CN201750222U - Intelligent field monitoring system for large-scale transformer - Google Patents
Intelligent field monitoring system for large-scale transformer Download PDFInfo
- Publication number
- CN201750222U CN201750222U CN2010202780715U CN201020278071U CN201750222U CN 201750222 U CN201750222 U CN 201750222U CN 2010202780715 U CN2010202780715 U CN 2010202780715U CN 201020278071 U CN201020278071 U CN 201020278071U CN 201750222 U CN201750222 U CN 201750222U
- Authority
- CN
- China
- Prior art keywords
- transformer
- control system
- field control
- transformer terminal
- terminal case
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 24
- 230000005540 biological transmission Effects 0.000 claims description 4
- 239000000835 fiber Substances 0.000 claims description 4
- 230000007613 environmental effect Effects 0.000 abstract 2
- 230000008439 repair process Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000008054 signal transmission Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202780715U CN201750222U (en) | 2010-07-30 | 2010-07-30 | Intelligent field monitoring system for large-scale transformer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202780715U CN201750222U (en) | 2010-07-30 | 2010-07-30 | Intelligent field monitoring system for large-scale transformer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201750222U true CN201750222U (en) | 2011-02-16 |
Family
ID=43584894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202780715U Expired - Fee Related CN201750222U (en) | 2010-07-30 | 2010-07-30 | Intelligent field monitoring system for large-scale transformer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201750222U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106768031A (en) * | 2016-12-06 | 2017-05-31 | 广东电网有限责任公司东莞供电局 | System and method for monitoring oil level and oil temperature of transformer |
CN107144573A (en) * | 2017-05-31 | 2017-09-08 | 成都亿伏科技有限公司 | Apply the monitor in multigroup string inverter of solar power station |
US10055781B2 (en) | 2015-06-05 | 2018-08-21 | Boveda Inc. | Systems, methods and devices for controlling humidity in a closed environment with automatic and predictive identification, purchase and replacement of optimal humidity controller |
US10909607B2 (en) | 2015-06-05 | 2021-02-02 | Boveda Inc. | Systems, methods and devices for controlling humidity in a closed environment with automatic and predictive identification, purchase and replacement of optimal humidity controller |
-
2010
- 2010-07-30 CN CN2010202780715U patent/CN201750222U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10055781B2 (en) | 2015-06-05 | 2018-08-21 | Boveda Inc. | Systems, methods and devices for controlling humidity in a closed environment with automatic and predictive identification, purchase and replacement of optimal humidity controller |
US10909607B2 (en) | 2015-06-05 | 2021-02-02 | Boveda Inc. | Systems, methods and devices for controlling humidity in a closed environment with automatic and predictive identification, purchase and replacement of optimal humidity controller |
CN106768031A (en) * | 2016-12-06 | 2017-05-31 | 广东电网有限责任公司东莞供电局 | System and method for monitoring oil level and oil temperature of transformer |
CN107144573A (en) * | 2017-05-31 | 2017-09-08 | 成都亿伏科技有限公司 | Apply the monitor in multigroup string inverter of solar power station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202018607U (en) | Temperature intelligent monitoring system for digital transformer | |
CN201750222U (en) | Intelligent field monitoring system for large-scale transformer | |
CN104242472B (en) | A kind of railway station low buckling distribution intelligent monitor system | |
CN101776716B (en) | Line material mechanical &electrical integration testing machine and dedicated tensile test stand thereof | |
CN204807982U (en) | Distributed environment monitoring and protection system based on cloud calculates | |
CN201654535U (en) | Central control device of multiple comprehensive environment vibration test system | |
CN201438379U (en) | Remote alarm threshold modification system | |
CN102437649A (en) | Intelligent on-site monitoring system for large-scale transformer | |
CN103529759B (en) | A kind of scene supply intelligent observing and controlling server | |
CN202276196U (en) | Intelligent monitoring terminal device of intelligent switchhouse | |
CN208737330U (en) | A kind of wisdom grain depot grain storage centralized control system based on fiber optic network | |
CN205212551U (en) | Internet of things platform electric power monitored control system | |
CN202393811U (en) | On-line monitoring apparatus for lightning arrester for protecting series compensation capacitor | |
CN200956100Y (en) | General data collector | |
CN203275952U (en) | Visual remote data monitoring system based on Internet of things | |
CN207443049U (en) | Electric operating on-site supervision hand-held set | |
CN201725210U (en) | Analog input device for DCS system | |
CN202353178U (en) | Universal protector | |
CN201749061U (en) | Line material electromechanical integration tester and special tensile test rack thereof | |
CN220206739U (en) | Blast furnace blast temperature and humidity monitoring system | |
CN204191049U (en) | Modularization human-machine interaction data acquisition terminal | |
CN205104999U (en) | Mechatronic intelligence monitoring system | |
CN209312219U (en) | A kind of quick transmission devices of ONU | |
CN101126924A (en) | Electronic cam controller | |
CN201892648U (en) | Wireless-transmission intelligent on-line monitoring system for density and micro-water of SF6 (sulfur hexafluoride) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Free format text: FORMER OWNER: STATE GRID OPERATION CO., LTD. SHANGHAI SUPERHIGH-VOLTAGE MANAGEMENT OFFICE Effective date: 20130729 Owner name: STATE GRID OPERATION CO., LTD. SHANGHAI SUPERHIGH- Effective date: 20130729 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 201615 SONGJIANG, SHANGHAI TO: 100033 XICHENG, BEIJING |
|
TR01 | Transfer of patent right |
Effective date of registration: 20130729 Address after: 100033 No. 86, Xicheng District, Beijing, Chang'an Avenue Patentee after: State Grid Corporation of China Patentee after: State Grid Operation Co., Ltd. Shanghai Superhigh-Voltage Management Office Address before: 201615, room 339, 1101 Ledu Road, Shanghai, Songjiang District Patentee before: State Grid Operation Co., Ltd. Shanghai Superhigh-Voltage Management Office |
|
ASS | Succession or assignment of patent right |
Owner name: SHANGHAI MANAGEMENT OFFICE OF GRID OPERATION BRANC Free format text: FORMER OWNER: STATE GRID OPERATION CO., LTD. SHANGHAI SUPERHIGH-VOLTAGE MANAGEMENT OFFICE Effective date: 20150515 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20150515 Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Patentee after: State Grid Corporation of China Patentee after: Shanghai branch of China National Power Grid Corp operation branch Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Patentee before: State Grid Corporation of China Patentee before: State Grid Operation Co., Ltd. Shanghai Superhigh-Voltage Management Office |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110216 Termination date: 20190730 |