CN201809042U CN2010202891703U CN201020289170U CN201809042U CN 201809042 U CN201809042 U CN 201809042U CN 2010202891703 U CN2010202891703 U CN 2010202891703U CN 201020289170 U CN201020289170 U CN 201020289170U CN 201809042 U CN201809042 U CN 201809042U
Authority
CN
China
Prior art keywords
place
pin
roof beam
sets
lower floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202891703U
Other languages
Chinese (zh)
Inventor
杨树民
徐冬青
杨金有
徐高山
杨志安
刘小东
杨本冉
李涛
陶威
张绪强
王丙吉
李正
陈森
郭文华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
China Railway 22nd Bureau Group Co Ltd
First Engineering Co Ltd of China Railway No 12 Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
China Railway 22nd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd, China Railway 22nd Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
Priority to CN2010202891703U priority Critical patent/CN201809042U/en
Application granted granted Critical
Publication of CN201809042U publication Critical patent/CN201809042U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model relates to a lifting frame for lifting a whole steel reinforcement framework of a box beam, comprising an upper-layer piece of frame beam and a lower-layer piece of frame beam; the upper-layer piece of frame beam is narrower than the lower-layer piece of frame beam; and the width of the lower-layer piece of frame beam is matched with that of the steel reinforcement framework of the box beam. The lifting frame is characterized in that vertical supports and diagonal bracings are connected between the upper-layer piece of frame beam and the lower-layer piece of frame beam; and the intersection positions of the diagonal bracings are connected by connecting plates. The lifting frame is reasonable in structure, high in strength and more in lifting points, can bear the weight of the whole bundled steel reinforcement framework of the box beam, and is very beneficial to being promoted and applied.

Description

Steel bar framework of box beam integral hoisting suspension bracket
Technical field
The utility model relates to a kind of high speed railway box girder manufacture technology field, particularly relates to a kind of steel bar framework of box beam integral hoisting suspension bracket.
Background technology
In high speed railway and railway line for passenger traffic construction, 900 tons of case beams are to use maximum beam types, and each Liang Chang all bears the production task of hundreds of sheet.Reinforcing bar is about 70 tons in 900 tons of case beams of each sheet, about 3 days of colligation time, if colligation on beam making bench then reduce the service efficiency of beam making bench and template greatly, prolong construction period, can only reinforcing bar extraterrestrial overall binding on the scene is good during construction, then framework of steel reinforcement integral body is hung in the template, but whole framework of steel reinforcement is from great, the very few words framework of steel reinforcement of suspension centre is out of shape serious, can't satisfy requirements for quality, therefore must process the lifting in place that a kind of special suspender is used for framework of steel reinforcement.
The utility model content
The purpose of this utility model is at the problems referred to above, proposes a kind of steel bar framework of box beam integral hoisting suspension bracket, and it is many that this suspender has a suspension centre, advantages of high strength.
The technical solution of the utility model is: a kind of steel bar framework of box beam integral hoisting suspension bracket, comprise that upper strata Pin sets a roof beam in place and the Pin of lower floor sets a roof beam in place, described upper strata Pin set a roof beam in place set a roof beam in place than lower floor Pin slightly narrow, width that the described Pin of lower floor sets a roof beam in place and the width of steel bar framework of box beam coupling, be connected with perpendicular support and diagonal brace between described upper strata Pin sets a roof beam in place and the Pin of lower floor sets a roof beam in place, described diagonal brace infall connects by connecting panel.
Described upper strata Pin sets a roof beam in place, the Pin of lower floor sets a roof beam in place all contains several longitudinal and cross beams, and described longeron is parallel with the length direction of this suspension bracket, and the Width of described crossbeam and this suspension bracket is parallel.
The longeron that described upper strata Pin sets a roof beam in place on top, crossbeam is in the bottom; The longeron that the described Pin of lower floor sets a roof beam in place in the bottom, crossbeam is on top.
The longitudinal and cross beam that described upper strata Pin sets a roof beam in place is channel-section steel, and the longitudinal and cross beam that the described Pin of lower floor sets a roof beam in place is channel-section steel, and described perpendicular support and diagonal brace are angle steel.
The longeron that described Pin down sets a roof beam in place is provided with several downward suspension centres, and the longeron that described upward Pin sets a roof beam in place is provided with the suspension centre that several make progress.
The beneficial effects of the utility model
This hanger structure is reasonable in design, the intensity height, and suspension centre is many, the weight of the framework of steel reinforcement of the overall binding of its case beam that can bear.
Description of drawings
Fig. 1 is this steel bar framework of box beam integral hoisting suspension bracket end face structure scheme drawing
Fig. 2 is this steel bar framework of box beam integral hoisting cradle sides structural representation
Fig. 3-Fig. 6 is the structural representation of the node 1-node 4 among Fig. 2
Fig. 7-Figure 11 is the structural representation of the node 5-node 9 among Fig. 1
The specific embodiment
Referring to Fig. 1-Figure 11,1. connecting panels among the figure, 2. diagonal brace, 3. perpendicular support, 4. go up the crossbeam of Pin frame, 5. descend the crossbeam of Pin frame, 6. diagonal brace, 7. go up the longeron of Pin frame, 8. descend the longeron of Pin frame.
Embodiment: a kind of steel bar framework of box beam integral hoisting suspension bracket, comprise that upper strata Pin sets a roof beam in place and the Pin of lower floor sets a roof beam in place, described upper strata Pin set a roof beam in place set a roof beam in place than lower floor Pin slightly narrow, width that the described Pin of lower floor sets a roof beam in place and the width of steel bar framework of box beam coupling, be connected with perpendicular support and diagonal brace between described upper strata Pin sets a roof beam in place and the Pin of lower floor sets a roof beam in place, described diagonal brace infall connects by connecting panel.
Described upper strata Pin sets a roof beam in place, the Pin of lower floor sets a roof beam in place all contains several longitudinal and cross beams, and described longeron is parallel with the length direction of this suspension bracket, and the Width of described crossbeam and this suspension bracket is parallel.
The longeron that described upper strata Pin sets a roof beam in place on top, crossbeam is in the bottom; The longeron that the described Pin of lower floor sets a roof beam in place in the bottom, crossbeam is on top.
The longitudinal and cross beam that described upper strata Pin sets a roof beam in place is channel-section steel, and the longitudinal and cross beam that the described Pin of lower floor sets a roof beam in place is channel-section steel, and described perpendicular support and diagonal brace are angle steel.
The longeron that described Pin down sets a roof beam in place is provided with several downward suspension centres, and the longeron that described upward Pin sets a roof beam in place is provided with the suspension centre that several make progress.

