CN201824127U - Aligning device for installation of equipment - Google Patents

Aligning device for installation of equipment Download PDF

Info

Publication number
CN201824127U
CN201824127U CN2010205750158U CN201020575015U CN201824127U CN 201824127 U CN201824127 U CN 201824127U CN 2010205750158 U CN2010205750158 U CN 2010205750158U CN 201020575015 U CN201020575015 U CN 201020575015U CN 201824127 U CN201824127 U CN 201824127U
Authority
CN
China
Prior art keywords
equipment
alignment device
screw thread
bool
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205750158U
Other languages
Chinese (zh)
Inventor
常永平
***
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huaye Group Co Ltd
Original Assignee
China Huaye Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huaye Group Co Ltd filed Critical China Huaye Group Co Ltd
Priority to CN2010205750158U priority Critical patent/CN201824127U/en
Application granted granted Critical
Publication of CN201824127U publication Critical patent/CN201824127U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides an aligning device for installation of equipment, comprising a rigid jacking part and a bracket, wherein the bracket comprises a baffle, a base, a connector and a bending part, wherein the base is used for blocking the rigid jacking part to enable the jacking direction of the rigid jacking part to be vertical to the baffle; one end of the connector is vertically fixed on the baffle, and the other end is provided with a thread; one end of the bending part is provided with a thread matched with the thread arranged on the other end of the connector, and the other end is vertically bent opposite to the end thereof provided with the thread; and the end of the bending part provided with the thread can be in threaded connection with the end of the connector provided with the thread, and can adjust the total connected length of the connector and the bending part through mutual rotation and adjust the direction of the bending end of the bending part in a plane vertical to the end of the bending part provided with the thread.

