CN201785162U - Pull pole hoist for arc gird - Google Patents

Pull pole hoist for arc gird Download PDF

Info

Publication number
CN201785162U
CN201785162U CN2010205231724U CN201020523172U CN201785162U CN 201785162 U CN201785162 U CN 201785162U CN 2010205231724 U CN2010205231724 U CN 2010205231724U CN 201020523172 U CN201020523172 U CN 201020523172U CN 201785162 U CN201785162 U CN 201785162U
Authority
CN
China
Prior art keywords
pulley
wirerope
pull pole
montant
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205231724U
Other languages
Chinese (zh)
Inventor
李汇
储勤洲
陈俊堂
赵青杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China No15 Metallurgical Construction Co Ltd
Original Assignee
China No15 Metallurgical Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China No15 Metallurgical Construction Co Ltd filed Critical China No15 Metallurgical Construction Co Ltd
Priority to CN2010205231724U priority Critical patent/CN201785162U/en
Application granted granted Critical
Publication of CN201785162U publication Critical patent/CN201785162U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to an improvement of a steel structure construction hoisting machine, and particularly discloses a pull pole hoist for an arc gird. The pull pole hoist comprises a pull pole and a pulley block; the pulley block is connected with a cantilever plate of the pull pole through a connecting plate; a hook is also connected with the lower end of the pulley block; a hoisting rope of the pull pole hoist is connected with a coiling drum of a hoisting machine through the pulley block and a coil of a bend pulley; and the hoisting machine is anchored on a foundation through wire cables. The pull pole hoist is characterized in that the pull pole comprises a vertical post, an upper sealing plate, a lower closing plate, an upper wire cable, a lower wire cable, the cantilever plate, a supporting plate and the bend pulley; the sealing plates are welded at the upper and lower ends of the vertical post; the lower sealing plate is arranged on a base and anchored on the foundation through the lower wire cable; the vertical post is also provided with the supporting plate; the bend pulley is connected with the end part of the supporting plate; wire cable attaching lugs are welded at four corners of an upper end plate; and four wire cables are also connected with the four corners and respectively anchored on the foundation in four different directions. The pull pole hoist solves various problems during the arc grid construction hoisting, and is mainly used for the improvement of the steel structure construction hoisting machine.

