CN201891115U - Three-point continuous screw pile foundation - Google Patents

Three-point continuous screw pile foundation Download PDF

Info

Publication number
CN201891115U
CN201891115U CN2010205534483U CN201020553448U CN201891115U CN 201891115 U CN201891115 U CN 201891115U CN 2010205534483 U CN2010205534483 U CN 2010205534483U CN 201020553448 U CN201020553448 U CN 201020553448U CN 201891115 U CN201891115 U CN 201891115U
Authority
CN
China
Prior art keywords
pile
soil
stress
pile foundation
tube body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205534483U
Other languages
Chinese (zh)
Inventor
李杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nuosiman Energy Science & Technology (beijing) Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010205534483U priority Critical patent/CN201891115U/en
Application granted granted Critical
Publication of CN201891115U publication Critical patent/CN201891115U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a three-point continuous screw pile foundation which comprises a tube body. The tube body is integrally columnar, one end of the tube body is conical, the side surface of the other end of the tube body is fixedly connected with a raised nut, and the outer side part of the tube body is provided with a continuous spiral blade. Through the spiral blade on the tube body, the structure form of traditional pile foundation section is changed, and the interactional mode between a pile and a soil body is changed, the pile and the soil interface are in mechanical occlusion, so that the characteristic of firmness of the pile is realized. The soil body at the side of the pile is extruded and compacted during the piling process, so as to form the nut after piling, the spiral blade is in close occlusion with the side of the pile foundation, so that the acting force distribution between the soil and the pile is adjusted, the stress allocation ratio and the stress diffusance of the soil body at the side of the pile are improved, the load at the end of the pile is reduced, the stress of the pile body and the stress of the soil body are consistent, and the stable performance, unsinkability and tensile performance of the pile foundation are further enhanced.

