CN201837646U - Insulated fixing device for lead disconnection position during preventative test of substation primary equipment - Google Patents

Insulated fixing device for lead disconnection position during preventative test of substation primary equipment Download PDF

Info

Publication number
CN201837646U
CN201837646U CN2010205881474U CN201020588147U CN201837646U CN 201837646 U CN201837646 U CN 201837646U CN 2010205881474 U CN2010205881474 U CN 2010205881474U CN 201020588147 U CN201020588147 U CN 201020588147U CN 201837646 U CN201837646 U CN 201837646U
Authority
CN
China
Prior art keywords
primary equipment
metal screw
lead
insulation
disconnection position
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205881474U
Other languages
Chinese (zh)
Inventor
周广
李非
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yichang Ehv Administration State Grid Operation Co ltd
Original Assignee
Yichang Ehv Administration State Grid Operation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yichang Ehv Administration State Grid Operation Co ltd filed Critical Yichang Ehv Administration State Grid Operation Co ltd
Priority to CN2010205881474U priority Critical patent/CN201837646U/en
Application granted granted Critical
Publication of CN201837646U publication Critical patent/CN201837646U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Insulating Bodies (AREA)

Abstract

The utility model relates to an insulated fixing device for a lead disconnection position during a preventative test of substation primary equipment. One end of a pull rod with an insulating sheath is connected with a metal screw. The diameter of the metal screw is slightly smaller than the diameter of a connecting bolt which connects the substation primary equipment with a lead. An insulating clamp body is fixed at the two ends of the lead disconnection position. The pull rod is perpendicularly connected with the metal screw. The insulating clamp body is chevron-shaped. Fixing bolts are respectively installed at the two ends of the insulating clamp body. The insulated fixing device for the lead disconnection position during the preventative test of substation primary equipment can solve the problem that the equipment is difficult to be disconnected with the lead in the existing method of using a rope, on the premise that test conditions are satisfied, the workload is greatly reduced and the work risk can be decreased; and since the pull rod is perpendicularly connected with the metal screw, the metal screw can be installed and detached conveniently, the speed is accelerated and the safety is further guaranteed.

Description

The disconnected place of drawing of transforming plant primary equipment preventive trial insulation stationary installation
Technical field
The utility model relates to a kind of insulation stationary installation, the disconnected place of drawing of especially a kind of transforming plant primary equipment preventive trial insulation stationary installation.
Background technology
Domestic when at present transforming plant primary equipment being carried out preventive trial, be connected between needing off device and going between, existing method be off device with lead-in wire between be connected after, by rope lead-in wire is drawn back again and fix, but because lead-in wire is thicker, weight is heavier, remove and install difficulty, not only workload is big, and because is because by rope work but not insulating tool has increased the work risk.
Summary of the invention
Technical problem to be solved in the utility model provides the disconnected place of drawing of a kind of transforming plant primary equipment preventive trial insulation stationary installation, can solve off device is connected difficulty with lead-in wire problem, satisfying on the basis of test condition, reduce workload greatly, reduced the work risk.
For solving the problems of the technologies described above, the technical scheme that the utility model adopted is: the disconnected place of drawing of a kind of transforming plant primary equipment preventive trial insulation stationary installation, pull bar one end of tape insulation sheath is connected with metal screw, the diameter of metal screw is slightly less than transforming plant primary equipment lead-in wire coupling bolt, and the insulation clamp is fixed on the disconnected two ends, place of drawing.
Pull bar is connected with metal screw is vertical.
The insulation clamp is " mountain " font, and insulation clamp two ends respectively are equipped with set bolt.
The disconnected place of drawing of the transforming plant primary equipment preventive trial that the utility model provides insulation stationary installation, because the diameter of the metal screw of band pull bar is slightly less than transforming plant primary equipment lead-in wire coupling bolt, pull down the lead-in wire coupling bolt, off device can carry out again temporary fixed to lead-in wire with lead-in wire with the metal screw of band pull bar when being connected, be fixed on the disconnected two ends, place of drawing with the insulation clamp again, the disconnected connecting portion that draws the place has been played the effect of reinforcing and make it to be in state of insulation, solved the existing method off device of rope that utilizes and be connected difficult problem with lead-in wire, satisfying on the basis of test condition, reduce workload greatly, reduced the work risk; The design connected vertically of pull bar and metal screw has made things convenient for the installation and removal of metal screw, has accelerated speed, has further guaranteed safety.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples:
Fig. 1 is a structural representation of the present utility model.
Embodiment
As shown in Figure 1, the disconnected place of drawing of a kind of transforming plant primary equipment preventive trial insulation stationary installation, pull bar 2 one ends of tape insulation sheath 1 are connected with metal screw 3, and the diameter of metal screw 3 is identical with transforming plant primary equipment lead-in wire coupling bolt, and insulation clamp 4 is fixed on the disconnected two ends, place of drawing.
Pull bar 2 and 3 vertical connections of metal screw.
Insulation clamp 4 is " mountain " font, and insulation clamp 4 two ends respectively are equipped with set bolt 5,5 '.
Embodiment of the present utility model is as follows:
At first take fixture wire place screw rod apart, use metal screw 3 to break to draw the two ends, place temporary fixed again, the space of enough insulation clamp 4 work is left in the position that the disconnected place of drawing that guarantees to take apart disconnects, again after temporary fixed the finishing, the clamp 4 that will insulate is placed in to break and draws the place, makes the middle clamp plate 6 of the centre of " mountain " font insulation clamp 4 be positioned at the position that the disconnected place of drawing disconnects, and tightens the set bolt 5 at insulation clamp 4 two ends again, 5 ' reinforces connecting portion, making the disconnected two ends, place of drawing be in state of insulation simultaneously.
Exist under a plurality of situations at fixture wire place screw rod, install after the step of a metal screw 3 removes the step of institute's leaded place bolt, the clamp 4 that insulate is installed in the manner described above again according to removing a bolt.

