management terminal comprises data acquisition controller and the data collector module that a single-chip microcomputer is a core; Data acquisition controller has the watchdog circuit that cooperates with management software to be connected; Current transformer, voltage transformer and prepayment meter are connected with data acquisition controller by the RS485 interface; Data acquisition controller connects door of meter casing transducer and voltage transformer respectively by the state acquisition interface; Data acquisition controller also connects electric operator control high-pressure vacuum breaker by the control output interface; The centralized computer of main website of above-mentioned control centre connects one or more centre data transceiver modules; Rely on the TCP/IP host-host protocol to carry out data communication by the GSM/GPRS network between the data collector module of electricity load management terminal and the centre data transceiver module of main website of control centre.
For the data communication of the centralized computer that guarantees electricity load management terminal and main website of control centre is not interrupted by fault; Be connected with reserve battery on the power supply of above-mentioned electricity load management terminal.
High-pressure vacuum breaker of the present utility model is the executive component that cuts off and connect main circuit, current-voltage transformer measures by the electric weight that secondary coil and no-load voltage ratio counting circuit are consumed, the pre-enough electric situations of pre-paying kilowatt-hour meter reflection can realize hanging down the signal output that electric weight is reported to the police and owed electricity charge tripping operation.
The utility model passes through electricity load management terminal, electric weight is gathered calculating, control and management, have earlier pay dues, the back electricity consumption, do not have and take the outage of prompting back, not only available IC-card control also can realize GPRS/GSM remote control, remote signalling and remote measurement, realize overcurrent and fast tripping protection, in time cut off the function of load current; Whole device does not have the energized conductor of exposing, and has good anti-stealing electricity function.But both VD4 vacuum circuit-breakers of adapted ABB AB, but the homemade VSI type vacuum circuit-breaker of adapted again.It is a kind of electricity distributing and metering device of superior performance.Have following advantage:
1. accurately metering: 0.2S current transformer, 0.2 step voltage instrument transformer and prepayment meter are adopted in metering.
2. forward purchasing electric work energy is arranged: special-purpose VS I circuit breaker is installed in the prepayment meter of the present utility model is used for the forward purchasing electricity, the forward purchasing electricity can be realized simultaneously by dual mode.First kind of implementation: the data of gathering with electricity load management terminal are as foundation, realize the breaker tripping and closing function of rationing the power supply by electric operator control high-pressure vacuum breaker.Second kind of implementation: the special-purpose VSI circuit breaker in the prepayment meter is directly realized the breaker tripping and closing function of rationing the power supply.
3. realize power supply management in order: when country needs the supply of electric power plan to supply with, can control electricity load management terminal, realize distant place power cuts to limit consumption by Data Communication in Computer Networks.
4. set up and far copy and monitoring management: make a copy of management of power use Various types of data and analyze, can carry out data such as quality of voltage, power consumption to the client and analyze, reach the purpose of remote monitoring.
Description of drawings
Fig. 1 is the structural representation of a kind of embodiment of the present utility model;
Among the figure: 1 high-pressure vacuum breaker; 2 prepayment meters; 3 data acquisition controllers; 4 data collector modules; 5 watchdog circuits; The 6RS485 interface; 7 state acquisition interfaces; 8 door of meter casing transducers; 9 control output interfaces; 10 electric operators; 11 power supplys; 12 reserve batteries; The CT current transformer; The PT voltage transformer.
Embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail:
As shown in Figure 1, a kind of intelligent high-pressure is purchased electric metering device in advance, is made up of the centralized computer of high-pressure vacuum breaker 1, current transformer CT, voltage transformer pt, prepayment meter 2, electricity load management terminal and main website of control centre; Electricity load management terminal comprises data acquisition controller 3 and the data collector module 4 that a single-chip microcomputer is a core; Data acquisition controller 3 has the watchdog circuit 5 that cooperates with management software to be connected; Current transformer CT, voltage transformer pt and prepayment meter 2 are connected with data acquisition controller 3 by RS485 interface 6; Data acquisition controller 3 connects door of meter casing transducer 8 and voltage transformer pt respectively by state acquisition interface 7; Data acquisition controller 3 also connects electric operator 10 control high-pressure vacuum breakers 1 by control output interface 9; The centralized computer of main website of above-mentioned control centre connects one or more centre data transceiver modules; Rely on the TCP/IP host-host protocol to carry out data communication by the GSM/GPRS network between the data collector module 4 of electricity load management terminal and the centre data transceiver module of main website of control centre.Be connected with reserve battery 12 on the power supply 11 of described electricity load management terminal.