Description

Equipment is installed alignment device
Technical field
The utility model relates to a kind of equipment that can accurately finely tune the position and the direction of big-and-middle-sized equipment alignment device is installed.
Background technology
Big-and-middle-sized equipment is being installed, for example, when large-size machine is installed, is being built mounting platform usually earlier, the preformed hole that a plurality of (for example four) are used for fixing equipment to be installed is being set on mounting platform again.Then, at least one cushion block is set around each preformed hole in described a plurality of preformed holes,, makes the upper surface of all cushion blocks all be positioned at the predetermined plane of sustained height with the meticulous height of regulating described each cushion block of spirit level.Then, by suspender (for example crane) equipment to be installed is gently placed on the described cushion block from the top down.Afterwards, adjust described equipment, its position in described plane and precalculated position are overlapped and its orientation in described plane is aimed at predetermined direction by the centering process.At this moment, the position of the preformed hole on the described mounting platform is corresponding with the position of default through hole on the base of described equipment respectively.For each is equipped with a foundation bolt to preformed hole-through hole, one end of described foundation bolt is placed in the described preformed hole, and the other end that makes described foundation bolt passes and the corresponding through hole of described preformed hole, and with nut this foundation bolt is hung on the base of described equipment.Then, inject concrete in each preformed hole, an end that will be in the foundation bolt in the described preformed hole is imbedded in the concrete, like this, waits after the concrete hardening, and described foundation bolt and nut just are fixed on the base of described equipment on the described mounting platform.
In above-mentioned centering process, use lever class instruments such as crowbar to carry out centering usually.For main equipment, weight reaches several tons even tens tons, and for this class high-speed rotating equipment of large-size machine, the precision of centering need reach 0.05mm or higher accuracy.Only in this way, just can make the rotating shaft of motor and the rotating shaft precision-fit of load, thereby improve efficiency of motor and reduce noise.Obviously, levers such as use crowbar carry out centering and are difficult to realize this precision, and operating efficiency is very low.
The utility model content
The utility model is made in order to solve above-mentioned problems of the prior art face, its purpose be to provide a kind of easy easy-to-use, can alignment device be installed to the equipment that the position and the direction of big-and-middle-sized equipment are accurately finely tuned.
To achieve these goals, the utility model provides a kind of equipment that alignment device is installed, and it comprises: rigid top is lifted part and support.Wherein, described support comprises: baffle plate, be used to block the base that described rigid top is lifted part, and direction is lifted perpendicular to described baffle plate in the top that makes described rigid top lift part; Connector, one end are vertically fixed on the described baffle plate, and its other end is provided with screw thread; And bool, the one end is provided with the screw thread that the screw thread with the described other end of described connector is complementary, and its other end vertically bends with respect to its described end that is provided with screw thread.An end that is provided with screw thread of described bool can be spirally connected with an end that is provided with screw thread of described connector, and the end of described bending that can regulate the length overall of the described connector that is connected and bool and can regulate described bool by mutual rotation is perpendicular to the sensing in the plane of the end that is provided with screw thread of described bool.
Preferably, described rigid top act part is jack or hydraulic test.
Preferably, described connector is the steel pipe that an end is provided with internal thread.
Preferably, described connector is by being arranged in outside welding two or many members that parallel connecting reinforcement forms of the two or more identical nut that can be passed by a bolts.
Preferably, described bool forms by the harness cord screw rod being bent into orthogonal long and short two section.
Preferably, described bool forms by the vertical with it reinforcing bar of end welding at the harness cord screw rod.
From the above mentioned, equipment described in the utility model is installed alignment device and can be finely tuned accurately the position and the direction of the equipment of weigh several tons even tens tons, is a kind of convenience, flexible, practical equipment centering instrument.
Description of drawings
Fig. 1 is the schematic diagram that the described equipment of an embodiment of the present utility model is installed alignment device;
Fig. 2 is that the described equipment of an embodiment of the present utility model is installed the schematic diagram of the using method of alignment device when equipment is carried out thick centering;
Fig. 3 is the local enlarged diagram of Fig. 2, shows the described equipment of an embodiment of the present utility model a kind of using method of alignment device when equipment is carried out smart centering is installed;
Fig. 4 is the local enlarged diagram of Fig. 2, shows the described equipment of an embodiment of the present utility model the another kind of using method of alignment device when equipment is carried out smart centering is installed.
The specific embodiment
Describe equipment described in the utility model below with reference to the accompanying drawings alignment device is installed.Those of ordinary skill in the art can recognize, under the situation that does not depart from spirit and scope of the present utility model, can revise described embodiment with various mode.Therefore, accompanying drawing is illustrative with being described in essence, rather than is used to limit the protection domain of claim.In addition, in this manual, the various piece in the accompanying drawing is drawn not in scale, and identical Reference numeral is represented identical part.
Fig. 1 is the schematic diagram that the described equipment of an embodiment of the present utility model is installed alignment device.As shown in Figure 1, the described equipment of an embodiment of the present utility model is installed alignment device 100 and is comprised jack 10 and support 20, and wherein, support 20 comprises baffle plate 21, steel pipe 22 and knee 23.Baffle plate 21 is the strip steel plate, the base size of its width and described jack 10 is suitable, hold the base of jack 10 well so that can make baffle plate 21 as hereinafter described, and its length can be longer, so that the base of jack 10 can be moved along this length direction, thereby makes the top of jack 10 can prop up the correct position for the treatment of on the centering equipment.The thickness of baffle plate 21 will make baffle plate 21 not deform in equipment centering process.One end 22a of steel pipe 22 is provided with internal thread.The other end that an end 22a with being provided with internal thread of steel pipe 22 is relative is welded on an end of center line on the length direction of baffle plate 21, makes steel pipe 22 perpendicular to baffle plate 21.Knee 23 is a L type round steel, and its long-armed 23a is provided with external screw thread, the internal thread coupling of this external screw thread and steel pipe 22; Its galianconism 23b is vertical with its long-armed 23a.The long-armed 23a of knee 23 can insert among the end 22a who is provided with screw thread of steel pipe 22 and in steel pipe 22 and rotate, thus the advance and retreat in the steel pipe 22 that are engaged in by screw thread.
