CN201851779U - Transition pipe for correcting deviation of steel top pipe - Google Patents

Transition pipe for correcting deviation of steel top pipe Download PDF

Info

Publication number
CN201851779U
CN201851779U CN2010205550857U CN201020555085U CN201851779U CN 201851779 U CN201851779 U CN 201851779U CN 2010205550857 U CN2010205550857 U CN 2010205550857U CN 201020555085 U CN201020555085 U CN 201020555085U CN 201851779 U CN201851779 U CN 201851779U
Authority
CN
China
Prior art keywords
pipe
steel
transition
transition tube
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205550857U
Other languages
Chinese (zh)
Inventor
孙焕斌
刘雪平
杨国新
张海涛
胡斌
刘兴斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN2010205550857U priority Critical patent/CN201851779U/en
Application granted granted Critical
Publication of CN201851779U publication Critical patent/CN201851779U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model discloses a steel ejector pipe is rectified and is used transition pipe has concatenated a plurality of transition pipes between instrument pipe and steel ejector pipe, through adjusting bolt hookup between the adjacent transition pipe, and the tip of one of them transition pipe is equipped with sunken step, and the tip of another transition pipe stretches out the ka tai that has with step looks block. The utility model discloses can in time return the design axis, enable rectifying of steel pipe push pipe construction and reach good effect, guarantee the accuracy of steel pipe roof-pipe line, reduce the risk of steel push pipe engineering widely.

Description

Steel push pipe correction transition tube
Technical field
The utility model relates to steel pipe pipe jacking construction technique field, specifically belongs to steel push pipe correction transition tube.
Background technique
In the steel pipe jacking construction, when jacking deviation in driction design axis, need revise the jacking direction by the tool pipe correction, thereby the pipeline of tool pipe back can be in jack-in process the crooked purpose that reaches correction.As a whole owing to being welded into by the steel pipe of jacking, be difficult for being bent, but by steel tube place's tractive of back, the correction operating effect is very poor after the tool pipe correction, so steel push pipe correction operation easier is very big, usually can cause accident resulting from poor quality of projects because of direction out of control.
The model utility content
The purpose of this utility model provides a kind of steel push pipe correction transition tube, by the mobilizable transition tube coupling of number joint is set between tool pipe and steel pipe, after making the tool pipe correction, timely Fertilizer Test of Regression Design axis, can make the correction of steel pipe jacking construction reach good result, guarantee the accurate of steel pipeline jacking axis, reduced the risk of steel pipe-jacking project widely.
The technical solution of the utility model is as follows:
Steel push pipe correction transition tube, between tool pipe and steel push pipe, be serially connected with a plurality of transition tube, by regulating Bolt Connection, the end of one of them transition tube is provided with the step of depression between the adjacent transition tube, and the end of another transition tube is extended with the Ka Tai that fastens with step.
Be equipped with rubber seal between described Ka Tai and the step.
In the jack-in process of the present utility model, bolt unclamps certain interval, allows can swing relatively within the specific limits between tube coupling.The gap of bolt is regulated as required at any time, and both having allowed can be movable between tube coupling, guarantees that again tube coupling can not throw off suddenly.
The utility model is by being provided with the mobilizable transition tube coupling of number joint between tool pipe and steel pipe, after making the tool pipe correction, timely Fertilizer Test of Regression Design axis, can make the correction of steel pipe jacking construction reach good result, guarantee the accurate of steel pipeline jacking axis, reduced the risk of steel pipe-jacking project widely.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is a connection diagram between the transition tube of the present utility model.
Embodiment
Referring to accompanying drawing, steel push pipe correction transition tube, between tool pipe 1 and steel push pipe 2, be serially connected with three transition tube 3, connect by regulating bolt 4 between the adjacent transition tube, regulating bolt thread is connected in the position limit socket 5 on the transition tube inwall, the end of one of them transition tube is provided with the step 6 of depression, and the end of another transition tube is extended with the card platform 7 that fastens with step, is equipped with rubber seal 8 between Ka Tai and the step.

