CN201845222U - Clothes production line speed control system - Google Patents

Clothes production line speed control system Download PDF

Info

Publication number
CN201845222U
CN201845222U CN2010205534680U CN201020553468U CN201845222U CN 201845222 U CN201845222 U CN 201845222U CN 2010205534680 U CN2010205534680 U CN 2010205534680U CN 201020553468 U CN201020553468 U CN 201020553468U CN 201845222 U CN201845222 U CN 201845222U
Authority
CN
China
Prior art keywords
module
main control
control computer
intelligent node
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205534680U
Other languages
Chinese (zh)
Inventor
孙小权
邹丽英
罗建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Technology ZJUT
Original Assignee
Zhejiang University of Technology ZJUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Technology ZJUT filed Critical Zhejiang University of Technology ZJUT
Priority to CN2010205534680U priority Critical patent/CN201845222U/en
Application granted granted Critical
Publication of CN201845222U publication Critical patent/CN201845222U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Monitoring And Testing Of Exchanges (AREA)

Abstract

A clothes production line speed control system comprises an upper computer, a main controller and intelligent nodes. The main controller is connected with the upper computer and the intelligent nodes in communication mode and sends production speed signals including speed time and intelligent node numbers to the intelligent nodes. The intelligent nodes send station operation completion singles to the main controller if complete station operation within the time of production speed, and send overtime alarm signals to the main controller if do not complete station operation within the time of production speed. The main controller sends received production information on each station to the upper computer, and the upper computer receives and analyses the production information of each station and then resets speed information of the main controller. The clothes production line speed control system has the advantages of synchronizing operations of various processes, increasing working efficiency and being capable of realizing fault alarm and talkback and guiding operation of operators.