Description

A kind of 3 continous way screw pile bases
Technical field
The utility model relates to a kind of pile foundation, especially a kind of 3 continous way screw pile bases.
Background technology
Existing solar power station construction and municipal administration, a plurality of industry construction field such as traffic (fence, flagpole, billboard, traffic indication board etc.) when doing underground foundation, normally excavate foundation ditch at the scene, ram base, assembling reinforcement cage and supporting template, cast-in-situ concrete, or bury prefabricated concrete stake backfill original soil then underground, thereby program is loaded down with trivial details, the job site is dirty and messy, and the construction period of known technology is very long, need long-term curing concrete, because of material wide in variety, tissue inconvenience, logistics cost strengthens, part wild environment constructional difficulties, working area is big, the heavy damage vegetation, can't construct by season and weather effect, be subject to special geologic condition and can't construct, increase construction cost, therefore, need a kind of more advanced pile foundation, simplify the pile foundation construction program.
Summary of the invention
The utility model provides a kind of 3 continous way screw pile bases according to building the loaded down with trivial details defective of construction sequence in the above-mentioned prior art, and the utility model is achieved by following technical proposals:
Comprise body, described body integral body is column, tapered, the multiple tooth shape of an end of described body, cross, in-line, the degree of lip-rounding of cutting sth. askew or truncation degree of lip-rounding drill bit formula metal construction, and be fixed with the outer lug nut on the side of the described body other end; The Outboard Sections of body is provided with continuous helical shape blade one.
Preferably, also be provided with anticorrosive coat outside the described pipe shaft.
Preferably, an end of described body is multiple tooth shape, cross, in-line, the degree of lip-rounding of cutting sth. askew or truncation degree of lip-rounding drill bit formula metal construction.
Preferably, be fixed with the outer lug nut bore on the side of the described screwed pipe body other end.
The screw pile basis that the present invention program provides, changed the structure form of conventional piles basis section by the spiral vane on the body, adjusted the distribution of forces between soil and the pile foundation, the soil body stress of pile foundation side is shared when, and the stress diffusance improves, pile foundation end load reduces, make the pile foundation body stressed harmonious with earth stress, changed interactional pattern between the stake and the soil body, stake has constituted the mechanical type interlock with the pedosphere face, its more firm characteristics are achieved, the piling process king-pile side soil body is squeezed, compacted effect, the piling back stake side soil body forms nut, spiral vane and the tight interlock of pile foundation side, adjusted the distribution of forces between soil and the stake, stake side soil body stress is shared stress diffusance raising when, and a stake end load reduces, make pile body stressed harmonious, further strengthen the firm performance of pile foundation with earth stress, unsinkability energy and anti-pulling performance.
Description of drawings
Accompanying drawing described herein is used to provide further understanding of the present invention, constitutes the application's a part, does not constitute to improper qualification of the present invention, in the accompanying drawings:
Fig. 1 is the utility model example structure schematic diagram;
Fig. 2 is the utility model embodiment vertical view.
The specific embodiment
Describe the present invention in detail below in conjunction with accompanying drawing and specific embodiment, be used for explaining the utility model in this illustrative examples of the present utility model and explanation, but not as to qualification of the present utility model.
Embodiment 1
As depicted in figs. 1 and 2, one bottom surface diameter is the steel cylindrical tube 1 of 50mm, the body bottom of this steel pipe 1 is conical, the part on close top on steel pipe 1 body, be welded with three nuts 2, three nuts 2 evenly distribute on the circumference of steel pipe 1 section, and the body section circular arc radian between the described adjacent nut 2 is 120 degree; Below nut 2, also be provided with spiral vane 3 one, this spiral vane 3 is the lip-deep projection of steel pipe 1 body, this projection is around body shape setting in the shape of a spiral from top to bottom.
Embodiment 2
Embodiment 2 can see figures.1.and.2 equally, one bottom surface diameter is the steel cylindrical tube 1 of 1000mm, the body bottom of this steel pipe 1 is conical, the part on close top on steel pipe 1 body, be welded with three nuts 2, three nuts 2 evenly distribute on the circumference of steel pipe 1 section, and the body section circular arc radian between the described adjacent nut 2 is 120 degree; Below nut 2, also be provided with spiral vane 3 one, this spiral vane 3 is the lip-deep projection of steel pipe 1 body, this projection is around body shape setting in the shape of a spiral from top to bottom.
Embodiment 3
One bottom surface diameter is the steel cylindrical tube of 1500mm, the body bottom of this steel pipe is conical, near the part on top, is welded with four nuts on the steel pipe body, four nuts evenly distribute on the circumference of steel pipe section, and the body section circular arc radian between the described adjacent nut is 90 degree; Below nut, also be provided with spiral vane one, this spiral vane is the lip-deep projection of steel pipe body, this projection is around body shape setting in the shape of a spiral from top to bottom.
Adopt the screw pile basis of the foregoing description scheme, because of having adopted the structure form of variable cross-section, satisfy distribution Regularity of Additional Stress and stress and shared the requirement of stiffness variation when, adjusted the distribution of forces between soil and the pile foundation, the soil body stress of pile foundation side is shared when, and the stress diffusance improves, pile foundation end load reduces, make the pile foundation body stressed harmonious with earth stress, changed interactional pattern between the stake and the soil body, stake has constituted the mechanical type interlock with the pedosphere face, its more firm characteristics are achieved, the piling process king-pile side soil body is squeezed, compacted effect, the piling back stake side soil body forms nut, and pile body screw thread (spiral vane) and the tight interlock of stake side soil nut have been adjusted the distribution of forces between soil and the stake, stake side soil body stress is shared when, and the stress diffusance improves, stake end load reduces, and makes pile body stressed harmonious with earth stress, further strengthens the firm performance of pile foundation, unsinkability energy and anti-pulling performance.
More than the technical scheme that the embodiment of the invention provided is described in detail, used specific case herein the principle and the embodiment of the embodiment of the invention are set forth, the explanation of above embodiment only is applicable to the principle that helps to understand the embodiment of the invention; Simultaneously, for one of ordinary skill in the art, according to the embodiment of the invention, the part that on the specific embodiment and range of application, all can change,
In sum, this description should not be construed as limitation of the present invention.

