Sand inclusion glass steel integral well Download PDF

Info

Publication number
CN201915417U
CN201915417U CN2010205967032U CN201020596703U CN201915417U CN 201915417 U CN201915417 U CN 201915417U CN 2010205967032 U CN2010205967032 U CN 2010205967032U CN 201020596703 U CN201020596703 U CN 201020596703U CN 201915417 U CN201915417 U CN 201915417U
Authority
CN
China
Prior art keywords
well
glass steel
wellhole
wall
pit shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205967032U
Other languages
Chinese (zh)
Inventor
周永清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YONGCHANG SEKISUI COMPOSITES CO Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010205967032U priority Critical patent/CN201915417U/en
Application granted granted Critical
Publication of CN201915417U publication Critical patent/CN201915417U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The utility model relates to a sand inclusion glass steel integral well, belonging to the field of the waterwork construction. A hollow cylinder wellhole is made of glass steel with a quartz sand layer, two ends of the hollow cylinder wellhole are opened, and two hollow cylindrical pipeline interfaces are machined on a wellhole wall in the diameter direction, a crawling ladder is made of the glass steel, and is stuck on a wellhole inner wall, an n-shaped upper cover and an inverted n-shaped bottom base are made of reinforced concrete, and one side of the upper cover is opened, so that personnel can go into a well. The inner side of the inverted n-shaped bottom base is provided with an anti-corrosion and impermeable layer made of resin mortar, and the combination position of the upper cover, the bottom base and the outer wall of the wellhole is filled with sealing rubber. A well body has stronger strength and rigidity, the differential settlement is small, the pipeline is not easy to cut to be damaged, the service life is long, the maintenance expense is less, and the manufacturing cost is low. The sand inclusion glass steel integral well can be conveniently prefabricated and assembled in a factory or a site, so that the outdoor construction time can be greatly shortened. The sand inclusion glass steel integral well can be used for swamps, rivers or environments with severe soil erosion.