Description

Clothing product line rhythm control system
Technical field
The utility model relates to a kind of clothing product line rhythm control system.
Background technology
At present, in the production of garment enterprise, it is a kind of mode of production of pipeline-type, the workman of each station produces according to operation separately, finish the appointed part processing on the clothes, having only has clear and definite understanding to each workman of each operation the actual time of finishing, and could formulate rational rhythm of production, enhances productivity.And more still formulate the production schedule by rule of thumb in the garment enterprise at present, to the uncontrollable guidance of every workman's rhythm of production.
Summary of the invention
In order to collect each workman's operation working time on the clothing product line, instruct workman's work rhythm, to enhance productivity, the utility model provides a kind of clothing product line rhythm control system.
The technical solution of the utility model:
Clothing product line rhythm control system is characterized in that: comprise host computer, main control computer and intelligent node, described main control computer and host computer communicate to connect, and described main control computer and intelligent node communicate to connect;
Described main control computer sends the rhythm of production signal to intelligent node, described tempo signal comprises cadence time, intelligent node numbering, described intelligent node is if finish station work in cadence time, be sent completely the station working signal and give main control computer, described intelligent node sends overtime alerting signal to main control computer if do not finish station work in cadence time; The production information signal of each station that described main control computer will receive sends to host computer; Reset the tempo signal of described main control computer after the production information signal analysis and processing of each station that described host computer will receive; Input need be numbered with the intelligent node of station manipulation person's intercommunication in the described main control computer, and the transmission intercommunication is instructed to this intelligent node;
Described intelligent node sends and repairs request signal to main control computer when this station device fails, and described main control computer then sends the intercommunication signal to corresponding intelligent node.
Further, be connected with a plurality of intelligent nodes on the described main control computer.
Further, described main control computer comprises first microprocessor, be connected with the first speech talkback module, first communication module, clock module, first display module, first Keysheet module, memory module on the described first microprocessor, described clock module provides temporal information for system and is presented on first display module, described first communication module is connected communication with host computer and intelligent node, and the described first speech talkback module is connected intercommunication with intelligent node;
Further, described intelligent node comprises second microprocessor, be connected with the second speech talkback module, second communication module, second display module, second Keysheet module on described second microprocessor, the described second speech talkback module is connected with the first speech talkback module, described second communication module is connected with first communication module, described second display module receives overtime alerting signal and the demonstration that second microprocessor produces, described second Keysheet module is a button, and described button comprises the operation conclusion button and reports button for repairment.
Further, be connected by first communication bus between the first communication module of described main control computer and the second communication module of intelligent node, described first communication bus is 485 buses or fieldbus.
Further, the first communication module of described main control computer is connected by the second communication bus with host computer, and described second communication bus is 485 buses or Ethernet.
Further, the described second speech talkback module is connected by tone frequency channel wire with the first speech talkback module.
System works on power, main control computer is set the work rhythm time, sends working prelude signal to each intelligent node, after the work hours arrive, main control computer sends tempo signal to intelligent node, and intelligent node determines whether report to the police (sound and light alarm) according to tempo signal and push button signalling.Such as: about 30 people of group, everyone has a button and alarm lamp, in cadence time (by the main control computer setting, such as 3 minutes) touch the button, cadence time then, lamp does not work; If in cadence time, do not touch the button, then cadence time then, alarm lamp is bright.
Described clock module provides temporal information for system and is presented on first display module, by first Keysheet module input relevant data, as cadence time, intelligent node numbering etc., when needs during with station manipulation person's intercommunication, input intelligent node numbering, system sends the intercommunication instruction to this intelligent node, and the speech talkback module of connecting intelligent node and main control computer realizes intercommunication.
When the operator of each station finishes a process operations, press the operation conclusion button, send the operation end signal to main control computer; When this station equipment has fault, press and report button for repairment, send the repairing request signal to main control computer, when receiving the intercommunication signal that main control computer sends, connect the speech talkback module, realize and the main control computer intercommunication when receiving the tempo signal that main control computer sends, whether whether send the operation timeout signal by crossing the decision of operation conclusion button according to this machine.
The beneficial effects of the utility model: the actual activity time that can gather each station manipulation person, handle by analysis, for follow-up operation balance provides basic data, can send predetermined process rhythm signal to each station, the operation of each operation synchronously, increase work efficiency, can also realize fault alarm and intercommunication, guiding operation employee does.
Description of drawings
Fig. 1 is a systematic schematic diagram of the present utility model.
Fig. 2 is a main control computer schematic block circuit diagram of the present utility model.
Fig. 3 is the theory diagram of intelligent node of the present utility model.
Embodiment
With reference to Fig. 1-3, clothing product line rhythm control system comprises host computer 2, main control computer 1 and intelligent node 3, and described main control computer 1 communicates to connect with host computer 2, and described main control computer 1 communicates to connect with intelligent node 3;
Described main control computer 1 sends the rhythm of production signal to intelligent node 3, described tempo signal comprises cadence time, intelligent node numbering, described intelligent node 3 is if finish station work in cadence time, be sent completely the station working signal and give main control computer 1, described intelligent node 3 sends overtime alerting signal to main control computer 1 if do not finish station work in cadence time; The production information signal of each station that described main control computer 1 will receive sends to host computer 2; Reset the tempo signal of described main control computer 1 after the production information signal analysis and processing of each station that described host computer 2 will receive; When described main control computer 1 need be with station manipulation person's intercommunication, import corresponding intelligent node numbering, and send intercommunication and instruct to this intelligent node 3;
Described intelligent node 3 sends and repairs request signal to main control computer 1 when this station device fails, and 1 of described main control computer sends the intercommunication signal to corresponding intelligent node 3.
Be connected with a plurality of intelligent nodes 3 on the described main control computer 1.
Described main control computer 1 comprises first microprocessor 10, be connected with the first speech talkback module 7, first communication module 8, clock module 9, first display module 11, first Keysheet module 12, memory module 13 on the described first microprocessor 10, described clock module provides temporal information for 9 systems and is presented on first display module 11, described first communication module 8 is connected communication with host computer 2 and intelligent node 3, and the described first speech talkback module 7 is connected conversation with intelligent node 3;
Described intelligent node 3 comprises second microprocessor 16, be connected with the second speech talkback module 14, second communication module 15, second display module 17, second Keysheet module 18 on described second microprocessor 16, the described second speech talkback module 14 is connected with the first speech talkback module 7, described second communication module 15 is connected with first communication module 8, described second display module 17 receives overtime alerting signal and the demonstration that second microprocessor 16 produces, described second Keysheet module 28 is buttons, and described button comprises the operation conclusion button and reports button for repairment.
Be connected by first communication bus 4 between the first communication module 8 of described main control computer 1 and the second communication module 15 of intelligent node 3, described first communication bus 4 is 485 buses or fieldbus.
The first communication module 8 of described main control computer 1 is connected by second communication bus 6 with host computer 2, and described second communication bus 6 is 485 buses or Ethernet.
The described second speech talkback module 14 is connected by tone frequency channel wire 5 with the first speech talkback module 7.
System works on power, main control computer 1 is set the work rhythm time, sends working prelude signal to each intelligent node 3, after the work hours arrive, main control computer 1 sends tempo signal to intelligent node 3, and intelligent node 3 determines whether report to the police (sound and light alarm) according to tempo signal and push button signalling.Such as: about 30 people of group, everyone has a button and alarm lamp, in cadence time (by the main control computer setting, such as 3 minutes) touch the button, cadence time then, lamp does not work; If in cadence time, do not touch the button, then cadence time then, alarm lamp is bright.
Described clock module 9 provides temporal information for system and is presented on first display module 11, by first Keysheet module, 12 input relevant datas, as cadence time, intelligent node numbering etc., when needs during with station manipulation person's intercommunication, input intelligent node 3 numberings, system sends the intercommunication instruction to this intelligent node 3, and the speech talkback module of connecting intelligent node 3 and main control computer 1 realizes intercommunication.
When the operator of each station finishes a process operations, press the operation conclusion button, send the operation end signal to main control computer 1; When this station equipment has fault, press and report button for repairment, send the repairing request signal to main control computer 1, when receiving the intercommunication signal that main control computer 1 sends, connect the speech talkback module, realize and main control computer 1 intercommunication when receiving the tempo signal that main control computer 1 sends, whether whether send the operation timeout signal by crossing the decision of operation conclusion button according to this machine.
The described content of this instructions embodiment only is enumerating the way of realization of utility model design; protection domain of the present utility model should not be regarded as only limiting to the concrete form that embodiment states, protection domain of the present utility model also reach in those skilled in the art according to the utility model design the equivalent technologies means that can expect.