Description

A kind of arch rack construction dead man loop wheel machine
(1). technical field: the utility model relates to the transformation of Construction of Steel Structure lifting facility, especially a kind of arch rack construction dead man loop wheel machine.
(2). background technology: the prior art of large-scale arch rack Construction of Steel Structure lifting is: A. high altitude bulk method: set up full shop scaffold on construction ground and carry out the component assembly construction; B. high-altitude sliding method: on slide rail, set up and movably assemble the fetal membrane frame and carry out mobile assembling construction; C: lift method: the arch rack that will assemble completion utilizes the installation that raises of hoisting crane or hydraulic lifting machine; The problem that above-mentioned construction method exists is: high-altitude method or high-altitude sliding method need be set up a large amount of scaffolds and construct, and have the high-altitude constructing operation, the construction cost height, and potential safety hazard is big, the difficult control of construction quality; Though lift method is at ground construction, the large-scale lifting appliance that needs more than two carries out work simultaneously, and the equipment construction occupancy expenses is higher.
(3). summary of the invention: the purpose of this utility model is exactly will solve the quality control on construction difficulty, the construction safety hidden danger that exist in the arch rack construction hoisting to reach the high problem of construction cost greatly, and a kind of arch rack construction dead man loop wheel machine is provided.
Concrete scheme of the present utility model is: a kind of arch rack construction dead man loop wheel machine, it has dead man and assembly pulley, described assembly pulley has fixed pulley and movable pulley, fixed pulley utilizes two connecting panels to be connected with the cantilever slab of dead man, movable pulley is connected with fixed pulley by the winding of hoisting cable, also is connected with suspension hook in the lower end of movable pulley; One end of described hoisting cable is captiveed joint with fixed pulley, and the other end of steel rope is connected with the reel of elevator unit through the winding of movable pulley, fixed pulley and changed course pulley, and described elevator unit utilizes wirerope and ground anchoring; It is characterized in that: described dead man by montant, up and down shrouding, go up wirerope, wirerope, cantilever slab, back plate and changed course pulley are formed down, described montant is to adopt rectangular tube or solid drawn pipe to make, two ends up and down at montant are welded with shrouding, the lower seal panel seat stands on the basis, and utilization is located at down following wirerope and ground anchoring near the montant in shrouding upper end, the symmetrical limit of wirerope also is provided with back plate under montant, is connected with the changed course pulley in the end of back plate; Four corners of described upper head plate are welded with the wirerope attaching lug, are connected with four on four attaching lugs
Last wirerope and towards four different directions respectively with the ground anchoring.
Principle of work of the present utility model is: the montant utilization of dead man loop wheel machine wirerope and ground anchoring up and down, the motor of elevator unit subtracts complete machine and drives the reel rotation, hoisting cable on the reel is under the effect of the tangential pulling force of reel, hoisting cable is promoting the hook lifting motion through the winding of changed course pulley, movable and fixed pulley group, realizes the workpiece lifting on the suspension hook.
The utility model is applied in the arch rack construction hoisting, and four dead man loop wheel machines are installed at the construction field (site), and four dead man loop wheel machines are along arch rack axis arranged in length and breadth, and with loop wheel machine wirerope and ground anchoring up and down; The arch rack is assembly unit completion one joint on the ground, and the arch rack that the dead man loop wheel machine will complete raises one section, realizes the sectional making of arch rack construction, the construction method of lifting and the whole installation that raises piecemeal; The utility model is through practice test, show have easy to operate, safe and reliable, steady quality, the duration is short and characteristics such as with low cost; The utility model quality control on construction difficulty, construction safety hidden danger that arch rack construction hoisting exists of having deblocked preferably reaches the high problem of construction cost greatly; The utility model also can be used for
Other large-scale steel structure construction hoisting engineering.
(4). description of drawings:
Fig. 1: the utility model structural representation;
Fig. 2: application note is arranged the scheme drawing 1(segmental hoisting stage);
Fig. 3: application note arranges that scheme drawing 2(integral body attaches together the stage);
Among the figure: 1-upward wirerope, 2-following wirerope, 3-up and down shroudings, 4-cantilever slab, 5-connecting panel, 6-fixed pulley, 7-movable pulley, 8-suspension hook, 9-montant, 10-back plate, 11-changed course pulley, 12-hoisting cable, 13-elevator unit, 14-dead man, 15-arch rack column, 16-rack pull bar, 17-completion rack, 18--pre-installs rack.
(5). the specific embodiment:
Embodiment (seeing Fig. 1 for details): a kind of arch rack construction dead man loop wheel machine, it has dead man 14 and assembly pulley, described assembly pulley has fixed pulley 6 and movable pulley 7, fixed pulley utilizes two connecting panels 5 to be connected with the cantilever slab 4 of dead man 14, movable pulley 7 is connected with fixed pulley 6 by the winding of hoisting cable 12, also is connected with suspension hook 8 in the lower end of movable pulley 7; One end of described hoisting cable 12 is captiveed joint with fixed pulley, the other end of steel rope is connected with the reel of elevator unit 13 through the winding of movable pulley 7, fixed pulley 6 and changed course pulley 11, described elevator unit 13 usefulness wireropes and ground anchoring, elevator unit 13 hoisting capacities in the present embodiment are five tons; Particularly: described dead man 14 by montant 9, up and down shrouding 3, go up wirerope 1, wirerope 2, cantilever slab 4, back plate 10 and changed course pulley 11 are formed down, described montant 9 is to adopt rectangular tube or solid drawn pipe to make, present embodiment is to adopt rectangular tube, its specification is the 325*325(millimeter), thickness is the 10(millimeter), bar length is 15.9 (rice); Two ends up and down at montant 9 are welded with shrouding 3,3 of following shroudings stand on the basis, and utilize the following wirerope 2 and ground anchoring that is located at down near the montant in shrouding upper end, and also be provided with back plate 10 on the symmetrical limit of 9 times wireropes of montant, be connected with changed course pulley 11 in the end of back plate 10; Four corners of described upper head plate 3 are welded with the wirerope attaching lug, are connected with four wireropes 1 and towards four on four attaching lugs
Different directions respectively with the ground anchoring.
Application note (sees Fig. 2 for details, Fig. 3): the utility model is applied to certain thermal power plant's coal bunker arch rack construction hoisting engineering, four dead man 14 loop wheel machines are installed at the construction field (site), four dead man 14 loop wheel machines are installed the axis symmetric arrangement along the arch rack, the suspension hook of four loop wheel machines is fastened four suspension centres of completion arch rack 17 respectively, and will encircle rack 17 and rise to suitable height and carry out assembling construction, treat prepackage arch rack and completion encircle the rack assembly unit be connected finish after, four loop wheel machines lift by crane synchronously, the arch rack of integral body completion is increased to setting height(from bottom), the arch rack is connected with four rack columns 15, has finished the lifting work of arch rack.