Description

Burning into sand glass fibre reinforced plastic integral well chamber
Technical field
Burning into sand glass fibre reinforced plastic integral well of the present utility model chamber belongs to the hydraulic architecture field, relates in particular to a kind of valve well, wet-well.
Background technology
Existing valve well, wet-well are generally brick or concreting forms, and the well body is thick and heavy, must do specially treated on the basis of soft foundation well body.Because well body settling amount is big, easily cuts up pipeline.When underground water level was higher, the well body just need be done antiseepage and handle as time passes, and the barrier performance of well body often descends, and for preventing that sulfate ion is to concrete corrosion in the soil, the external surface of well body also will be done preservative treatment.Brick, concreting, smear waterproofing course, do traditional well body constructions such as anticorrosive coat, take a lot of work and time-consuming.
Summary of the invention
The purpose of this utility model is that a kind of anticorrosion, antiseepage, in light weight, quick construction, the rational burning into sand glass fibre reinforced plastic integral of cost well chamber will be provided.
The purpose of this utility model is achieved in that a kind of burning into sand glass fibre reinforced plastic integral well chamber, constitute by pit shaft, pipe joint, loam cake and base, glass fiber reinforced plastic with horsestone English layer of sand produces cavity cylinder pit shaft, its open at both ends is produced two cavity cylindrical tubes pipeline joints on diametric well bore wall.Produce cat ladder with glass fiber reinforced plastic, it is bonded on the shaft in wall.Produce the ∏ shape loam cake and the Ц shape base of pit shaft with steel concrete, loam cake one side opening is gone into the well for personnel.Ц shape base inboard, pit shaft outer wall and pipe joint are made the anti-corrosion leak-proof layer with resin mortar, and the junction of ∏ shape loam cake and Ц shape base and pit shaft outer wall is equiped with caulking gum.
Because of glass-reinforced plastic material has characteristics such as corrosion resistance is strong, in light weight, pit shaft adopts the glass fiber reinforced plastic that adds quartz sand to make, just make pit shaft that stronger intensity and rigidity are not only arranged, and well body differential settlement is little, is difficult for cutting up pipeline, life-span is long, maintenance cost is few, and cost of manufacture is low, can in factory or the scene is prefabricated easily and assembling, make that the engineering time shortens greatly in the open air, can be used in the serious adverse circumstances of marsh, river or soil corrosion.
Description of drawings
Concrete structure of the present utility model is provided by following embodiment and accompanying drawing
Fig. 1 is the structural representation of burning into sand glass fibre reinforced plastic integral well chamber
Fig. 2 is the schematic top plan view of burning into sand glass fibre reinforced plastic integral well chamber
The specific embodiment
Legend: 1, base 2, anti-corrosion leak-proof layer 3, pit shaft 4, caulking gum 5, earth anchor 6, loam cake 7, cat ladder 8, pipe joint 9, import and export
Embodiment: shown in Fig. 1-2, produce cavity cylinder pit shaft 3 with the glass fiber reinforced plastic of horsestone English layer of sand, its open at both ends is produced two cavity cylindrical tubes pipeline joints 8 on the wall of diametric pit shaft 3.Produce cat ladder 7 with glass fiber reinforced plastic, it is bonded on the inwall of pit shaft 3.Produce the ∏ shape loam cake 6 and the Ц shape base 1 of pit shaft 3 with steel concrete, loam cake 6 one sides have imports and exports 9, goes into the well on the personnel.Anti-corrosion leak-proof layer 2 is made with resin mortar in Ц shape base 1 inboard, and shape loam cake 6 and Ц shape base 1 are equiped with caulking gum 4 with the outer wall junction of pit shaft 3.
During construction, according to the corrosivity and the well body length of embedment of well body place soil in the pipeline, the anti-corrosion layer resinous type and being used to of determining well body 3 is made the rigidity of glass reinforced plastic pipe of the horsestone English layer of sand of pit shaft 3.Determine the diameter of pit shaft 3 and pipe joint 8 according to be correlated with drawing and standard.At pit shaft 3 diameters hour, loam cake 6 can be prefabricated in factory with base 1, when fit together with pit shaft 3.For preventing to damage in the transportation, between pit shaft 3 and loam cake 6, base 1, fix with earth anchor 5.When pit shaft 3 is big, but cast on-site base 1 and loam cake 6.The anti-corrosion leak-proof layer 2 of pit shaft 3 and pipe joint 8 is manufactured its material after the crystal assembling finishes be resin mortar, will polish in the surface of pit shaft 3 and pipe joint 8, removes foreign material.

Claims (2)

1. burning into sand glass fibre reinforced plastic integral well chamber, constitute by pit shaft, pipe joint, loam cake and base, it is characterized in that: pit shaft is the cavity cylinder, open at both ends, two cavity cylindrical tubes pipeline joints are arranged on diametric well bore wall, be bonded with cat ladder on the shaft in wall, base inboard, pit shaft outer wall and pipe joint have been done the anti-corrosion leak-proof layer, and the junction of loam cake and base and pit shaft outer wall is equiped with caulking gum.
2. burning into sand glass fibre reinforced plastic integral well as claimed in claim 1 chamber, the loam cake that it is characterized in that pit shaft is a П shape, and base is a Ц shape, and loam cake one side has import and export.
CN2010205967032U 2010-11-02 2010-11-02 Sand inclusion glass steel integral well Expired - Lifetime CN201915417U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205967032U CN201915417U (en) 2010-11-02 2010-11-02 Sand inclusion glass steel integral well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205967032U CN201915417U (en) 2010-11-02 2010-11-02 Sand inclusion glass steel integral well

Publications (1)

Publication Number Publication Date
CN201915417U true CN201915417U (en) 2011-08-03

Family

ID=44415221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205967032U Expired - Lifetime CN201915417U (en) 2010-11-02 2010-11-02 Sand inclusion glass steel integral well