Claims (3)

1. one kind 3 continous way screw pile bases is characterized in that:
Comprise body, described body integral body is column, and an end of described body is tapered, and is fixed with the outer lug nut on the side of the described body other end;
The Outboard Sections of body is provided with continuous helical shape blade one.
2. 3 continous way screw pile bases as claimed in claim 1 is characterized in that:
The described pipe shaft outside also is provided with anticorrosive coat.
3. 3 continous way screw pile bases as claimed in claim 1 is characterized in that:
One end of described body is multiple tooth shape, cross, in-line, the degree of lip-rounding of cutting sth. askew or truncation degree of lip-rounding drill bit formula metal construction.
CN2010205534483U 2010-09-30 2010-09-30 Three-point continuous screw pile foundation Expired - Lifetime CN201891115U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205534483U CN201891115U (en) 2010-09-30 2010-09-30 Three-point continuous screw pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205534483U CN201891115U (en) 2010-09-30 2010-09-30 Three-point continuous screw pile foundation

Publications (1)

Publication Number Publication Date
CN201891115U true CN201891115U (en) 2011-07-06

Family

ID=44220593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205534483U Expired - Lifetime CN201891115U (en) 2010-09-30 2010-09-30 Three-point continuous screw pile foundation

Country Status (1)

Country Link
CN (1) CN201891115U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493442A (en) * 2011-12-16 2012-06-13 浙江博雷重型机床制造有限公司 Spiral ground pile
CN112459050A (en) * 2020-11-12 2021-03-09 中交一公局集团有限公司 Hard cutting pile-forming construction method for secant pile in high-water-level complex geological area

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493442A (en) * 2011-12-16 2012-06-13 浙江博雷重型机床制造有限公司 Spiral ground pile
CN112459050A (en) * 2020-11-12 2021-03-09 中交一公局集团有限公司 Hard cutting pile-forming construction method for secant pile in high-water-level complex geological area

Similar Documents

Publication Publication Date Title
CN203821412U (en) Supporting structure with scattered row piles and continuous walls
CN201850557U (en) Discontinuous flange type screw pile foundation
CN201850556U (en) Three-point discontinuous screw pile foundation
CN201891115U (en) Three-point continuous screw pile foundation
CN217758723U (en) Steel structure spiral body and spiral ground pile
CN203741819U (en) Self-alarmingpost-grouting composite reinforced concrete hollow square pile
CN202369993U (en) Oppositely pulled type filling pile base pit supporting structure
CN203639905U (en) Spinning pile, spinning pile waist and spinning pile head
CN202644525U (en) Variable cross-section prestress reinforced concrete tubular pile
CN103046574B (en) A kind of soft damage blower fan four leaf plum type concrete bearing platform prestressed pipe foundation structure
CN202148523U (en) Jet grouting soil-cement-pile strengthened pile
CN205576899U (en) Stake of variable cross section screw rod
CN203639900U (en) Hollow pile
CN101122129A (en) Indented surface water discharging pile with sand lining
CN203741821U (en) Self-alarmingpost-grouting composite reinforced concretesquare pile
CN210562020U (en) Composite foundation adds muscle anchor rockfill retaining wall structure
CN102409665A (en) Quincuncial pipe pile and processing method thereof
CN201321612Y (en) Prestressing pipe pile for buildings
CN203129163U (en) Reinforcing framework structure for dam foundation
CN102155015A (en) Barbed implanted steel pipe anchor rod
CN202214722U (en) Square cylindrical wave node pipe pile
CN202124857U (en) Splitting pile
CN206204985U (en) A kind of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation
CN104770245A (en) Spliced structure for typhoon-resistant greenhouse base
CN221167781U (en) Photovoltaic spiral compaction pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nuosiman Energy Science & Technology (Beijing) Co., Ltd.

Assignor: Li Yang

Contract record no.: 2012990000850

Denomination of utility model: Three-point continuous screw pile foundation

Granted publication date: 20110706

License type: Exclusive License

Record date: 20121128

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150923

Address after: 100000. NET6 layer, No. 1, Red Army South Road, Beijing, Chaoyang District

Patentee after: Nuosiman Energy Science & Technology (Beijing) Co., Ltd.

Address before: Room 1, unit 1, Xiangyang Street military zone building, Aimin District, Aimin District, Heilongjiang, Mudanjiang Province, China 201

Patentee before: Li Yang

DD01 Delivery of document by public notice

Addressee: Nuosiman Energy Science & Technology (Beijing) Co., Ltd.

Document name: Notification of Passing Examination on Formalities

CX01 Expiry of patent term

Granted publication date: 20110706

CX01 Expiry of patent term
DD01 Delivery of document by public notice

Addressee: Duan Guanghang

Document name: Notice of expiration of patent right

DD01 Delivery of document by public notice