Claims (7)

1. clothing product line rhythm control system, it is characterized in that: comprise host computer, main control computer and intelligent node, described main control computer and host computer communicate to connect, and described main control computer and intelligent node communicate to connect;
Described main control computer sends the rhythm of production signal to intelligent node, described tempo signal comprises cadence time, intelligent node numbering, described intelligent node is if finish station work in cadence time, be sent completely the station working signal and give main control computer, described intelligent node sends overtime alerting signal to main control computer if do not finish station work in cadence time; The production information signal of each station that described main control computer will receive sends to host computer; Reset the tempo signal of described main control computer after the production information signal analysis and processing of each station that described host computer will receive; The corresponding intelligent node of input numbering in the described main control computer, and send intercommunication instruct to need with the intelligent node of station manipulation person's intercommunication;
Described intelligent node sends and repairs request signal to main control computer when this station device fails, and described main control computer then sends the intercommunication signal to corresponding intelligent node.
2. clothing product line rhythm control system according to claim 1 is characterized in that: be connected with a plurality of intelligent nodes on the described main control computer.
3. clothing product line rhythm control system according to claim 1 and 2, it is characterized in that: described main control computer comprises first microprocessor, be connected with the first speech talkback module, first communication module, clock module, first display module, first Keysheet module, memory module on the described first microprocessor, described clock module provides temporal information for system and is presented on first display module, described first communication module is connected communication with host computer and intelligent node, and the described first speech talkback module is connected conversation with intelligent node.
4. clothing product line rhythm control system according to claim 3, it is characterized in that: described intelligent node comprises second microprocessor, be connected with the second speech talkback module on described second microprocessor, second communication module, second display module, second Keysheet module, the described second speech talkback module is connected with the first speech talkback module, described second communication module is connected with first communication module, described second display module receives overtime alerting signal and the demonstration that second microprocessor produces, described second Keysheet module is a button, and described button comprises the operation conclusion button and reports button for repairment.
5. clothing product line rhythm control system according to claim 4, it is characterized in that: be connected by first communication bus between the first communication module of described main control computer and the second communication module of intelligent node, described first communication bus is 485 buses or fieldbus.
6. clothing product line rhythm control system according to claim 5 is characterized in that: the first communication module of described main control computer is connected by the second communication bus with host computer, and described second communication bus is 485 buses or Ethernet.
7. clothing product line rhythm control system according to claim 6 is characterized in that: the described second speech talkback module is connected by tone frequency channel wire with the first speech talkback module.
CN2010205534680U 2010-10-09 2010-10-09 Clothes production line speed control system Expired - Lifetime CN201845222U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205534680U CN201845222U (en) 2010-10-09 2010-10-09 Clothes production line speed control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205534680U CN201845222U (en) 2010-10-09 2010-10-09 Clothes production line speed control system