Claims (2)

1. an intelligent high-pressure is purchased electric metering device in advance, is made up of the centralized computer of high-pressure vacuum breaker (1), current transformer (CT), voltage transformer (PT), prepayment meter (2), electricity load management terminal and main website of control centre; Electricity load management terminal comprises that a single-chip microcomputer is data acquisition controller of core (3) and data collector module (4); It is characterized in that: data acquisition controller (3) has the watchdog circuit (5) that cooperates with management software to be connected; Current transformer (CT), voltage transformer (PT) and prepayment meter (2) are connected with data acquisition controller (3) by RS485 interface (6); Data acquisition controller (3) connects door of meter casing transducer (8) and voltage transformer (PT) respectively by state acquisition interface (7); Data acquisition controller (3) also connects electric operator (10) control high-pressure vacuum breaker (1) by control output interface (9); The centralized computer of main website of above-mentioned control centre connects one or more centre data transceiver modules; Rely on the TCP/IP host-host protocol to carry out data communication by the GSM/GPRS network between the data collector module (4) of electricity load management terminal and the centre data transceiver module of main website of control centre.
2. intelligent high-pressure according to claim 1 is purchased electric metering device in advance; It is characterized in that: be connected with reserve battery (12) on the power supply of described electricity load management terminal (11).
CN2010206615191U 2010-12-09 2010-12-09 Intelligent high-voltage forward electricity purchasing meter Expired - Fee Related CN201956748U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206615191U CN201956748U (en) 2010-12-09 2010-12-09 Intelligent high-voltage forward electricity purchasing meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206615191U CN201956748U (en) 2010-12-09 2010-12-09 Intelligent high-voltage forward electricity purchasing meter

Publications (1)

Publication Number Publication Date
CN201956748U true CN201956748U (en) 2011-08-31

Family

ID=44500850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206615191U Expired - Fee Related CN201956748U (en) 2010-12-09 2010-12-09 Intelligent high-voltage forward electricity purchasing meter

Country Status (1)

Country Link
CN (1) CN201956748U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109378901A (en) * 2018-11-28 2019-02-22 国网江西综合能源服务有限公司 A kind of intelligence massive quantity power supply and measurement electricity distributing and metering pre-payment integration unit
CN112578165A (en) * 2020-12-30 2021-03-30 深圳市科陆电子科技股份有限公司 Multifunctional intelligent meter box management terminal

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109378901A (en) * 2018-11-28 2019-02-22 国网江西综合能源服务有限公司 A kind of intelligence massive quantity power supply and measurement electricity distributing and metering pre-payment integration unit
CN112578165A (en) * 2020-12-30 2021-03-30 深圳市科陆电子科技股份有限公司 Multifunctional intelligent meter box management terminal

Similar Documents

Publication Publication Date Title
CN101908780B (en) Intelligent remote monitoring box-type substation
CN1909326B (en) Low-voltage intelligent anti-theft measuring pocket
CN201234165Y (en) Automatic control apparatus for power distribution system
CN101873010A (en) Intelligent monitoring terminal of electric distribution system
CN205068599U (en) One -phase fee -controlling intelligent electric energy meter
CN201750078U (en) Intelligent remote control box type substation
CN102436732A (en) Electric energy quality type energy efficiency data acquisition terminal
CN104269040A (en) Power utilization information acquisition and orderly power utilization management system
CN201541098U (en) Intelligent energy consumption monitoring and measuring single-phase distribution box
CN200996970Y (en) Charge-evasion preventer for comparing high-voltage end and low-voltage end quantity
CN108327567A (en) A kind of intelligent electric vapour charging pile client connection system
Sui et al. An AMI based measurement and control system in smart distribution grid
CN210591449U (en) Electric automobile fills electric pile timesharing sharing control management system
CN201435620Y (en) Electric energy monitoring and operation management system of high voltage user
CN202535162U (en) Electronic mutual inductor-based intelligent high-voltage power distribution switch
CN204794372U (en) Long -range charge control system of circuit breaker on post
CN102435889A (en) Harmonic electric quantity type energy efficiency acquisition terminal
CN102624090A (en) Intelligent high-voltage distribution switch based on electronic transducer
CN201956748U (en) Intelligent high-voltage forward electricity purchasing meter
CN201860040U (en) Intelligent distribution cabinet provided with grounding switch and integrating remote communication control and short message transmission
CN201508485U (en) Prepay electric energy metering control device
CN108519503A (en) Intelligent electric energy meter based on NB-IOT communications
CN201345131Y (en) GPRS remote high-voltage prepayment device
CN203025244U (en) Power failure alarm device of power distribution room
CN201270385Y (en) Intelligent synthetic electric distribution box

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110831

Termination date: 20131209