CN201843352U - Sliding framework platform for large-column gird large-area net frame structure - Google Patents

Sliding framework platform for large-column gird large-area net frame structure Download PDF

Info

Publication number
CN201843352U
CN201843352U CN2010205822847U CN201020582284U CN201843352U CN 201843352 U CN201843352 U CN 201843352U CN 2010205822847 U CN2010205822847 U CN 2010205822847U CN 201020582284 U CN201020582284 U CN 201020582284U CN 201843352 U CN201843352 U CN 201843352U
Authority
CN
China
Prior art keywords
balladeur train
frame
train platform
towers
pulleys
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205822847U
Other languages
Chinese (zh)
Inventor
杨发兵
孟铁兵
王天东
韩友强
李军
李雪辉
吴鹏翔
李明科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN2010205822847U priority Critical patent/CN201843352U/en
Application granted granted Critical
Publication of CN201843352U publication Critical patent/CN201843352U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a sliding framework platform for a large-column gird large-area net frame structure. The sliding framework platform comprises towers, a suspended span frame and an overhanging frame, wherein at least two columns of towers are included, two longitudinal towers are connected through transverse frames; the bottoms and the top parts of the transverse towers are connected with the suspended span frame, and the top parts of the outer sides of the transverse towers are connected with the overhanging frame; steel pipes at the bottom ends of the transverse towers are sleeved on pulleys, the axis of the steel pipes is coincided with that of the pulleys; and the pulleys are placed on guide rails, cross sleepers are laid below the guide rails, and the guide rails and the cross sleepers are fixed through spot welding. Pulleys are installed on the bottom surface of the sliding framework platform, and the sliding framework platform for construction can be realized through the moving of the pulleys. Compared with the traditional scaffold, the quantity of erected scaffolds and the disassembly and assembly are reduced, and at the same time, the problems of overlarge flexibility value and large displacement deflection of net frames planned to be erected caused by overlarge overall settling amount of construction brackets are avoided, therefore the sliding framework platform can be widely applied to the installation and construction of large-column gird large-area net frame structures.

