CN201843141U - Spiral ground pile driving coupling device - Google Patents

Spiral ground pile driving coupling device Download PDF

Info

Publication number
CN201843141U
CN201843141U CN2010205779207U CN201020577920U CN201843141U CN 201843141 U CN201843141 U CN 201843141U CN 2010205779207 U CN2010205779207 U CN 2010205779207U CN 201020577920 U CN201020577920 U CN 201020577920U CN 201843141 U CN201843141 U CN 201843141U
Authority
CN
China
Prior art keywords
pile
spiral pile
ground pile
driving shaft
spiral ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205779207U
Other languages
Chinese (zh)
Inventor
赵宏强
张爱民
高淑蓉
曾乐兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Sunward Intelligent Machinery Co Ltd
Original Assignee
Hunan Sunward Intelligent Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Sunward Intelligent Machinery Co Ltd filed Critical Hunan Sunward Intelligent Machinery Co Ltd
Priority to CN2010205779207U priority Critical patent/CN201843141U/en
Application granted granted Critical
Publication of CN201843141U publication Critical patent/CN201843141U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a spiral ground pile driving coupling device, which comprises a revolving seat, a power head, a short circuit connector, a driving shaft and a spiral ground pile, wherein the spiral ground pile is arranged below the driving shaft; a plurality of clamping slots are arranged below the driving shaft; and the fixed end of the spiral ground pile is provided with grabs which correspond to the clamping slots in positions and can be clamped in the clamping slot. The utility model has a simple structure, can greatly reduce the labor strength of constructors, greatly increases the placement speed of the spiral ground pile and improves the pile forming efficiency of a drilling machine.

Description

The spiral pile drives hookup
Technical field
The utility model relates to a kind of driving hookup, particularly relates to a kind of spiral pile and drives hookup.
Background technology
Popularizing and promoting along with what solar energy utilized, the solar power silicon tabula rasa amount of setting up is more and more big, the spiral pile is adopted in the support of silicon tabula rasa at present in a large number, and the spiral pile is also widely applied on fixed supports such as simple building basis, tent, hedge, road sign, guideboard, billboard, lamp box, flagpole, electric pole in addition.A large amount of employings of creeping into of compact spiral pile at present screw in manually and creep into, and medium-sized spiral pile adopts electric tools to screw in and creeps into, and the large-scale spiral pile adopts special machine to screw in and creeps into.In order to increase work efficiency and to reduce labour intensity, all spiral piles all can adopt the screw pile rig to creep into.The spiral pile and the supported objects overwhelming majority above it all are to adopt bolted on connection.General 3 bolted on connections, the general employing of medium-sized and large-scale spiral pile 6 or 6 the above bolted on connections of adopting of compact spiral pile.When employing screw pile rig is underground the rotary drilling of spiral pile, if device for revolving and driving and spiral pile adopt bolted on connection equally, before the construction spiral pile is installed on the device for revolving and driving of screw pile rig and will installs and tighten a plurality of bolts, after spiral pile rotary drilling underground construction finished, the spiral pile is taken apart also from the device for revolving and driving of screw pile rig will be unscrewed and pull down a plurality of bolts again.General employing screw pile rig spiral pile time spent of rotary drilling was less than 1 minute, need install to tighten and unscrew and pull down a plurality of bolts and install and pull down the spiral pile toward the screw pile rig, can take a long time, need a few minutes to tens minute, be to creep into several times to tens times of working time, subsidiary operation time is long, has influenced the operating efficiency of screw pile rig.Spend the long period to twist bolt, increased constructor's labour intensity.Screw bolt and nut is repeatedly tightened and is unscrewed, and wearing and tearing and stripped thread cause and scrap easily, increases cost.
The utility model content
The utility model overcomes the deficiencies in the prior art, provides a kind of simple in structure, can reduce constructor's labour intensity greatly, and significantly improves the spiral pile and lay speed, and the spiral pile that promotes the pile efficient of rig drives hookup.
The purpose of this utility model is achieved by following technical proposals:
A kind of spiral pile drives hookup, comprise revolving bed, unit head, short circuit head, driving shaft, spiral pile, described spiral pile is installed in described driving shaft below, the below of described driving shaft is provided with a plurality of draw-in grooves, the fixed end of described spiral pile be provided with the position corresponding with described draw-in groove, can be installed on the grab in the described draw-in groove.
In the utility model, described draw-in groove is " T " font.
In the utility model, the below of described driving shaft is provided with three draw-in grooves.
Owing to adopt said structure, the utlity model has following tangible advantage:
(1), do not need to twist a plurality of bolts during installation and removal spiral pile, save time, increase work efficiency, reduce labour intensity.
(2), replacing driving hookup is simple, convenient, fast.
(3), can reduce wearing and tearing, minimizing is scrapped, and saves cost.
(4), simple in structure, the reliability height.
(5), installation, easy to maintenance, safe.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the enlarged drawing at B place among Fig. 1.
In the accompanying drawing 1,2,1---unit head, 2---short circuit head, 3---driving shaft, 4---spiral pile, 5---grab, 6---draw-in groove, 7---revolving bed.
The specific embodiment
Below in conjunction with accompanying drawing, describe the specific embodiment that the spiral pile drives hookup in detail.
Shown in draw-in groove connecting mode among Fig. 1,2, be adapted to drive the compact spiral pile.Whole drive system is made up of unit head 1, short circuit head 2, card slot type driving shaft 3, spiral pile 4, nut 5, revolving bed 7.Card slot type of the present utility model connects by the 5 driving pile rotary drillings of the trip on the draw-in groove 6 direct cutting ferrule spiral piles on the driving shaft 3, it is simple in structure, can reduce constructor's labour intensity greatly, and significantly improve the spiral pile and lay speed, and then directly promote the pile efficient of rig, and described draw-in groove 6 has three, clamps more firm like this; Described draw-in groove is " T " font, is just changeing or is reversing and can be suitable for no matter driving shaft 3 drives spiral pile 4.

