CN201953130U CN2010206315483U CN201020631548U CN201953130U CN 201953130 U CN201953130 U CN 201953130U CN 2010206315483 U CN2010206315483 U CN 2010206315483U CN 201020631548 U CN201020631548 U CN 201020631548U CN 201953130 U CN201953130 U CN 201953130U
Authority
CN
China
Prior art keywords
arm
line
steel tube
tube tower
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206315483U
Other languages
English (en)
Inventor
钮铁军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUJIANG POWER SUPPLY Co Ltd JIANGSU ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Suzhou Power Supply Co Ltd of Jiangsu Electric Power Co
Original Assignee
WUJIANG POWER SUPPLY Co Ltd JIANGSU ELECTRIC POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUJIANG POWER SUPPLY Co Ltd JIANGSU ELECTRIC POWER Co Ltd filed Critical WUJIANG POWER SUPPLY Co Ltd JIANGSU ELECTRIC POWER Co Ltd
Priority to CN2010206315483U priority Critical patent/CN201953130U/zh
Application granted granted Critical
Publication of CN201953130U publication Critical patent/CN201953130U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型公开了一种输电线路钢管塔,包括钢管塔主干,所述钢管塔主干上设置有若干支线横担,所述支线横担的尾端通过耐张线夹连接支线,所述钢管塔主干上还设置有主线横担,所述主线横担与所述支线横担交错布置,所述主线横担的担臂上连接有用于悬挂主线的悬垂线夹。通过本实用新型的输电线路钢管塔,在施工时,对外停电时间短;投入线路金具材料少;施工人员和用工量减少;现场使用工器具减少。

Description

一种输电线路钢管塔
技术领域
本实用新型涉及一种输电线路钢管塔。
背景技术
目前常规的输电线路钢管塔,其由钢管塔主干以及设置在主干上的若干支线横担组成,施工方法均是将钢管塔组立后,将双回主线开耐张过线,然后实施支线与主线的连接,其一般的具体实施步骤如下:
1、前后二基干先要把导线锚住,需要用12根Φ16的钢丝绳用线夹夹住,导线锚在地锚上;
2、用机动绞磨拉住导线,再开断导线,松至地面;
3、做液压连接耐张线夹;
4、紧线、挂线、前后二基干塔拆除锚线钢丝绳等;
5、做跳线连接;
所需人力、物力大概如下:
工人16个,机动绞磨2台,紧松线钢丝绳2根,液压机1台及其他。
在可以使用吊车组立钢管塔的前提下,该类停电施工一般也需8小时左右,在目前输变电可靠性要求日益提高的大环境下,将对可靠性数据产生极大的影响。
实用新型内容
为克服现有技术中的不足,本实用新型的目的在于提供一种输电线钢管塔。
为了解决上述技术问题,实现上述目的,本实用新型采用了如下技术方案:
一种输电线路钢管塔,包括钢管塔主干,所述钢管塔主干上设置有若干支线横担,所述支线横担的尾端通过耐张线夹连接支线,所述钢管塔主干上还设置有主线横担,所述主线横担与所述支线横担交错布置,所述主线横担的担臂上连接有用于悬挂主线的悬垂线夹。
优选地,所述主线横担的担臂上设置有一对悬垂线夹,所述的一对悬垂线夹成“V”字形设置。
使用本实用新型的输电线路钢管塔的施工方法,包括以下步骤:
步骤1.所述输电线路钢管塔竖立完毕后,用提线器把主线提升至悬垂线夹的安装点并固定住,然后撤离提线器;
步骤2.所述支线横担通过耐张线夹连接支线;
步骤3.通过一连接线将所述支线与主线连接导通。
与现有技术相比,本实用新型具有以下优点:
通过本实用新型的输电线路钢管塔,在施工时,对外停电时间短;投入线路金具材料少;施工人员和用工量减少;现场使用工器具减少。
上述说明仅是本实用新型技术方案的概述,为了能够更清楚了解本实用新型的技术手段,并可依照说明书的内容予以实施,以下以本实用新型的较佳实施例并配合附图详细说明如后。本实用新型的具体实施方式由以下实施例及其附图详细给出。
附图说明
图1为本实用新型的输电线路钢管塔的结构示意图。
图中标号说明:1、钢管塔主干,2、主线横担,3、支线横担,4、悬垂线夹,5、主线,6、连接线,7、耐张线夹,8、支线。
具体实施方式
下面结合附图和实施例对本实用新型的技术实施过程做进一步说明。
参见图1所示,一种输电线路钢管塔,包括钢管塔主干1,所述钢管塔主干1上设置有若干支线横担3,所述支线横担3的尾端通过耐张线夹7连接支线8,所述钢管塔主干1上还设置有主线横担2,所述主线横担2与所述支线横担3交错布置,所述主线横担2的担臂上连接有用于悬挂主线5的悬垂线夹4。
优选地,所述主线横担2的担臂上设置有一对悬垂线夹4,所述的一对悬垂线夹4成“V”字形设置。
使用本实用新型的输电线路钢管塔的施工方法,包括以下步骤:
步骤1.所述输电线路钢管塔竖立完毕后,用提线器把主线5提升至悬垂线夹4的安装点并固定住,然后撤离提线器;
步骤2.所述支线横担3通过耐张线夹7连接支线8;
步骤3.通过一连接线6将所述支线8与主线5连接导通。
上述实施例只是为了说明本实用新型的技术构思及特点,其目的是在于让本领域内的普通技术人员能够了解本实用新型的内容并据以实施,并不能以此限制本实用新型的保护范围。凡是根据本实用新型内容的实质所作出的等效的变化或修饰,都应涵盖在本实用新型的保护范围内。