Below in conjunction with Fig. 2 and Fig. 3 the use of the described equipment installation alignment device 100 of an embodiment of the present utility model in equipment centering process is described.Fig. 2 is that the described equipment of an embodiment of the present utility model is installed the schematic diagram of the using method of alignment device 100 when equipment is carried out thick centering.Fig. 3 is the local enlarged diagram of Fig. 2, shows the described equipment of an embodiment of the present utility model a kind of using method of alignment device 100 when equipment is carried out smart centering is installed.Fig. 4 is the local enlarged diagram of Fig. 2, shows the described equipment of an embodiment of the present utility model the another kind of using method of alignment device 100 when equipment is carried out smart centering is installed.
As shown in Figure 2, when erection unit, build mounting platform 200 earlier, mounting platform 200 can be built of concrete.The preformed hole 210 that a plurality of (for example four) extend downwards perpendicular to the surface of mounting platform 200 is set on mounting platform 200.Then, each preformed hole in described a plurality of preformed holes 210 around at least one cushion block 300 is set.With the meticulous height of regulating described each cushion block 300 of spirit level, make the upper surface of all cushion blocks 300 all be positioned at the predetermined plane of sustained height.Then, by the suspender (not shown) equipment 400 to be installed is gently placed on the described cushion block 300 from the top down.Afterwards, use the described equipment of an embodiment of the present utility model that 100 pairs of equipment of alignment device 400 are installed and carry out thick centering.
Earlier according to the height of jack 10, preformed hole 210 position apart from the outer surface of the distance of the outer wall of mounting platform 200 and equipment 400, equipment is installed being provided with among the end 22a who is provided with internal thread of steel pipe 22 that an externally threaded end 23a inserts support 20 and rotating of knee 23 of the support 20 in the alignment device 100, regulated the horizontal length of support 20.Then, support 20 is placed between platform 200 and the equipment 400, and make the vertical inwall of putting into preformed hole 210 down and touching preformed hole 210 of galianconism 23b of the knee 23 of support 20.Then jack 10 is placed between the outer surface of baffle plate 21 and equipment 400, regulate jack 10, its base is contacted with baffle plate 21, the top contacts with the outer surface of equipment 400.Then, continue to regulate jack 10, make its promotion equipment 400 in horizontal plane, do small moving and rotating.
Adopt the step identical with said process, utilize equipment that alignment device 100 is installed and repeatedly equipment 400 is carried out centering in four bights of equipment 400, the position of equipment 400 in described plane and precalculated position are overlapped and the orientation of equipment 400 in described plane aimed at predetermined direction, thereby finish thick centering.The precision of thick centering is about 0.05mm~0.2mm.
At this moment, the position of the preformed hole 210 on the mounting platform 200 is corresponding with the position of default through hole 410 on the base of equipment 400 respectively.For each is equipped with a foundation bolt 500 to preformed hole-through hole, one end 500a of foundation bolt 500 is placed in the preformed hole 210, and the other end 500b that makes foundation bolt 500 passes and described preformed hole 210 corresponding through holes 410, and with nut 510 foundation bolt 500 is hung on the base of equipment 400.Then, as shown in Figure 3, inject concrete 220 in each preformed hole 210, an end 500a that will be in the foundation bolt 500 in the preformed hole 210 manages in the concrete 220.After concrete 220 hardens a bit a little, dig out an aperture 230 that can insert galianconism 23b in the residing position of galianconism 23b of the knee 23 of thick centering process medium-height trestle 20.
Then, inject concrete 220 for example seven big after (this moment solidify concrete intensity greater than design strength 70%), can carry out smart centering to equipment 400.At this moment, foundation bolt 500 and nut 510 are limited to the base of equipment 400 on the described mounting platform 200, but, therefore, can carry out accurate adjustment to the position and the angle of equipment 400 because the diameter of the through hole 410 on the base of equipment 400 is bigger slightly than the diameter of foundation bolt 500.
Adopt process same as described above, equipment 400 is carried out smart centering, in smart centering process, the galianconism 23b of the knee 23 of support 20 inserts in the concrete 220 and excavates in the aperture 230.The precision of smart centering can be smaller or equal to 0.05mm.
Should be understood that some steps in the above-mentioned centering process can put upside down.Such as, before placement devices 400, foundation bolt 500 is placed in the preformed hole 210, so that after equipment 400 is laid, foundation bolt 500 is hung on the base of equipment 400.Also can earlier foundation bolt 500 be hung on the base of equipment 400, placement devices 400 then.
Below with reference to Fig. 4 the another kind of using method of the described equipment installation alignment device 100 of an embodiment of the present utility model when equipment is carried out smart centering is described.
As shown in Figure 4, in this using method, need in concrete 220, not form aperture 230.The long-armed 23a of the knee 23 by swinging mounting 20 makes the galianconism 23b of knee 23 reach foundation bolt 500 places, and makes galianconism 23b become state perpendicular to paper by vertically downward state, thereby hooks foundation bolt 500.Can carry out smart centering then.
In each embodiment of the present utility model, jack 10 also can be a hydraulic means.Baffle plate 21 also can be made the member of adjustable length.Steel pipe 22 also can be used in two of outside welding being arranged in the two or more identical nut that can be passed by a bolts or many parallel connecting reinforcements and the member that forms substitutes.Knee 23 can be used in the terminal member that welds quarter butt and form of harness cord screw rod and substitute.Also can on mounting platform 200, set in advance the short column lower in advance, provide impetus so that in the centering process, alignment device 100 is installed for equipment than cushion block 300.
Should be noted that those of skill in the art can carry out various improvement, be out of shape and organize a performance on the basis of the foregoing description, and these improvement, distortion and combination are also all within protection domain of the present utility model.Should be understood that above-mentioned specific descriptions just are used for illustrating the utility model, protection domain of the present utility model is limited by appended claims and equivalent thereof.

