CN201908359U - Electric power test site long-term electrified square frame - Google Patents

Electric power test site long-term electrified square frame Download PDF

Info

Publication number
CN201908359U
CN201908359U CN2011200296430U CN201120029643U CN201908359U CN 201908359 U CN201908359 U CN 201908359U CN 2011200296430 U CN2011200296430 U CN 2011200296430U CN 201120029643 U CN201120029643 U CN 201120029643U CN 201908359 U CN201908359 U CN 201908359U
Authority
CN
China
Prior art keywords
power test
truss
long
electric power
square frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200296430U
Other languages
Chinese (zh)
Inventor
何运祥
章东鸿
黄炳权
庄志伟
金晓华
何天胜
李敏生
林方新
潘春平
秦慧琳
徐力
刘万群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
Guangdong Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Electric Power Design Institute filed Critical Guangdong Electric Power Design Institute
Priority to CN2011200296430U priority Critical patent/CN201908359U/en
Application granted granted Critical
Publication of CN201908359U publication Critical patent/CN201908359U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The utility model provides an electric power test site long-term electrified square frame, which is formed by joining a plurality of steel pipes, and comprises four upright posts which are vertically arranged on the ground, and at least four trusses, wherein the four trusses are connected with two adjacent upright posts to form a square structure. The electric power test site long-term electrified square frame with a full-steel structure has a light structure and good rigidity, and is difficult to deform under the situation of being influenced by external force.

Description

The long-term charged square framework in power test base
Technical field
The utility model relates to the UHV transmission field, relates in particular to the last charged square framework in a kind of power test base.
Background technology
Domestic extra-high voltage electric power proving ground framework adopts the angle steel structure more at present, but the span of this structure is little, and rigidity is relatively poor, and wind resistance, anti-seismic performance etc. all can not satisfy the requirement of large-scale experiment, and test capability is weak, building size is restricted.The lifting appliance that at present domestic extra-high voltage electric power proving ground framework adopts is the railless electric cucurbit, its fixed-site, and test capability is restricted.
Summary of the invention
The utility model provides a kind of electric power experiment base long-term charged square framework, and it has good wind resistance, anti seismic efficiency, and good rigidity can satisfy the sophisticated testing requirement of all kinds of big loadings, big scale of construction electric power facility.
The utility model is achieved in that
The long-term charged square framework in a kind of power test base, it adopts a plurality of steel pipes to be connected to form.The long-term charged square framework in the power test base of full steel structure, its structure is slim and graceful, and good rigidity is under the situation that is subjected to the external force influence, not yielding.
Preferably, it includes: four columns that are provided with perpendicular to ground, and at least four truss, four described truss connect two adjacent columns, form square structure.
Preferably, it includes 6 truss, forms double-deck truss.
Preferably, described truss is provided with the crane of using for lifting appliance, the various heavy testing equipments of conveniently slinging.Crane adopts monorail crane, can satisfy the testing equipment lifting of diverse location at the vertical walking freely of truss.
Preferably, described crane is located at the truss that is positioned at the below in the described double-deck truss.
The utility model has following beneficial effect with respect to prior art:
The long-term charged square framework in the utility model power test base, its wind resistance, anti-seismic performance are good, satisfy the sophisticated testing requirement of all kinds of big loadings, big scale of construction electric power facility preferably, simultaneously himself weight saving.But the crane walking freely of hoisting test equipment is convenient and reliable.
Description of drawings
Fig. 1 is the long-term charged square framework of the utility model power test.
The specific embodiment
Below in conjunction with accompanying drawing embodiment of the present utility model is elaborated:
As shown in Figure 1, the long-term charged square framework in the utility model power test base, it includes: four columns 1 that are provided with perpendicular to ground, and six truss 2, six described truss 2 are 4 truss wherein, connect two adjacent columns 1, form square structure, other 2 truss 2 form double-deck truss with wantonly two truss 2.The quantity of described truss 2 can increase according to the demand of extra-high voltage test, is not limited only to 4 or 4.In the utility model, described column 1 and described truss 2 all adopt a plurality of steel pipes to interconnect and form.The long-term charged square framework in the power test base of full steel structure, good rigidity, under the situation that is subjected to the external force influence, not yielding; And structure is slim and graceful, compares with conventional art angle steel structure, and himself weight reduces about 20%.
Preferably, described truss is provided with the crane of using for lifting appliance 3, and the various heavy testing equipments of conveniently slinging use for convenience, and described crane 3 is located at the truss 2 that is positioned at the below in the described double-deck truss.
Only be specific embodiment of the utility model below, do not limit protection domain of the present utility model with this; Any replacement and the improvement done on the basis of not violating the utility model design all belong to protection domain of the present utility model.