Publications (1)

Publication Number Publication Date
CN201845222U true CN201845222U (en) 2011-05-25

Family

ID=44040109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205534680U Expired - Lifetime CN201845222U (en) 2010-10-09 2010-10-09 Clothes production line speed control system

Country Status (1)

Country Link
CN (1) CN201845222U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101957615A (en) * 2010-10-09 2011-01-26 浙江工业大学 Rhythm control system of clothing production line
CN106774187A (en) * 2015-11-24 2017-05-31 联合汽车电子有限公司 The system and method for automatic monitoring production line beat

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101957615A (en) * 2010-10-09 2011-01-26 浙江工业大学 Rhythm control system of clothing production line
CN101957615B (en) * 2010-10-09 2012-11-21 浙江工业大学 Rhythm control system of clothing production line
CN106774187A (en) * 2015-11-24 2017-05-31 联合汽车电子有限公司 The system and method for automatic monitoring production line beat
CN106774187B (en) * 2015-11-24 2019-09-17 联合汽车电子有限公司 The system and method for automatic monitoring production line beat

Similar Documents

Publication Publication Date Title
CN101957615B (en) Rhythm control system of clothing production line
CN104816299B (en) A kind of multiple stage robot and the control system of punch press linkage
CN107329415B (en) Production data acquisition and analysis balance control equipment and control method thereof
CN106205091A (en) The remote control thereof of a kind of unmanned plane and remote control unit
CN105005280A (en) Industrial device man-machine interactive system based on wireless intelligent terminal and control method
CN201845222U (en) Clothes production line speed control system
CN104125094A (en) System and method for processing communication network faults of State Grid Corporation of China
CN104007735A (en) Operating system capable of setting batch parameters of sewing machines
CN110456750A (en) Information collecting device, forging mold production information acquisition system and its working method
CN102945535A (en) Equipment state intelligent identification method of power dispatching master station type integrated intelligent anti-misoperation system
CN116187630A (en) Dynamic debugging system based on reconfigurable production line
CN102005126B (en) Multi-intersection traffic signal control machine
CN202435360U (en) Automatic identification modularized equipment
CN115571790A (en) Tower crane binding control method and device, handheld terminal and tower crane controller
CN110794798B (en) Production data monitoring system and monitoring method applied to display panel
CN202466183U (en) Voice alarm system for lace dyeing machine
CN106341484B (en) Equipment management system and method
CN102749866B (en) Automatic control method of production rhythm
CN210324256U (en) Product piece counting system based on bar code identification
CN204595522U (en) The membrane keyboard system of opertaing device
CN203224754U (en) Multisystem synchronization numerical control simulation apparatus for processing training
CN207802008U (en) A kind of industrial cloud monitoring system based on Android
CN202197272U (en) Indicating lamp panel device
CN207264123U (en) A kind of production data acquisition analysis balance control device
CN211015130U (en) Human-computer interaction device for numerical control equipment and numerical control equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110525

Effective date of abandoning: 20130710

AV01 Patent right actively abandoned

Granted publication date: 20110525

Effective date of abandoning: 20130710

RGAV Abandon patent right to avoid regrant