Description

Huge pillar net large tracts of land space truss structure balladeur train platform
Technical field
The utility model relates to the operation platform that a kind of steel mesh frame is installed, particularly a kind of huge pillar net large tracts of land space truss structure balladeur train platform.
Background technology
Usually job practicess such as full hall frame high altitude bulk method, lift-on/lift-off system, whole lift method, rack sliding method are adopted in the rack construction, but for huge pillar net large tracts of land space truss structure, because the scaffold area that need set up is excessive, or the lifting appliance tonnage is excessive, tend to produce common quality defects such as excessive such as support bulk settling amount, that the rack deflection value is excessive, offset deviation is big, and the above several method is owing to the time of setting up of construction supporting facility is longer, often cause the duration longer, thereby cause construction costs higher.
The utility model content
The purpose of this utility model provides a kind of huge pillar net large tracts of land space truss structure balladeur train platform, solve the technical problem that causes the rack distortion in traditional rack construction easily; And the problem of large tracts of land rack is set up in solution in the short duration.
For achieving the above object, the utility model adopts following technical scheme:
A kind of huge pillar net large tracts of land space truss structure balladeur train platform comprises support body, and it is characterized in that: described support body is by pylon, the suspended span frame and the frame of encorbelmenting are formed, pylon is at least two row, connects by crossbearer between two vertical pylons, and the bottom all is connected with the suspended span frame with the top between two lateral towers, the pylon outside top connects the frame of encorbelmenting, the steel pipe socket of pylon bottom on pulley, its axis and pulley dead in line, described pulley is placed on the guide rail, be laid with sleeper under the described guide rail, both fix in spot welding.
Described balladeur train platform is at least one group, connects by connector between every group of balladeur train platform.
The bottom surface of described suspended span frame is equipped with bridging.
Be welded to connect between described guide rail and the continued access guide rail.
The bottom surface of the part of described crossbearer between two pulleys is connected with the adjustable seats that is used for fixing the balladeur train platform.
The height of described balladeur train platform is following 2.5 meters of the lower chord of intending setting up rack.
Compared with prior art the utlity model has following characteristics and beneficial effect: (1) quality is controlled easily.Rack is installed on the handling frame of similar full hall scaffold and operates, and handling frame intensity, rigidity, stability are all better, and each span rack forms a stable structure unit, and error is controlled easily; Generally take from the centre can to reduce accumulated error to the job practices of both sides slippage.(2) shorten the construction period and save construction cost.Only need set up the sliding platform of a unit truss, rack is installed one, and the slippage handling frame carries out the installation of next unit truss more forward, can provide a plurality of work planes to construct simultaneously.The save operation frame is set up the time, accelerates the rack set-up time.(3) effectively utilize the place.Placing of material is evacuated relatively, and material loading is convenient, has effectively utilized the construction plant.
(4) the employed pulley of sliding platform, sliding rail are reusable, can not cause harmful effect to environment.
The utility model has overcome traditional rack and has set up platform and tend to produce common quality defects such as support bulk settling amount is excessive, the rack deflection value is excessive, offset deviation is big, and because the time of setting up of construction supporting facility is longer, often cause the duration longer, thereby cause the higher shortcoming of construction costs, solved the technical problem of efficiently setting up the large tracts of land rack in the short period of time fast.
The utility model can be widely used in the erection construction of huge pillar apart from the large tracts of land rack.
Description of drawings
The utility model is described in more detail below in conjunction with accompanying drawing.
Fig. 1 is the utility model implementing procedure figure.
Fig. 2 is the sliding platform layout plan.
Fig. 3 is a sliding platform facade arrangement diagram.
Fig. 4 is a fixedly schematic diagram of guide rail.
Fig. 5 roller and pylon connection diagram.
Fig. 6 is the vertical elevation of sliding platform.
Fig. 7 is the horizontal elevation of sliding platform.
Fig. 8 is the vertical bottom surface of a sliding platform layout plan.
Fig. 9 is the vertical top surface plane arrangement diagram of sliding platform.
Figure 10 is a first module rack scheme of installation.
Figure 11 is that sliding platform moves to the second element mesh chord position and puts schematic diagram.
Figure 12 is the second unit rack scheme of installation.
Reference numeral: encorbelment frame, 2-guide rail, 3-sleeper, 4-pylon bottom steel pipe, 5-pulley, 6-pulley axis, 7-glide direction, 8-of 1-balladeur train platform, 1.1-pylon, 1.2-suspended span frame, 1.3-intends setting up rack, 8.1-first unit truss, 8.2-second unit truss, 9-bridging, 10-column, 11-guide rail basis, 12-crossbearer, 13-adjustable seats.
The specific embodiment
Embodiment is referring to Fig. 2~shown in Figure 9, a kind of huge pillar net large tracts of land space truss structure balladeur train platform, comprise support body, being used for will be between two row column 10, and it is in place by the Steel Space Truss structure slippage that steel pipe is formed, described support body is by pylon 1.1, the suspended span frame 1.2 and the frame 1.3 of encorbelmenting are formed, pylon 1.1 is at least two row, connects by crossbearer 12 between two vertical pylons, and the bottom all is connected with suspended span frame 1.2 with the top between two lateral towers, the pylon outside top connects the frame 1.3 of encorbelmenting, the steel pipe 4 of pylon bottom is enclosed within on the pulley 5, and its axis overlaps with pulley axis 6, and described pulley 5 is placed on the guide rail 2, described guide rail is laid with sleeper 32 times, and both fix in spot welding.
Described pylon is the upright Steel Cantilever trussed construction in space that steel pipe is formed, and the suspended span frame is the Steel Space Truss structure that steel pipe is formed, and between two lateral towers, the frame of encorbelmenting is the space horizontal boom steel truss structure that steel pipe is formed, and it is encorbelmented in the pylon outside.
Described balladeur train platform is at least one group, connects by connector between every group of balladeur train platform.
The bottom surface of described suspended span frame 1.2 is equipped with bridging 9.
Be welded to connect between described guide rail 2 and the continued access guide rail.
The bottom surface of the part of described crossbearer 12 between two pulleys is connected with the adjustable seats 13 that is used for fixing the balladeur train platform.
The height of described balladeur train platform is following 2.5 meters of the lower chord of intending setting up rack 8.
Adopt the balladeur train method job practices of described huge pillar net large tracts of land space truss structure balladeur train platform, referring to Fig. 1, Figure 10~Figure 12, step is as follows:
Step 1 adopts graded sand and stone to handle guide rail basis 11, guarantees that guide rail basis 11 is solid smooth, reaches bearing capacity and guide rail installation requirement;
Step 2, mounting guide rail 2; According to site operation layout unwrapping wire, vertical direction is laid sleeper 3 at interval in guide rail unwrapping wire position, and joining at sleeper 3 upper mounting rails 2, two is welded to connect between the guide rail, adjust the parallel and discrepancy in elevation between the guide rail simultaneously in the tolerance scope, at last guide rail 2 and sleeper 3 spot welding are fixed;
Step 3 is set up first group of balladeur train platform 1; Set up single pylon earlier, pulley 5 is placed on the guide rail 2, and steel pipe 4 is enclosed within on the pulley 5 bottom the pylon that will set up, its axis overlaps with pulley axis 6;
Step 4 links together one group of pylon that connects pulley with crossbearer 12, adjustable seats 13 is installed in the crossbearer bottom surface between two pulleys;
Step 5, suspended span frame 1.2 is set up in the bottom between two pylons, and in the horizontal direction of the bottom of suspended span frame 1.2 bridging 9 is installed;
Step 6 continues along highly setting up pylon, sets up to the position of setting up the lower chord 2.5m of rack 8 apart from plan;
Step 7, suspended span frame 1.2 is set up at the top between two groups of pylons, sets up the frame 1.3 of encorbelmenting in the pylon side;
Step 8, repeating step three be to step 7, sets up until whole sliding platforms to finish, and connects by connector between the two adjacent groups platform;
Step 9 is installed first module rack 8.1; Check earlier and intend setting up rack end bearing, and stationary adjustable bearing 13, then the rack component that usefulness is installed are risen on the operating desk of balladeur train platform, and disperse to place, begin to install until finishing first module rack 8.1 from the rack bearing;
Step 10, remove the connector between the adjacent balladeur train platform, and rise sliding platform bottom adjustable seats 13, respectively single group sliding platform is slid onto the position that plan is set up the second unit rack 8.2 of rack, connect the connector between the adjacent balladeur train platform, and stationary adjustable bearing 13, the nine described installation second unit racks 8.2 set by step;
Step 11, repeating step ten, whole unit rack of setting up rack 8 until plan installs.
The erection sequence of intending described in the step 8 and nine setting up unit truss is installed web member again for the lower chord grid is installed earlier, installs chord member at last.
Translational speed≤the 1m/min of the described balladeur train platform of step 9.

