CN201788584U - Remote management device for large consumer electricity meters - Google Patents
Remote management device for large consumer electricity meters Download PDFInfo
- Publication number
- CN201788584U CN201788584U CN2010202631180U CN201020263118U CN201788584U CN 201788584 U CN201788584 U CN 201788584U CN 2010202631180 U CN2010202631180 U CN 2010202631180U CN 201020263118 U CN201020263118 U CN 201020263118U CN 201788584 U CN201788584 U CN 201788584U
- Authority
- CN
- China
- Prior art keywords
- electric energy
- unit
- management device
- communication module
- main control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The utility model relates to a remote management device for large consumer electricity meters, which comprises a power source module, an electric energy information acquisition unit, a reading unit, a remote transmission unit, a liquid crystal display, an infrared communication module and a main control module. The power source module is connected with the electric energy information acquisition unit, the reading unit, the remote transmission unit, the liquid crystal display, the infrared communication module and the main control module respectively, and the main control module is connected with the electric energy information acquisition unit, the reading unit, the remote transmission unit, the liquid crystal display and the infrared communication module respectively. Compared with the prior art, the remote management device has the advantages of integrating functions of automatic meter reading, field electric energy quality monitoring, low-voltage warning and timing, on-spot power distribution management and the like.
Description
Technical field
The utility model relates to a kind of large user remote administration terminal of checking meter, and especially relates to a kind of large user's of being used for ammeter long-distance management device.
Background technology
Most at home areas, the copy reading of multi-functional large user's ammeter also relies on manually-operated, and the manually-operated real-time is poor, and accuracy is low, and lacks the full and accurate record that lasts, and is unfavorable for the intelligent construction of electric network reconstruction and distribution.
Summary of the invention
The purpose of this utility model be exactly provide in order to overcome the defective that above-mentioned prior art exists that functions such as a kind of automatic data logging, field electric energy quality monitoring, low-voltage warning and timing, distribution field management are integrated in one be used for large user's ammeter long-distance management device.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of large user's ammeter long-distance management device that is used for, it is characterized in that, comprise power module, acquiring electric energy information unit, meter reading unit, remote transmission unit, LCD, infrared communication module and main control module, described power module is connected with acquiring electric energy information unit, meter reading unit, remote transmission unit, LCD, infrared communication module, main control module respectively, and described main control module is connected with acquiring electric energy information unit, meter reading unit, remote transmission unit, LCD, infrared communication module respectively.
Described acquiring electric energy information unit comprises sample circuit, electric energy computation chip.
Described remote transmission unit comprises microprocessor, GPRS communication module, is connected with long-range main website by ICP/IP protocol or File Transfer Protocol.
Compared with prior art, the utlity model has functions such as automatic data logging, field electric energy quality monitoring, low-voltage warning and timing, distribution field management and be integrated in one, the energy monitor precision reaches 0.5 grade; Can effectively monitor on-the-spot mutual inductor state; Can use TCP or FTP that the utility model is carried out remote automatic upgrading.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Embodiment
Below in conjunction with the drawings and specific embodiments the utility model is elaborated.
Embodiment
As shown in Figure 1, a kind of large user's ammeter long-distance management device that is used for, comprise power module 1, acquiring electric energy information unit 2, meter reading unit 3, remote transmission unit 4, LCD 5, infrared communication module 6 and main control module 7, described power module 1 is connected with acquiring electric energy information unit 2, meter reading unit 3, remote transmission unit 4, LCD 5, infrared communication module 6, main control module 7 respectively, and described main control module 7 is connected with acquiring electric energy information unit 2, meter reading unit 3, remote transmission unit 4, LCD 5, infrared communication module 6 respectively.
Power module 1 is made up of devices such as three single transformers, DC-DC electric energy chip and resistance, electric capacity, inductance, can compatible phase three-wire three and the mode of connection of three-phase and four-line, under the three-phase and four-line pattern, support single phase power supply and heterogeneous power supply, under the phase three-wire three pattern, need only any two-phase and insert power module, power module gets final product the required level of normal output services, and feed system uses.
Acquiring electric energy information unit 2 is changed to the small-signal that the energy computation chip of can powering is gathered by sample circuits such as current transformer and voltage transformer (VT) with electric current and voltage signal dress, thereby electric energy computation chip is by measuring the true electrical energy parameter of inferring in the electrical network to the small-signal after the conversion.