Claims (2)

1.一种输电线路钢管塔,包括钢管塔主干(1),所述钢管塔主干(1)上设置有若干支线横担(3),所述支线横担(3)的尾端通过耐张线夹(7)连接支线(8),其特征在于:所述钢管塔主干(1)上还设置有主线横担(2),所述主线横担(2)与所述支线横担(3)交错布置,所述主线横担(2)的担臂上连接有用于悬挂主线(5)的悬垂线夹(4)。
2.根据权利要求1所述的输电线路钢管塔,其特征在于:所述主线横担(2)的担臂上设置有一对悬垂线夹(4),所述的一对悬垂线夹(4)成“V”字形设置。
CN2010206315483U 2010-11-29 2010-11-29 一种输电线路钢管塔 Expired - Fee Related CN201953130U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206315483U CN201953130U (zh) 2010-11-29 2010-11-29 一种输电线路钢管塔

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206315483U CN201953130U (zh) 2010-11-29 2010-11-29 一种输电线路钢管塔

Publications (1)

Publication Number Publication Date
CN201953130U true CN201953130U (zh) 2011-08-31

Family

ID=44497249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206315483U Expired - Fee Related CN201953130U (zh) 2010-11-29 2010-11-29 一种输电线路钢管塔

Country Status (1)

Country Link
CN (1) CN201953130U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102477810A (zh) * 2010-11-29 2012-05-30 江苏省电力公司吴江市供电公司 一种输电线路钢管塔及其施工方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102477810A (zh) * 2010-11-29 2012-05-30 江苏省电力公司吴江市供电公司 一种输电线路钢管塔及其施工方法

Similar Documents

Publication Publication Date Title
CN105140863A (zh) 一种架设线缆使用的安全备份线夹
CN205777821U (zh) 新型拉线下拔
CN102477810A (zh) 一种输电线路钢管塔及其施工方法
CN201953130U (zh) 一种输电线路钢管塔
CN102593624A (zh) 一种输电线路专用接地线
CN101749367A (zh) 拉线回头压接套管
CN205650733U (zh) 可调节拉线专用弯线装置
CN102704828A (zh) 多功能挂梯
CN203281765U (zh) 拉线制作专用工具
CN103683098A (zh) 不落线更换耐张型电杆法
CN203278089U (zh) 拉线弯线钳
CN202047641U (zh) 电力线路杆塔拉线的尾线固定装置
CN204575310U (zh) 预应力筋多孔锚具组装件静载试验预紧装置
CN201413967Y (zh) 输变电工程架线的导线防磨损辊轮装置
CN210508619U (zh) 一种门型悬索拉线塔
CN203370983U (zh) 一种拉线制作器
CN209480983U (zh) 一种光伏配电防绕线排线装置
CN203756202U (zh) 一种竖向锚索快速送索装置
CN203504107U (zh) 预绞式接续管补强接续条
CN2912029Y (zh) "v"形绝缘子串带电更换装置
CN206820423U (zh) 一种拉线楔形线夹
CN203356487U (zh) 一种钢绳矫直器
CN201804617U (zh) 一种自承式架空绝缘电缆
CN201808963U (zh) 一种用于电线下线机的辅助工具
CN207967874U (zh) 一种设有压接标识带的耐张线夹

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU ELECTRIC POWER COMPANY STATE GRID CORPORAT

Effective date: 20121207

Owner name: SUZHOU POWER SUPPLY COMPANY OF JIANGSU ELECTRIC PO

Free format text: FORMER OWNER: WUJIANG POWER SUPPLY COMPANY OF JIANGSU ELECTRIC POWER COMPANY

Effective date: 20121207

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 215200 SUZHOU, JIANGSU PROVINCE TO: 215004 SUZHOU, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20121207

Address after: 215004 No. three Xiang Xiang Road, Suzhou, Jiangsu, 458

Patentee after: Suzhou Power Supply Co., Ltd. of Jiangsu Electric Power Company

Patentee after: Jiangsu Electric Power Company

Patentee after: State Grid Corporation of China

Patentee after: Wujiang Power Supply Co., Ltd., Jiangsu Electric Power Co., Ltd.

Address before: 215200 Wujiang City, Jiangsu province Pine Township Road No. 518

Patentee before: Wujiang Power Supply Co., Ltd., Jiangsu Electric Power Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110831

Termination date: 20191129

CF01 Termination of patent right due to non-payment of annual fee