Claims (6)

1. huge pillar net large tracts of land space truss structure balladeur train platform, comprise support body, it is characterized in that: described support body is by pylon (1.1), suspended span frame (1.2) and the frame of encorbelmenting (1.3) are formed, pylon (1.1) is at least two row, connect by crossbearer (12) between two vertical pylons, the bottom all is connected with suspended span frame (1.2) with the top between two lateral towers, the pylon outside top connects the frame (1.3) of encorbelmenting, the steel pipe of pylon bottom (4) is enclosed within on the pulley (5), and its axis overlaps with pulley axis (6), and described pulley (5) is placed on the guide rail (2), be laid with sleeper (3) under the described guide rail (2), both fix in spot welding.
2. huge pillar net large tracts of land space truss structure balladeur train platform according to claim 1, it is characterized in that: described balladeur train platform is at least one group, connects by connector between every group of balladeur train platform.
3. huge pillar net large tracts of land space truss structure balladeur train platform according to claim 1, it is characterized in that: the bottom surface of described suspended span frame (1.2) is equipped with bridging (9).
4. huge pillar net large tracts of land space truss structure balladeur train platform according to claim 1 is characterized in that: be welded to connect between described guide rail (2) and the continued access guide rail.
5. huge pillar net large tracts of land space truss structure balladeur train platform according to claim 1, it is characterized in that: the bottom surface of the part of described crossbearer (12) between two pulleys is connected with the adjustable seats (13) that is used for fixing the balladeur train platform.
6. huge pillar net large tracts of land space truss structure balladeur train platform according to claim 1 is characterized in that: the height of described balladeur train platform is following 2.5 meters of the lower chord of intending setting up rack (8).
CN2010205822847U 2010-10-29 2010-10-29 Sliding framework platform for large-column gird large-area net frame structure Expired - Lifetime CN201843352U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205822847U CN201843352U (en) 2010-10-29 2010-10-29 Sliding framework platform for large-column gird large-area net frame structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205822847U CN201843352U (en) 2010-10-29 2010-10-29 Sliding framework platform for large-column gird large-area net frame structure