Country Status (1)

Country Link
CN (1) CN201915417U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102465538A (en) * 2010-11-02 2012-05-23 周永清 Integral sand-inclusion glass fiber reinforced plastic well chamber
CN105839765A (en) * 2016-05-17 2016-08-10 昆山市东部自来水管道安装有限公司 Siamesed sewage well
CN107313457A (en) * 2017-08-04 2017-11-03 东营市天诚建材有限公司 High-strength corrosion-resistant loses Household glass fiber reinforced plastic table well and production technology

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102465538A (en) * 2010-11-02 2012-05-23 周永清 Integral sand-inclusion glass fiber reinforced plastic well chamber
CN105839765A (en) * 2016-05-17 2016-08-10 昆山市东部自来水管道安装有限公司 Siamesed sewage well
CN107313457A (en) * 2017-08-04 2017-11-03 东营市天诚建材有限公司 High-strength corrosion-resistant loses Household glass fiber reinforced plastic table well and production technology

Similar Documents

Publication Publication Date Title
CN201232197Y (en) Combined inspection well
CN202850177U (en) Reinforced steel skeleton plastic inspection well
CN201915417U (en) Sand inclusion glass steel integral well
CN106049551A (en) Utility tunnel boss seal structure
CN112761188A (en) Construction structure and construction method of concrete inverted hanging well suitable for mucky soil
CN204267915U (en) Strengthen the two rubber sealing reinforced concrete sewer pipe of jacking construction corrosion protection
CN202466631U (en) Prefabricated reinforced concrete inspection well and die thereof
CN204418141U (en) The channel of a kind of light-duty anticorrosion final stage plastics channel component and formation thereof
CN201520987U (en) Flexible bag-type corrosion prevention device and anti-corrosion pile using same
CN111733853A (en) Tongue-and-groove type prefabricated underground continuous wall structure
CN204004780U (en) Can peg graft concrete drain tile and the socket steel ring for this waste pipe
CN2627065Y (en) Combined glass reinforced plastic well
CN102465538A (en) Integral sand-inclusion glass fiber reinforced plastic well chamber
CN101538891B (en) Non-excavation fiber glass reinforced plastics inspection well and construction method thereof
CN203296069U (en) Round precast concrete inspection well
CN206054970U (en) Framework of steel reinforcement steel pipe concrete pipe and the pipeline being made from it
CN201400679Y (en) Prestressed steel cylinder concrete marsh gas generation tank
CN208295326U (en) Full corrosion-proof lining formula Prestressed concrete cylinder pipe
CN207633358U (en) A kind of prefabricated assembled pipe gallery jointing construction
CN203393828U (en) Rectangular reinforced concrete prefabricated inspection well
CN106592635A (en) Integrated inspection shaft and installation method thereof
CN204080861U (en) Inspection-pit between a kind of Novel top pipeline section
CN202913497U (en) Planomural winding pipeline plate-strip used for repairing rainy sewer pipeline
CN209975580U (en) Prefabricated assembled anticorrosive concrete inspection shaft
CN208024964U (en) The embed-type Prestressed concrete cylinder pipe of full anti-corrosion

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: ZHOU QIANG

Effective date: 20130823

Owner name: YONGCHANG JISHUI COMPOSITE MATERIAL CO., LTD.

Free format text: FORMER OWNER: ZHOU YONGQING

Effective date: 20130823

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130823

Address after: 831400 the Xinjiang Uygur Autonomous Region Urumqi Midong District revitalization Road Yongchang water composite materials Co Ltd

Patentee after: Yongchang Sekisui Composites Co., Ltd.

Address before: 831400 the Xinjiang Uygur Autonomous Region Urumqi Midong District revitalization Road Yongchang water composite materials Co Ltd

Patentee before: Zhou Yongqing

Patentee before: Zhou Qiang

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110803