CN201770964U - Front connecting device for heavy-duty snow sweeper - Google Patents

Front connecting device for heavy-duty snow sweeper Download PDF

Info

Publication number
CN201770964U
CN201770964U CN2010201984556U CN201020198455U CN201770964U CN 201770964 U CN201770964 U CN 201770964U CN 2010201984556 U CN2010201984556 U CN 2010201984556U CN 201020198455 U CN201020198455 U CN 201020198455U CN 201770964 U CN201770964 U CN 201770964U
Authority
CN
China
Prior art keywords
assembly
junction plate
plate assembly
connecting plate
rectangular tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201984556U
Other languages
Chinese (zh)
Inventor
苑立宽
杨灿辉
陈增合
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Heavy Duty Truck Group Jinan Power Co Ltd
China National Heavy Duty Truck Group Taian Wuyue Special Vehicle Co Ltd
Original Assignee
China National Heavy Duty Truck Group Jinan Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Heavy Duty Truck Group Jinan Power Co Ltd filed Critical China National Heavy Duty Truck Group Jinan Power Co Ltd
Priority to CN2010201984556U priority Critical patent/CN201770964U/en
Application granted granted Critical
Publication of CN201770964U publication Critical patent/CN201770964U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Body Structure For Vehicles (AREA)

Abstract

The utility model discloses a front connecting device for a heavy-duty snow sweeper. The device comprises a left connecting plate assembly, a right connecting plate assembly, a first connecting beam assembly and a second connecting beam assembly, wherein the left connecting plate assembly and the right connecting plate assembly are rigidly connected to both sides of the front end of a chassis frame respectively; and under overhead view, the first connecting beam assembly and the second connecting beam assembly are rigidly connected between the left connecting plate assembly and the right connecting plate assembly front and back. The device has the advantages that: the left and right connecting plate assemblies are fixed with the front end of the chassis frame and the first connecting beam assembly is fixed between the left and right connecting plate assemblies, so that a bumper is reinforced and fixed; the second connecting beam assembly is fixed at the front ends of the left and right connecting plate assemblies, so that connection accuracy and intensity are ensured, the entire connection intensity is ensured and the requirement of the snow sweeper is met; and the device has a simple integral structure and is convenient to manufacture and process.