Claims (5)

1. steel bar framework of box beam integral hoisting suspension bracket, comprise that upper strata Pin sets a roof beam in place and the Pin of lower floor sets a roof beam in place, described upper strata Pin set a roof beam in place set a roof beam in place than lower floor Pin slightly narrow, width that the described Pin of lower floor sets a roof beam in place and the width of steel bar framework of box beam coupling, it is characterized in that: be connected with perpendicular support and diagonal brace between described upper strata Pin sets a roof beam in place and the Pin of lower floor sets a roof beam in place, described diagonal brace infall connects by connecting panel.
2. steel bar framework of box beam integral hoisting suspension bracket according to claim 1, it is characterized in that: described upper strata Pin sets a roof beam in place, the Pin of lower floor sets a roof beam in place all contains several longitudinal and cross beams, described longeron is parallel with the length direction of this suspension bracket, and the Width of described crossbeam and this suspension bracket is parallel.
3. steel bar framework of box beam integral hoisting suspension bracket according to claim 2 is characterized in that: the longeron that described upper strata Pin sets a roof beam in place on top, crossbeam is in the bottom; The longeron that the described Pin of lower floor sets a roof beam in place in the bottom, crossbeam is on top.
4. steel bar framework of box beam integral hoisting suspension bracket according to claim 2 is characterized in that: the longitudinal and cross beam that described upper strata Pin sets a roof beam in place is channel-section steel, and the longitudinal and cross beam that the described Pin of lower floor sets a roof beam in place is channel-section steel, and described perpendicular support and diagonal brace are angle steel.
5. steel bar framework of box beam integral hoisting suspension bracket according to claim 2 is characterized in that: the longeron that the described Pin of lower floor sets a roof beam in place is provided with several downward suspension centres, and the longeron that described upper strata Pin sets a roof beam in place is provided with the suspension centre that several make progress.
CN2010202891703U 2010-08-12 2010-08-12 Lifting frame for lifting whole steel reinforcement framework of box beam Expired - Fee Related CN201809042U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202891703U CN201809042U (en) 2010-08-12 2010-08-12 Lifting frame for lifting whole steel reinforcement framework of box beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202891703U CN201809042U (en) 2010-08-12 2010-08-12 Lifting frame for lifting whole steel reinforcement framework of box beam