Claims (1)

1. an arch rack is constructed and is used the dead man loop wheel machine, it has dead man and assembly pulley, described assembly pulley has fixed pulley and movable pulley, fixed pulley utilizes two connecting panels to be connected with the cantilever slab of dead man, movable pulley is connected with fixed pulley by the winding of hoisting cable, also is connected with suspension hook in the lower end of movable pulley; One end of described hoisting cable is captiveed joint with fixed pulley, and the other end of steel rope is connected with the reel of elevator unit through the winding of movable pulley, fixed pulley and changed course pulley, and described elevator unit utilizes wirerope and ground anchoring; It is characterized in that: described dead man by montant, up and down shrouding, go up wirerope, wirerope, cantilever slab, back plate and changed course pulley are formed down, described montant is to adopt rectangular tube or solid drawn pipe to make, two ends up and down at montant are welded with shrouding, the lower seal panel seat stands on the basis, and utilization is located at down following wirerope and ground anchoring near the montant in shrouding upper end, the symmetrical limit of wirerope also is provided with back plate under montant, is connected with the changed course pulley in the end of back plate; Four corners of described upper head plate are welded with the wirerope attaching lug, on four attaching lugs, be connected with four wireropes and towards four different directions respectively with the ground anchoring.
CN2010205231724U 2010-09-09 2010-09-09 Pull pole hoist for arc gird Expired - Fee Related CN201785162U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205231724U CN201785162U (en) 2010-09-09 2010-09-09 Pull pole hoist for arc gird

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205231724U CN201785162U (en) 2010-09-09 2010-09-09 Pull pole hoist for arc gird

Publications (1)

Publication Number Publication Date
CN201785162U true CN201785162U (en) 2011-04-06

Family

ID=43817137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205231724U Expired - Fee Related CN201785162U (en) 2010-09-09 2010-09-09 Pull pole hoist for arc gird

Country Status (1)