Claims (5)

1. the long-term charged square framework in power test base is characterized in that it adopts a plurality of steel pipes to be connected to form.
2. the long-term charged square framework in power test as claimed in claim 1 base is characterized in that it includes: four columns that are provided with perpendicular to ground, and at least four truss, four described truss connect two adjacent columns, form square structure.
3. the long-term charged square framework in power test as claimed in claim 2 base is characterized in that it includes 6 truss, forms double-deck truss.
4. as the long-term charged square framework of claim 2 or 3 described power test bases, it is characterized in that described truss is provided with the crane of using for lifting appliance.
5. the long-term charged square framework in power test as claimed in claim 4 base is characterized in that described crane is located at the truss that is positioned at the below in the described double-deck truss.
CN2011200296430U 2011-01-28 2011-01-28 Electric power test site long-term electrified square frame Expired - Fee Related CN201908359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200296430U CN201908359U (en) 2011-01-28 2011-01-28 Electric power test site long-term electrified square frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200296430U CN201908359U (en) 2011-01-28 2011-01-28 Electric power test site long-term electrified square frame

Publications (1)

Publication Number Publication Date
CN201908359U true CN201908359U (en) 2011-07-27

Family

ID=44300563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200296430U Expired - Fee Related CN201908359U (en) 2011-01-28 2011-01-28 Electric power test site long-term electrified square frame

Country Status (1)

Country Link
CN (1) CN201908359U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234451A (en) * 2014-08-13 2014-12-24 华北水利水电大学 Subway ventilation kiosk

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234451A (en) * 2014-08-13 2014-12-24 华北水利水电大学 Subway ventilation kiosk

Similar Documents

Publication Publication Date Title
CN203967625U (en) A kind of overhead facility crossing frame
CN203835025U (en) Linear rod cross arm capable of being conveniently connected
CN202017380U (en) Equilateral steel-tube latticed equipment support column with uniform section
CN105332352A (en) On-site protection guardrail for repairing outdoor electrical equipment
CN201908359U (en) Electric power test site long-term electrified square frame
CN204144871U (en) A kind of slidingtype electric equipment gold utensil
CN201923787U (en) Portal frame of electric power test base
CN203879061U (en) Lower sandwich layer for clean room
CN102251655A (en) Multifunctional high-voltage insulated overhauling platform
CN202055602U (en) Multi-functional emergency iron tower foundation for power transmission lines
CN202850567U (en) Electric pole
CN204167729U (en) A kind of vibrating isolation system for 220kV indoor substation shunt reactor
CN202793717U (en) Hand platform vibration test clamping mechanism
CN202766139U (en) Three-dimensional multi-functional movable hoisting platform
CN201778390U (en) Structural system provided with wind turbine generator in high-rise/ultrahigh-rise building
CN203394145U (en) Overturn-preventing mushroom disk shaped pole device
CN204782189U (en) Four bars formula steel pipe combination tower
CN203334546U (en) Multi-directional connection node structure for H-sectional steel column
CN204186124U (en) The small-sized upright triangle tower of roofing
CN203613859U (en) 1,000kV/220kV UHVAC (Ultra-High Voltage Alternating Current) same-tower four-loop tension support
CN202281784U (en) Breaker experiment support
CN201593330U (en) Universal base of wire through rod, bearing rod and terminal rod for electronic fence
CN209942253U (en) Portable net rack welding ball supports alignment jig
CN202549690U (en) Arrangement construction member for disconnecting link
CN101362576A (en) Self-lifting combined tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: GUANGDONG ELECTRIC POWER DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee after: Guangdong Electric Power Design Institute of CEEC

Address before: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee before: Guangdong Electric Power Design Institute

C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC POWER DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee after: Company limited of China Energy Engineering Group Guangdong Electric Power Design Institute

Address before: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee before: Guangdong Electric Power Design Institute of CEEC

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110727

Termination date: 20180128