Publications (1)

Publication Number Publication Date
CN201809042U true CN201809042U (en) 2011-04-27

Family

ID=43891982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202891703U Expired - Fee Related CN201809042U (en) 2010-08-12 2010-08-12 Lifting frame for lifting whole steel reinforcement framework of box beam

Country Status (1)

Country Link
CN (1) CN201809042U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383376A (en) * 2011-08-15 2012-03-21 中铁六局集团有限公司 Ground moulding and integral hoisting method for large-tonnage steel bar bound finished product member
CN105540422A (en) * 2016-01-06 2016-05-04 北京航天发射技术研究所 Extending hanger-shaft type light lifting fixture for turning over and product turnover method
CN108557627A (en) * 2018-05-25 2018-09-21 浙江交工集团股份有限公司 The integral type suspender of prefabricated part hanging in bale handle station
CN113896084A (en) * 2021-08-26 2022-01-07 舟山长宏国际船舶修造有限公司 Single loop wheel machine hoist and mount overlength fan blade gallows

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383376A (en) * 2011-08-15 2012-03-21 中铁六局集团有限公司 Ground moulding and integral hoisting method for large-tonnage steel bar bound finished product member
CN105540422A (en) * 2016-01-06 2016-05-04 北京航天发射技术研究所 Extending hanger-shaft type light lifting fixture for turning over and product turnover method
CN105540422B (en) * 2016-01-06 2017-10-03 北京航天发射技术研究所 The overhanging upset of hanging shaft type lightweight lifting type frame and product method for turning
CN108557627A (en) * 2018-05-25 2018-09-21 浙江交工集团股份有限公司 The integral type suspender of prefabricated part hanging in bale handle station
CN113896084A (en) * 2021-08-26 2022-01-07 舟山长宏国际船舶修造有限公司 Single loop wheel machine hoist and mount overlength fan blade gallows

Similar Documents

Publication Publication Date Title
CN201172574Y (en) Precast beam reinforced bar hoisting rack
CN205934747U (en) A hang basket that is used for cantilever to pour bridge construction operation with pre -compaction structure
CN201809042U (en) Lifting frame for lifting whole steel reinforcement framework of box beam
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN101633483B (en) Integral lifting apparatus for steel structure net rack
CN203187288U (en) Box girder hanger
CN202967849U (en) Integral steel reinforcement cage lifting appliance
CN206233122U (en) For bridge cantilever construction with Hanging Basket movable tower crane
CN108518071B (en) Installation method of double-layer large-span steel structure corridor
CN205772893U (en) A kind of king-tower function at most lifting traction apparatus
CN102398849A (en) Method for moving whole crawler crane down to dock
CN201817201U (en) Trolley slippage construction device
CN201722621U (en) Integral hoisting frame of pre-fabricated box beam
CN201530994U (en) Height-adjustable back supporting mechanism for bridge erecting machine
CN203795318U (en) Integral hoisting system for rebar cage for large members
CN203626236U (en) Spliced formwork supporting truss with aluminum formwork on top surface
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN201952103U (en) Steel-bar lifting frame
CN203079596U (en) Tower crane and climbing frame thereof
CN205153124U (en) Steel construction building bearing axle
CN110359548A (en) A kind of steel truss suspension hybrid system and construction method
CN204607381U (en) A kind of superimposed sheet Steel bar hanger
CN204823595U (en) Shoulder pole hanging beam formula U type goods lift cage frame is joined in marriage to oblique pull rod of construction elevator isosceles
CN204225464U (en) A kind of regularization hanging feet hand structure
CN204825670U (en) Inclined to one side hanging beam frame device is prevented turning round by eccentric case roof beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110427

Termination date: 20190812