What LCD 5 adopted is the wide short in size liquid crystal of high temperature, can realize the convenient inquiry of local data, guarantees the stable operation in rugged surroundings.Liquid Crystal Module is used for the various information in the local search terminal, convenient on-the-spot inquiry maintenance.
Main control module 7 is by a MCU, and external FLASH chip and eeprom chip adopt Rx8025 that system clock is provided, and are responsible for each task module of scheduling, realizes the storage of data and reads, and realizes the allomeric function of terminal.
This terminal has realized the long-range copy reading of large user's ammeter and management have automatically been realized the real-time monitoring to the distribution scene, has helped improving the automaticity of electrical power trans mission/distribution system.
Claims (3)
1. one kind is used for large user's ammeter long-distance management device, it is characterized in that, comprise power module, acquiring electric energy information unit, meter reading unit, remote transmission unit, LCD, infrared communication module and main control module, described power module is connected with acquiring electric energy information unit, meter reading unit, remote transmission unit, LCD, infrared communication module, main control module respectively, and described main control module is connected with acquiring electric energy information unit, meter reading unit, remote transmission unit, LCD, infrared communication module respectively.
2. a kind of large user's ammeter long-distance management device that is used for according to claim 1 is characterized in that described acquiring electric energy information unit comprises sample circuit, electric energy computation chip.
3. a kind of large user's ammeter long-distance management device that is used for according to claim 1 is characterized in that described remote transmission unit comprises microprocessor, GPRS communication module, is connected with long-range main website by ICP/IP protocol or File Transfer Protocol.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202631180U CN201788584U (en) | 2010-07-19 | 2010-07-19 | Remote management device for large consumer electricity meters |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202631180U CN201788584U (en) | 2010-07-19 | 2010-07-19 | Remote management device for large consumer electricity meters |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201788584U true CN201788584U (en) | 2011-04-06 |
Family
ID=43820541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202631180U Expired - Fee Related CN201788584U (en) | 2010-07-19 | 2010-07-19 | Remote management device for large consumer electricity meters |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201788584U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102621363A (en) * | 2012-03-30 | 2012-08-01 | 上海市电力公司 | Intelligent single-phase electrical energy metering tank |
CN111107159A (en) * | 2019-12-27 | 2020-05-05 | 广东电网有限责任公司 | Remote metering system |
-
2010
- 2010-07-19 CN CN2010202631180U patent/CN201788584U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102621363A (en) * | 2012-03-30 | 2012-08-01 | 上海市电力公司 | Intelligent single-phase electrical energy metering tank |
CN111107159A (en) * | 2019-12-27 | 2020-05-05 | 广东电网有限责任公司 | Remote metering system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203310911U (en) | Multifunctional intelligent ammeter system based on Internet of Things | |
CN107105056A (en) | A kind of cloud control electric meter system based on WiFi communication | |
CN105513328A (en) | Electric meter system based on Wifi cloud services | |
CN105092961A (en) | Ammeter system using mobile terminal for positioning | |
CN103901269A (en) | Electric quantity measuring device facilitating switching of wiring mode | |
CN102722167A (en) | Integrated controller for floor | |
CN201788584U (en) | Remote management device for large consumer electricity meters | |
CN206505112U (en) | A kind of multifunctional electric meter | |
CN2798103Y (en) | Network intelligent electric energy quantity monitor | |
CN209542680U (en) | A kind of electric instrument | |
CN204479646U (en) | A kind of equipment control electronic tag current detection circuit | |
CN201681099U (en) | Multifunctional electric energy meter | |
CN208061339U (en) | Single-phase double-loop guide rail type prepayment electric energy meter with remained capacity function | |
CN207302324U (en) | A kind of electric power data acquisition system based on bandwidth carrier | |
CN105652052A (en) | Using method of watt hour meter based on staircase cleanliness analysis | |
CN102340518A (en) | Multifunctional remote management terminal | |
CN201885822U (en) | Acquisition module for configurable thermal resistance | |
CN208125825U (en) | Wireless telemetering phase checking device | |
CN204359838U (en) | Electric power specially becomes large user's electricity anti-theft system | |
CN202330553U (en) | Intelligent electronic electric energy meter | |
CN202735799U (en) | Integrated controller for floor | |
CN202495140U (en) | Intelligent electric-meter remote control device based on internet of things for | |
CN206400069U (en) | A kind of electric system Internet of Things detector | |
CN206848361U (en) | Direct access three-dimentional measurement electric energy meter | |
CN216312755U (en) | But remote monitoring's vary voltage cabinet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110406 Termination date: 20130719 |