Claims (3)

1. a spiral pile drives hookup, comprise revolving bed (7), unit head (1), short circuit head (2), driving shaft (3), spiral pile (4), described spiral pile (4) is installed in described driving shaft (3) below, it is characterized in that: the below of described driving shaft (3) is provided with a plurality of draw-in grooves (6), the fixed end of described spiral pile (4) be provided with the position corresponding with described draw-in groove (6), can be installed on the grab (5) in the described draw-in groove (6).
2. spiral pile according to claim 1 drives hookup, it is characterized in that: described draw-in groove (6) is " T " font.
3. spiral pile according to claim 1 and 2 drives hookup, and it is characterized in that: the below of described driving shaft (3) is provided with three draw-in grooves (6).
CN2010205779207U 2010-10-26 2010-10-26 Spiral ground pile driving coupling device Expired - Fee Related CN201843141U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205779207U CN201843141U (en) 2010-10-26 2010-10-26 Spiral ground pile driving coupling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205779207U CN201843141U (en) 2010-10-26 2010-10-26 Spiral ground pile driving coupling device

Publications (1)

Publication Number Publication Date
CN201843141U true CN201843141U (en) 2011-05-25

Family

ID=44038035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205779207U Expired - Fee Related CN201843141U (en) 2010-10-26 2010-10-26 Spiral ground pile driving coupling device

Country Status (1)

Country Link
CN (1) CN201843141U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974906A (en) * 2010-10-26 2011-02-16 湖南山河智能机械股份有限公司 Spiral pile driving connecting device
CN102330429A (en) * 2011-06-23 2012-01-25 江苏晟楠电子科技有限公司 Fast pile inserting and extracting complete equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974906A (en) * 2010-10-26 2011-02-16 湖南山河智能机械股份有限公司 Spiral pile driving connecting device
CN102330429A (en) * 2011-06-23 2012-01-25 江苏晟楠电子科技有限公司 Fast pile inserting and extracting complete equipment

Similar Documents

Publication Publication Date Title
CN101974906A (en) Spiral pile driving connecting device
CN201818245U (en) Spiral pile driving and coupling device
CN201843141U (en) Spiral ground pile driving coupling device
CN202100192U (en) Spiral ground pile drilling rig
CN101975031A (en) Spiral ground pile driving coupling device
CN202963304U (en) Grounding downlead bending machine
CN214643274U (en) Portable shield constructs sealed frock of dismantling in front and back of machine
CN202373939U (en) Live-working double-conductor lifting device
CN201838937U (en) Insulating lifting rod used for installing puncture wire clip at ground potential
CN203603802U (en) Coiled tubing clamping and well-descending device
CN204966926U (en) Wire pressing machine
CN207006016U (en) A kind of LED street lamp of expansible solar panel
CN205968730U (en) Supplementary frock of screwing up of fluid pressure type bolt
CN203197832U (en) Locating pin pulling device
CN203071500U (en) Dismounting tool for cross-arm of original pole tower in power supply line migration process
CN201192767Y (en) Axle sleeve dismounting tool
CN202544792U (en) Novel casing back-off positioning and finishing device
CN202754049U (en) Spare wheel up-down regulator
CN202377962U (en) Wrench for fast installing bolts
CN201629417U (en) Double thread earthing dop
CN203607725U (en) Grounding line operating lever
CN203026844U (en) Pulling device for ground rod
CN203707667U (en) Live-line installation device of bird repellent
CN203403421U (en) Automatic rotation pipe device
CN201924333U (en) Self-dragging type relocation device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110525

Termination date: 20171026