Description

Linkage before the heavy snow removing vehicle
Technical field
The utility model relates to the preceding linkage of a kind of heavy snow removing vehicle, is used to connect snow removing vehicle front end shovel snow equipment and chassis frame, belongs to heavy-duty car matching component technical field.
Background technology
The demand of the heavy snow removing vehicle of present domestic special use is increasing, but mostly adopts import chassis and snow removing equipment, the cost height, and maintenance is inconvenient, wastes time and energy.With the development of car China heavy-duty car level, the level on homemade heavy-duty car chassis has had and has increased substantially, for special-purpose snow removing vehicle production domesticization provides condition.Because Shovelling appts weight is big and require control accuracy, and is therefore also very high to the requirement of its linkage.
The utility model content
The technical problems to be solved in the utility model has provided linkage before a kind of heavy snow removing vehicle, has not only guaranteed bonding strength, and simple in structure, make easy to process.
In order to solve the problems of the technologies described above, the utility model adopts following technical proposals:
Linkage before a kind of heavy snow removing vehicle, comprise that left junction plate assembly, right junction plate assembly, first connect the crossbeam assembly and be connected the crossbeam assembly with second, described left junction plate assembly, right junction plate assembly are rigidly connected in chassis frame front end both sides respectively, from overlooking direction, the described first connection crossbeam assembly, second is rigidly connected between left junction plate assembly and the right junction plate assembly before and after connecting the crossbeam assembly.
Among the utility model embodiment, described left junction plate assembly and right junction plate assembly are symmetrical structure, include bending plate and the stiffener that is arranged on the bending plate outside.
Among the utility model embodiment, described first connects the crossbeam assembly comprises the first rectangular tube beam, is positioned at first junction plate at the first rectangular tube beam two ends and is positioned at the rectangular tube beam and the reinforcing rib of junction plate junction.
Among the utility model embodiment, described second connects second junction plate that the crossbeam assembly comprises the second rectangular tube beam, is positioned at the second rectangular tube beam two ends.
Among the utility model embodiment, described first connects crossbeam assembly inboard is provided with nut.
Among the utility model embodiment, described left junction plate assembly and right junction plate assembly integral are the horn-like chassis frame front end that is arranged on.
The beneficial effects of the utility model:
Left and right junction plate assembly and chassis frame front end are fixed, the first connection crossbeam assembly plays the effect that strengthens and fixes bumper in the middle of being fixed to left and right junction plate assembly, the second connection crossbeam assembly is fixed to left and right junction plate assembly front end and has guaranteed connection precision and intensity, integral body has guaranteed bonding strength, satisfied the requirement of snow removing vehicle, overall structure is simple, manufacturing is easy to process.
Description of drawings
Fig. 1 looks schematic diagram for the left side of left junction plate assembly;
Fig. 2 looks schematic diagram for the master of left junction plate assembly;
Fig. 3 looks schematic diagram for the right side of left junction plate assembly;
Fig. 4 is the schematic perspective view of left junction plate assembly;
Fig. 5 is the schematic perspective view of right junction plate assembly;
Fig. 6 looks schematic diagram for the left side of right junction plate assembly;
Fig. 7 looks schematic diagram for the master of right junction plate assembly;
Fig. 8 looks schematic diagram for the right side of right junction plate assembly;
Fig. 9 is the main schematic diagram of the first connection crossbeam assembly;
The specific embodiment
Figure 10 is that schematic diagram is looked on the left side of the first connecting cross beam assembly;
Figure 11 is the schematic perspective view of the first connecting cross beam assembly;
Figure 12 is that the master of the second connecting cross beam assembly looks schematic diagram;
Figure 13 is that schematic diagram is looked on the left side of the second connecting cross beam assembly;
Figure 14 is the schematic perspective view of the second connecting cross beam assembly;
Figure 15 jockey master looks schematic diagram;
Figure 16 jockey schematic top plan view;
Schematic diagram is looked on Figure 17 jockey left side;
Figure 18 jockey schematic three dimensional views;
Among the figure 1, left connecting plate assembly, 2, right connecting plate assembly, 3, chassis frame, 4, the first connecting cross beam assembly, 5, the second connecting cross beam assembly, 6, bending plate, 7, stiffener, 4-1, nut, 4-2, first connecting plate, 4-3, reinforcement, 4-4, the first rectangular tube beam, 5-1, the second rectangular tube beam, 5-2, second connecting plate.
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail, following explanation only is exemplary, does not limit protection domain of the present utility model.
With reference to the accompanying drawings 15,16,17,18, linkage before a kind of heavy snow removing vehicle, comprise that left junction plate assembly 1, right junction plate assembly 2, first connects crossbeam assembly 4 and be connected crossbeam assembly 5 with second, described left junction plate assembly 1, right junction plate assembly 2 are connected in chassis frame 3 front end both sides by bolt respectively, from overlooking direction, the described first connection crossbeam assembly 4, second connects crossbeam assembly 5 front and back and is connected between left junction plate assembly 1 and the right junction plate assembly 2 by bolt.
With reference to the accompanying drawings 1,2,3,4,5,6,7,8,18, described left junction plate assembly 1 and right junction plate assembly 2 are symmetrical structure, include bending plate 6 and are arranged on the stiffener 7 in bending plate 6 outsides.
With reference to the accompanying drawings 9,10,11, described first connects crossbeam assembly 4 comprises the first rectangular tube beam 4-4, be positioned at the first junction plate 4-2 and the reinforcing rib 4-3 that is positioned at rectangular tube beam 4-4 and junction plate 4-2 junction at the first rectangular tube beam 4-4 two ends, cut the described first connection crossbeam assembly 4 inboards and be provided with nut 4-1, can be with all the other outside connections by nut 4-1 with bolt, consider and implement convenient and processing cost, between each parts by being welded together, consider easy for installationly, have a plurality of installing holes that differ in size on the described first rectangular tube beam 4-4 and the first junction plate 4-2.
With reference to the accompanying drawings 12,13,14, described second connects the second junction plate 5-2 that crossbeam assembly 5 comprises the second rectangular tube beam 5-1, is positioned at the second rectangular tube beam 5-1 two ends, consider and implement convenient and processing cost, between each parts by being welded together, consider easy for installationly, have a plurality of installing holes that differ in size on the described second rectangular tube beam 5-1 and the second junction plate 5-2.
Described left junction plate assembly 1 and right junction plate assembly 2 integral body are horn-like chassis frame 3 front ends that are arranged on.
Basic principle of the present utility model and advantage have more than been described.The utility model is not restricted to the described embodiments, in the prerequisite that does not break away from the utility model scope, those skilled in the art can do many changes and improvements as required, and the second rectangular tube beam 5-1 and the second junction plate 5-2 can be by being processed into one after casting or the bending as described; The first rectangular tube beam 4-4 and the second rectangular tube beam 5-1 utilize thick steel plate to replace, and protection domain of the present invention should be defined by appending claims and equivalent thereof.