Claims (6)

1. an equipment is installed alignment device, it is characterized in that, comprises rigid top act part and support;
Wherein, described support comprises:
Baffle plate is used to block the base that described rigid top is lifted part, and direction is lifted perpendicular to described baffle plate in the top that makes described rigid top lift part;
Connector, one end are vertically fixed on the described baffle plate, and its other end is provided with screw thread; And
Bool, one end are provided with the screw thread that the screw thread with the described other end of described connector is complementary, and its other end vertically bends with respect to its described end that is provided with screw thread, wherein,
An end that is provided with screw thread of described bool can be spirally connected with an end that is provided with screw thread of described connector, and the end of described bending that can regulate the length overall of the described connector that is connected and bool and can regulate described bool by mutual rotation is perpendicular to the sensing in the plane of the end that is provided with screw thread of described bool.
2. equipment according to claim 1 is installed alignment device, it is characterized in that,
It is jack or hydraulic test that described rigid top is lifted part.
3. equipment according to claim 1 is installed alignment device, it is characterized in that,
Described connector is the steel pipe that an end is provided with internal thread.
4. equipment according to claim 1 is installed alignment device, it is characterized in that,
Described connector is by being arranged in outside welding two or many members that parallel connecting reinforcement forms of the two or more identical nut that can be passed by a bolts.
5. equipment according to claim 1 is installed alignment device, it is characterized in that,
Described bool forms by the harness cord screw rod being bent into orthogonal long and short two section.
6. equipment according to claim 1 is installed alignment device, it is characterized in that,
Described bool forms by the vertical with it reinforcing bar of end welding at the harness cord screw rod.
CN2010205750158U 2010-10-18 2010-10-18 Aligning device for installation of equipment Expired - Lifetime CN201824127U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205750158U CN201824127U (en) 2010-10-18 2010-10-18 Aligning device for installation of equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205750158U CN201824127U (en) 2010-10-18 2010-10-18 Aligning device for installation of equipment

Publications (1)

Publication Number Publication Date
CN201824127U true CN201824127U (en) 2011-05-11

Family

ID=43962685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205750158U Expired - Lifetime CN201824127U (en) 2010-10-18 2010-10-18 Aligning device for installation of equipment

Country Status (1)

Country Link
CN (1) CN201824127U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102756441A (en) * 2012-06-21 2012-10-31 南京甬博数控科技有限公司 Horizontal adjustment device of wind turbine blade mould
CN109000096A (en) * 2018-07-26 2018-12-14 湘潭市恒欣实业有限公司 The installation method of split type SQ-1200 endless rope series tractor winch

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102756441A (en) * 2012-06-21 2012-10-31 南京甬博数控科技有限公司 Horizontal adjustment device of wind turbine blade mould
CN109000096A (en) * 2018-07-26 2018-12-14 湘潭市恒欣实业有限公司 The installation method of split type SQ-1200 endless rope series tractor winch

Similar Documents

Publication Publication Date Title
CN100585098C (en) Underground preburied column high-precision smart verticality-regulating system and mounting construction method
CN101266011A (en) Mounting device for preburying high precision major diameter anchor bolt and mounting method therefor
CN210216479U (en) Positioning device for pre-embedding large foundation bolt group
CN112127641A (en) Accurate fixing method for anchor plate foundation bolt
CN102926538A (en) Reaction box and construction method of reaction wall
CN107336346A (en) A kind of beam making bench
CN212104166U (en) Accurate positioning device for embedded bolt of safety injection box of nuclear power station
CN201824127U (en) Aligning device for installation of equipment
CN202957493U (en) Transformer rack overall installation device
CN206408951U (en) A kind of architectural industrialization project conversion layer position level ladder muscle
CN102983517B (en) A kind of integral installation device for transformer test bench
CN208830444U (en) Inspection shaft steel combined template
CN201495556U (en) Structure for quickly hoisting and centering base of large steel frame
CN110886332A (en) Wall foundation underpinning device and construction method thereof
CN109201971A (en) For making the positioning device and its construction method of pile foundation steel bar cage
CN210395423U (en) Tower machine basis installation positioner
CN210239143U (en) Reserved hole sleeve fixing part for laminated floor slab
CN208073012U (en) A kind of foundation bolt location centralizing device
JP2556215B2 (en) Construction method
CN201433342Y (en) T beam bottom web steel bar binding mould
CN208415285U (en) A kind of steel cushion cap support leveling system of offshore wind turbine foundation
CN202769052U (en) Pipeline movable cradle
CN218562389U (en) Support frame for embedded type stiff steel column
CN201367735Y (en) Adjustable reinforced cable device
CN219864360U (en) Temporary supporting device for non-embedded large-scale landscape steel structural column

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110511