Claims (2)

1. the steel push pipe is rectified a deviation and is used transition tube, between tool pipe and steel push pipe, be serially connected with a plurality of transition tube, it is characterized in that: pass through to regulate Bolt Connection between the adjacent transition tube, the end of one of them transition tube is provided with the step of depression, and the end of another transition tube is extended with the Ka Tai that fastens with step.
2. transition tube is used in described steel push pipe correction according to claim 1, it is characterized in that: be equipped with rubber seal between described Ka Tai and the step.
CN2010205550857U 2010-09-30 2010-09-30 Transition pipe for correcting deviation of steel top pipe Expired - Fee Related CN201851779U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205550857U CN201851779U (en) 2010-09-30 2010-09-30 Transition pipe for correcting deviation of steel top pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205550857U CN201851779U (en) 2010-09-30 2010-09-30 Transition pipe for correcting deviation of steel top pipe

Publications (1)

Publication Number Publication Date
CN201851779U true CN201851779U (en) 2011-06-01

Family

ID=44094170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205550857U Expired - Fee Related CN201851779U (en) 2010-09-30 2010-09-30 Transition pipe for correcting deviation of steel top pipe

Country Status (1)

Country Link
CN (1) CN201851779U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102889428A (en) * 2012-10-18 2013-01-23 北京隆科兴非开挖工程有限公司 Non-excavation correction method and apparatus of pipeline center line deviation after pipe-jacking construction
CN103994277A (en) * 2014-06-06 2014-08-20 中国科学院武汉岩土力学研究所 Round jacking pipe correction adjusting pipe
CN107060805A (en) * 2017-03-23 2017-08-18 中交三航局第三工程有限公司 A kind of deviation correcting device of advanced levels pipe curtain jacking construction
CN113028141A (en) * 2021-05-06 2021-06-25 上海公路桥梁(集团)有限公司 Pipe jacking machine head torsion deviation rectifying device and deviation rectifying method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102889428A (en) * 2012-10-18 2013-01-23 北京隆科兴非开挖工程有限公司 Non-excavation correction method and apparatus of pipeline center line deviation after pipe-jacking construction
CN102889428B (en) * 2012-10-18 2015-07-22 北京隆科兴非开挖工程股份有限公司 Non-excavation correction method and apparatus of pipeline center line deviation after pipe-jacking construction
CN103994277A (en) * 2014-06-06 2014-08-20 中国科学院武汉岩土力学研究所 Round jacking pipe correction adjusting pipe
CN107060805A (en) * 2017-03-23 2017-08-18 中交三航局第三工程有限公司 A kind of deviation correcting device of advanced levels pipe curtain jacking construction
CN113028141A (en) * 2021-05-06 2021-06-25 上海公路桥梁(集团)有限公司 Pipe jacking machine head torsion deviation rectifying device and deviation rectifying method thereof
CN113028141B (en) * 2021-05-06 2023-01-20 上海公路桥梁(集团)有限公司 Pipe jacking machine head torsion deviation rectifying device and deviation rectifying method thereof

Similar Documents

Publication Publication Date Title
CN201851779U (en) Transition pipe for correcting deviation of steel top pipe
CN204062233U (en) The cold connection set of a kind of pipeline
CN203679691U (en) Automatic assembling tool for crank case pipeline quick coupling
CN206105746U (en) Thread bush mounting tool
CN204153384U (en) A kind of novel branch pipe
CN207514458U (en) Industry and civil pipeline knot that can be undone by a pull
CN203836461U (en) Stainless steel liner cross pipe fitting
CN206027957U (en) Sandspit is sunk to bore adjustable swirler
CN205382700U (en) Embedded nut formula is wall spare even
CN204251981U (en) CRTS III type track plates is the pre-articulated connector of stretch-draw in producing
CN214185041U (en) Combined pier nose machine
CN203612064U (en) Split main tubular beam structure
CN204784767U (en) A clamp butterfly valve for on field irrigation conduit
CN205155400U (en) A lap joint flange device for threaded connection form voltage regulator both ends
CN203610112U (en) Control and regulating system for coupling reactions
CN106369042A (en) Convenient-to-splice double-tube cantilever
CN202639087U (en) Elbow die being 180 degrees
CN203272823U (en) Bitumen spraying control valve
CN203526416U (en) Steel wire multiple connection device of elasticizer
CN202659640U (en) Limiting rod
CN201881081U (en) Inner welding automatic pneumatic conveying assistor for welding flux
CN204493947U (en) A kind of metal bellows of socket connection
CN203099139U (en) Bridge type filter pipe with expansion connection port
CN201055879Y (en) Conduit coupling section shaping fixture
CN204843291U (en) Disconnect -type electrode stem

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110601

Termination date: 20150930

EXPY Termination of patent right or utility model