Claims (6)

1. linkage before the heavy snow removing vehicle, it is characterized in that: comprise that left junction plate assembly (1), right junction plate assembly (2), first connect crossbeam assembly (4) and be connected crossbeam assembly (5) with second, described left junction plate assembly (1), right junction plate assembly (2) are rigidly connected in chassis frame (3) front end both sides respectively, from overlooking direction, the described first connection crossbeam assembly (4), second is rigidly connected between left junction plate assembly (1) and the right junction plate assembly (2) before and after connecting crossbeam assembly (5).
2. according to linkage before the described heavy snow removing vehicle of claim 1, it is characterized in that: described left junction plate assembly (1) and right junction plate assembly (2) are symmetrical structure, include bending plate (6) and are arranged on the stiffener (7) in bending plate (6) outside.
3. according to linkage before the described heavy snow removing vehicle of claim 1, it is characterized in that: described first connects crossbeam assembly (4) comprises the first rectangular tube beam (4-4), is positioned at first junction plate (4-2) at first rectangular tube beam (4-4) two ends and is positioned at rectangular tube beam (4-4) and the reinforcing rib (4-3) of junction plate (4-2) junction.
4. according to linkage before the described heavy snow removing vehicle of claim 1, it is characterized in that: described second connects second junction plate (5-2) that crossbeam assembly (5) comprises the second rectangular tube beam (5-1), is positioned at second rectangular tube beam (5-1) two ends.
5. according to linkage before any described heavy snow removing vehicle of claim 1 to 4, it is characterized in that: described first connects crossbeam assembly (4) inboard is provided with nut (4-1).
6. according to linkage before any described heavy snow removing vehicle of claim 1 to 4, it is characterized in that: described left junction plate assembly (1) and right junction plate assembly (2) integral body are horn-like chassis frame (3) front end that is arranged on.
CN2010201984556U 2010-05-21 2010-05-21 Front connecting device for heavy-duty snow sweeper Expired - Fee Related CN201770964U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201984556U CN201770964U (en) 2010-05-21 2010-05-21 Front connecting device for heavy-duty snow sweeper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201984556U CN201770964U (en) 2010-05-21 2010-05-21 Front connecting device for heavy-duty snow sweeper

Publications (1)

Publication Number Publication Date
CN201770964U true CN201770964U (en) 2011-03-23

Family

ID=43750807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201984556U Expired - Fee Related CN201770964U (en) 2010-05-21 2010-05-21 Front connecting device for heavy-duty snow sweeper

Country Status (1)

Country Link
CN (1) CN201770964U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900046A (en) * 2012-09-30 2013-01-30 常州市德思特机械有限公司 Snow sweeper
KR20180015387A (en) * 2016-08-03 2018-02-13 주식회사 자동기 Mounting Device, snowplow removable device including the same and the assebling method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900046A (en) * 2012-09-30 2013-01-30 常州市德思特机械有限公司 Snow sweeper
KR20180015387A (en) * 2016-08-03 2018-02-13 주식회사 자동기 Mounting Device, snowplow removable device including the same and the assebling method thereof
KR102105441B1 (en) * 2016-08-03 2020-04-28 주식회사 자동기 Mounting Device, snowplow removable device including the same and the assebling method thereof

Similar Documents

Publication Publication Date Title
CN103101574A (en) Light weight bus frame
CN201770964U (en) Front connecting device for heavy-duty snow sweeper
CN203095403U (en) Vehicle hopper lifting frame
CN202249015U (en) Vehicle carrying plate
CN213681779U (en) Road and bridge crack reinforced structure
CN202935426U (en) Electric field vehicle frame
CN102501794B (en) A kind of concrete mixer truck
CN205035758U (en) Snow removing shovel connecting device
CN201305086Y (en) Variable cross-section big-camber beam frame structure
CN202728340U (en) Installing and supporting mechanism of vehicle
CN203698414U (en) Fabricated cross beam structure
CN202643051U (en) Lift car bottom
CN203222033U (en) Cross beam assembly for full trailer
CN202243674U (en) Traction transverse beam assembly for heavy truck
CN202345417U (en) Instrument table assembly
CN207156921U (en) Expansion tank support
CN207002186U (en) A kind of material towing device
CN206589985U (en) A kind of heavy type traction fender
CN110949511A (en) Novel electric ferry vehicle frame structure
CN203255265U (en) Car floor reinforcing plate
CN203567808U (en) Assembled type slanting assembly of mixer truck
CN201637474U (en) Modularized electronic truck scale body with separated driveways
CN201722047U (en) Moving pavement pedal skeleton enclosure frame
CN204750321U (en) Passenger train cabin body and passenger train
CN203528603U (en) Disconnected type snow sweeper frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110323

Termination date: 20150521

EXPY Termination of patent right or utility model