Country Link
CN (1) CN201785162U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352576A (en) * 2013-07-24 2013-10-16 山东锦城钢结构有限责任公司 Externally expanding, assembling, converting and lifting method for medium/small span steel structure roof net rack
CN104071720A (en) * 2014-07-01 2014-10-01 葛洲坝集团第二工程有限公司 In-tunnel turn-over method of super-large diameter penstock
CN106088609A (en) * 2016-08-29 2016-11-09 安徽马钢工程技术集团有限公司 A kind of integral lifting method of large span steel structure vestibule
CN106185677A (en) * 2016-08-29 2016-12-07 安徽马钢工程技术集团有限公司 A kind of hoisting mechanism and the jacking system of large-sized structural parts based on this mechanism
CN106703420A (en) * 2017-02-13 2017-05-24 山西宏厦建筑工程第三有限公司 Large-span ball joint spherical wire frame cluster rocker hoisting construction method
CN110127550A (en) * 2019-05-23 2019-08-16 广州市机电安装有限公司 A kind of hanging method of super high-rise building tubing
CN110924531A (en) * 2019-11-14 2020-03-27 绍兴文理学院 Device suitable for stretch-draw overall structure construction

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352576A (en) * 2013-07-24 2013-10-16 山东锦城钢结构有限责任公司 Externally expanding, assembling, converting and lifting method for medium/small span steel structure roof net rack
CN104071720A (en) * 2014-07-01 2014-10-01 葛洲坝集团第二工程有限公司 In-tunnel turn-over method of super-large diameter penstock
CN106088609A (en) * 2016-08-29 2016-11-09 安徽马钢工程技术集团有限公司 A kind of integral lifting method of large span steel structure vestibule
CN106185677A (en) * 2016-08-29 2016-12-07 安徽马钢工程技术集团有限公司 A kind of hoisting mechanism and the jacking system of large-sized structural parts based on this mechanism
CN106703420A (en) * 2017-02-13 2017-05-24 山西宏厦建筑工程第三有限公司 Large-span ball joint spherical wire frame cluster rocker hoisting construction method
CN106703420B (en) * 2017-02-13 2018-11-13 山西宏厦建筑工程第三有限公司 Large span ball node Reticulated dome group's dead man lifting construction engineering method
CN110127550A (en) * 2019-05-23 2019-08-16 广州市机电安装有限公司 A kind of hanging method of super high-rise building tubing
CN110924531A (en) * 2019-11-14 2020-03-27 绍兴文理学院 Device suitable for stretch-draw overall structure construction
CN110924531B (en) * 2019-11-14 2020-12-25 绍兴文理学院 Device suitable for stretch-draw overall structure construction

Similar Documents

Publication Publication Date Title
CN201785162U (en) Pull pole hoist for arc gird
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN101537976B (en) Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN103832932B (en) Prestressed stretch-draw hydraulic jack suspention mobile device
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN102786004B (en) Integrally moving on-load hydraulic lifting system without mooring rope and lifting method
CN101618835B (en) Hoisting platform capable of being lifted and disassembled and application method thereof
CN202785364U (en) Movable dual-door-type mast hoisting device
CN202704861U (en) Special lifting device for generator stator
CN203269405U (en) Hoisting device for mounting side plates and upright columns of gas cabinet
CN205932929U (en) Large power supply equipment fixing is with hoist and mount framework
CN202989935U (en) Simple device for erecting or dismantling steel braces of subway foundation pits
CN103288002A (en) Simple combination portal upper-air heavy-article hoisting device
CN201850076U (en) Gate-shaped stand rod hoist of contact network
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN106185677A (en) A kind of hoisting mechanism and the jacking system of large-sized structural parts based on this mechanism
CN103375022A (en) Multifunctional movable-rail attachment lifting scaffold
CN201556864U (en) Hoisting bracket for 110kV disconnector
CN202767492U (en) Multifunctional moving rail-attached lifting scaffold
CN202643086U (en) Hoisting tool of hydroxylation reactor
CN115818458A (en) Standard knot assembling and disassembling system and operation method
CN103375029B (en) Prestressed dome lifting cantilever crane
CN215755931U (en) Large transformer hoisting equipment in factory building
CN102372228A (en) Translational installation method for large-span crane beam
CN201645413U (en) Simple gin-pole mechanism for demolishing internal climbing tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110406

Termination date: 20160909

CF01 Termination of patent right due to non-payment of annual fee