Claims (3)

1. the disconnected place of drawing of a transforming plant primary equipment preventive trial is with the stationary installation that insulate, it is characterized in that: pull bar (2) one ends of tape insulation sheath (1) are connected with metal screw (3), the diameter of metal screw (3) is slightly less than transforming plant primary equipment lead-in wire coupling bolt, and insulation clamp (4) is fixed on the disconnected two ends, place of drawing.
2. the disconnected place of drawing of transforming plant primary equipment preventive trial according to claim 1 is characterized in that: pull bar (2) and vertical connection of metal screw (3) with the insulation stationary installation.
3. the disconnected place of drawing of transforming plant primary equipment preventive trial according to claim 1 and 2 insulation stationary installation, it is characterized in that: insulation clamp (4) is " mountain " font, insulation clamp (4) two ends respectively are equipped with set bolt (5,5 ').
CN2010205881474U 2010-11-03 2010-11-03 Insulated fixing device for lead disconnection position during preventative test of substation primary equipment Expired - Fee Related CN201837646U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205881474U CN201837646U (en) 2010-11-03 2010-11-03 Insulated fixing device for lead disconnection position during preventative test of substation primary equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205881474U CN201837646U (en) 2010-11-03 2010-11-03 Insulated fixing device for lead disconnection position during preventative test of substation primary equipment

Publications (1)

Publication Number Publication Date
CN201837646U true CN201837646U (en) 2011-05-18

Family

ID=44007754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205881474U Expired - Fee Related CN201837646U (en) 2010-11-03 2010-11-03 Insulated fixing device for lead disconnection position during preventative test of substation primary equipment

Country Status (1)

Country Link
CN (1) CN201837646U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102509908A (en) * 2011-10-27 2012-06-20 上海电缆研究所 Electric conduction linkage structure for test of cable systems with voltage class of 500kV and below
CN103383400A (en) * 2013-07-09 2013-11-06 国家电网公司 Insulation safety device preventability test device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102509908A (en) * 2011-10-27 2012-06-20 上海电缆研究所 Electric conduction linkage structure for test of cable systems with voltage class of 500kV and below
CN102509908B (en) * 2011-10-27 2013-09-25 上海电缆研究所 Electric conduction linkage structure for test of cable systems with voltage class of 500kV and below
CN103383400A (en) * 2013-07-09 2013-11-06 国家电网公司 Insulation safety device preventability test device
CN103383400B (en) * 2013-07-09 2016-06-01 国家电网公司 A kind of insulation safety device preventability test device

Similar Documents

Publication Publication Date Title
CN204156135U (en) Hv cable termination earthing clamp
CN202930880U (en) Carbon fiber composite core wire dedicated connection hardware
CN204615332U (en) Bearing type insulating tension clamp
CN102545091B (en) Charged disconnecting wire lead clamp device
CN104505766A (en) Tool and method for live replacement of 500kV strain insulator strings in substations
CN201837646U (en) Insulated fixing device for lead disconnection position during preventative test of substation primary equipment
CN204037373U (en) Super capacitor tramway train charging rail system
CN201069828Y (en) T-shape line clamper for carbon fiber compound core lead
CN201435583Y (en) Quick bolt wedge type tension-endurable wire clamp
CN201608487U (en) Strain clamp of aluminium stranded wire of carbon fiber composite core
CN204067592U (en) A kind of earth connection conductor wire end wire clamp
CN103078190A (en) Puller type quick connector for emergency power van
CN202977160U (en) Electric remote control lead traction apparatus for transformer high-voltage bushing
CN203466529U (en) Insulation wire aluminum alloy reinforced strain-resistance wire clamp
CN203466505U (en) Device for vertically pulling cable
CN203339610U (en) Strain wire clamp used for 10kV overhead power distribution line
CN202047641U (en) Tail wire fixing device for electric power overhead line structure bracing wire
CN201717578U (en) Wedge-shaped insulation strain clamp for overhead distribution circuit
CN202940524U (en) Strain insulator assembly with wedge cable clamp
CN103094721A (en) Hook-type fast access joint for emergency supply vehicle
CN203289003U (en) Multifunctional insulating operating lever of transformer station
CN203119361U (en) Live-working insulating hook ladder door-sealing hook
CN203103518U (en) Hook type rapid connecting connector for emergency power supply vehicle
CN207234349U (en) Integrated precast strain clamp
CN204333286U (en) Aluminium alloy core high conductivity aluminium stranded conductor splicing sleeve

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110518

Termination date: 20141103

EXPY Termination of patent right or utility model