Publications (1)

Publication Number Publication Date
CN201843352U true CN201843352U (en) 2011-05-25

Family

ID=44038245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205822847U Expired - Lifetime CN201843352U (en) 2010-10-29 2010-10-29 Sliding framework platform for large-column gird large-area net frame structure

Country Status (1)

Country Link
CN (1) CN201843352U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974977A (en) * 2010-10-29 2011-02-16 中建二局第三建筑工程有限公司 Pulley bracket platform with large-column-grid and large-area grid structure and construction method thereof by utilizing pulley bracket method
CN103665636A (en) * 2013-11-27 2014-03-26 江阴匡时建材有限公司 PVC (polyvinyl chloride) plastic building template
CN104213706A (en) * 2014-09-04 2014-12-17 江苏沪宁钢机股份有限公司 Sliding scaffold platform for mounting wire frame and wire frame mounting method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974977A (en) * 2010-10-29 2011-02-16 中建二局第三建筑工程有限公司 Pulley bracket platform with large-column-grid and large-area grid structure and construction method thereof by utilizing pulley bracket method
CN101974977B (en) * 2010-10-29 2012-02-15 中建二局第三建筑工程有限公司 Pulley bracket platform with large-column-grid and large-area grid structure and construction method thereof by utilizing pulley bracket method
CN103665636A (en) * 2013-11-27 2014-03-26 江阴匡时建材有限公司 PVC (polyvinyl chloride) plastic building template
CN104213706A (en) * 2014-09-04 2014-12-17 江苏沪宁钢机股份有限公司 Sliding scaffold platform for mounting wire frame and wire frame mounting method

Similar Documents

Publication Publication Date Title
CN101974977B (en) Pulley bracket platform with large-column-grid and large-area grid structure and construction method thereof by utilizing pulley bracket method
CN105672673A (en) Quick locating device and method for prefabricated floor slabs
CN104594642A (en) Large-span net rack aloft pairing, installing and overall horizontal moving method
CN109573851B (en) Arc-shaped roof internode steel truss hanging and installing integrated device and butt-joint hanging method
CN201843352U (en) Sliding framework platform for large-column gird large-area net frame structure
CN105672638A (en) Scaffold with supporting and sliding functions and net rack mounting method
CN104831632A (en) Upper transverse beam and lower transverse beam construction method for bridge cable bent tower
CN208857700U (en) A kind of Bridge Erector full telescopic outrigger of four cylinder types
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN111648313A (en) Bailey beam dismantling and transporting device and construction method applying same
CN217148358U (en) Linear steel structure lifting device for telescopic narrow space
CN202899639U (en) Concrete column structure
CN215978530U (en) Steel beam sliding installation device
WO2022127096A1 (en) Fixing device for slabs, and transport device
CN203679121U (en) Steel reinforcement cage jig frame
CN103556835B (en) Floor slab trolley
CN107653782B (en) Continuous beam pier top section pouring internal mold supporting system
CN2440891Y (en) Lower railing mechanism for horizontal movement of construction
CN112900891A (en) High-altitude large-caliber pipeline sliding device and sliding method
CN110862019A (en) Installation method of device capable of simultaneously solving vertical and horizontal material transportation
CN111516137A (en) Hydraulic integral movable prefabricated box girder web plate reinforcing steel bar jig frame and construction method
CN219118850U (en) Integral lifting house structure of steel structure industrial factory building roof
CN104631336B (en) Mobile storage platform for storing steel truss girder pieces and construction method of mobile storage platform
CN203834660U (en) Supporting structure for portal frame
CN210480655U (en) Assembled daylighting top glass hoisting machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110525

Effective date of abandoning: 20120502