CN201739772U CN 201020294376 CN201020294376U CN201739772U CN 201739772 U CN201739772 U CN 201739772U CN 201020294376 CN201020294376 CN 201020294376 CN 201020294376 U CN201020294376 U CN 201020294376U CN 201739772 U CN201739772 U CN 201739772U
Authority
CN
China
Prior art keywords
slurry
air cushion
slush
cabin
loop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201020294376
Other languages
Chinese (zh)
Inventor
张宁川
王杜娟
杨爱军
曾垂刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Equipment Group Technology Service Co Ltd
Original Assignee
China Railway Tunneling Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunneling Equipment Co Ltd filed Critical China Railway Tunneling Equipment Co Ltd
Priority to CN 201020294376 priority Critical patent/CN201739772U/en
Application granted granted Critical
Publication of CN201739772U publication Critical patent/CN201739772U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a slush shield slurry conveying system enhanced slush cabin and air cushion cabin circulation flow device, comprising an original slurry feeding loop, an air cushion cabin and a slush cabin connected to the slurry feeding loop, and an original slurry returning loop which is fixed on the air cushion cabin separating plate and is connected to the air cushion cabin. The utility model is characterized in that an assisting circulation system, a new slush loop is extra disposed in the shield host; the new slurry loop comprises a slurry absorbing pipe, a slurry pump set connected to the slurry absorbing pipe, and a slurry return pipe connected to the outlet of the slurry pump set. The utility model has advantages of enhancing the flow velocity of slurry channel in the shield host slurry slush cabin and the air cushion cabin bottom; improving the ability of carrying large-sized pebbles; preventing the problem of dreg accumulation in the slush cabin and the air cushion cabin bottom when the large-sized pebble layer is being excavated; greatly increasing the use range of slush shields; reducing the accumulation of sandy soil in the inhalation pipe of the slurry pump in large-sized grit layer; reducing the fault rate of a device.

Description

The slurry shield slurry transporting system strengthens the device of muddy water storehouse and air cushion storehouse circulation flow
Technical field
The utility model belongs to gas cushion type mud water shield slurry transporting system circulation flow techniques field, tunnel, main a kind of new muddy water storehouse and the air cushion storehouse circulation flux enhancement system of proposing is specially the device that the slurry shield slurry transporting system strengthens muddy water storehouse and air cushion storehouse circulation flow.
Background technique
The excavation quarrel soil that is used for the modern slurry shield of tunnel piercing adopts the slurry transportation system to send outside the tunnel, the flow of mud mainly determines according to the quarrel soil amount that excavation progress needs carry, again according to flow and carry the diameter that the required flow velocity of quarrel soil is determined pipeline in the system.Because the flow velocity of mud in pipeline is enough, so carrying of quarrel soil do not have problems in pipeline.But because the muddy water storehouse (cutterhead place bin) and the air cushion storehouse cross dimension relative duct size diameter of shield structure are much bigger, mud reduces a lot at the flow velocity of these two bins, when big particle diameter cobble or broken sillar were contained in the stratum of tunnel excavation, the mud that flow velocity is very low was difficult to carry these big particle diameter pieces and flows through these two bins bottoms excessively to suction inlets of pipeline from cutterhead.The method that present slurry shield technology adopts is, prevent that by stir big particle diameter piece with the stirring rod of cutterhead rotation it is carried to bottom, air cushion storehouse in the accumulation of bottom, muddy water storehouse and with slurry flows, be provided with in bottom, air cushion storehouse simultaneously and wash away spout, clean slurry outside the tunnel after the process mud-water separation is when returning the shield structure, a part is used to wash away, and the big particle diameter piece of air cushion storehouse bottom is suspended and is carried to the suction inlet of pipeline with slurry flows.This technology is used for gravel stratum when excavation, because the gravel particle diameter is less, still be effectively, but when being used for pebble layer and excavating, effect is relatively poor.Big particle diameter piece often is deposited in this two bin bottoms, can not be carried by mud, often needs manually to enter bin and clears up.Because need band to press (air pressure caves in so that prevent the excavation face) warehouse entry operation, labor strength is big, easily suffers from hyperbarism, operating efficiency is low, and the processing time is long, has a strong impact on construction speed, the risk that exists the excavation face to cave in simultaneously.
How can provide a kind of is the science supporting facility of economic security again, strengthen shield structure main frame muddy water storehouse and air cushion storehouse bottom slurry channel flow velocity, improve the ability that mud carries big particle diameter cobble, avoiding muddy water storehouse and the long-pending problem of bottom, air cushion storehouse quarrel mound when big particle diameter pebble layer tunnels, has been a urgent problem.
Summary of the invention
In order to overcome above-mentioned deficiency of the prior art, the utility model provides a kind of mud auxiliary circulation system that strengthens shield structure main frame muddy water storehouse and air cushion storehouse foot passage mud speed rate, can strengthen shield structure main frame muddy water storehouse and air cushion storehouse bottom slurry channel flow velocity, improve the ability that mud carries big particle diameter cobble, avoid when big particle diameter pebble layer driving muddy water storehouse and bottom, the air cushion storehouse long-pending slurry shield slurry transporting system of quarrel mound to strengthen the device of muddy water storehouse and air cushion storehouse circulation flow.
The purpose of this utility model is achieved in that
The slurry shield slurry transporting system strengthens the device of muddy water storehouse and air cushion storehouse circulation flow, comprise original loop 1 of advancing to starch, with the air cushion storehouse 3 and the muddy water storehouse 4 that have slurry loop 1 into to be connected, and be fixed on the original overfall loop 2 that is connected with air cushion storehouse 3 on 3 dividing plates of air cushion storehouse, in shield structure main frame, set up an auxiliary circulation system, promptly newly add muddy water loop 5, newly add muddy water loop 5 and comprise pulp-absorbing pipe 5.1, and the slurry pump group 5.3 that is connected with pulp-absorbing pipe 5.1, the return pipe 5.4 that is connected with slurry pump group 5.3 delivery outlets;
Described pulp-absorbing pipe 5.1 is provided with pulp-absorbing pipe gate valve 5.2, and return pipe 5.4 is provided with return pipe gate valve 5.5; Pulp-absorbing pipe 5.1 connects and is extended down to behind pulp-absorbing pipe gate valves 5.2 backs behind the main frame rear portion on the supporting stand, is connected with the suction port of slurry pump group 5.3 on being installed in stand;
Being fixed on the dividing plate of air cushion storehouse of described pulp-absorbing pipe 5.1 is positioned at the top of the mud circulation plasma discharge suction inlet in original overfall loop 2 simultaneously;
Positive beneficial effect of the present utility model is: a kind of mud auxiliary circulation system that strengthens shield structure main frame muddy water storehouse and air cushion storehouse foot passage mud speed rate, strengthen shield structure main frame muddy water storehouse and air cushion storehouse bottom slurry channel flow velocity, improve the ability that mud carries big particle diameter cobble, avoid muddy water storehouse and the long-pending problem of bottom, air cushion storehouse quarrel mound when big particle diameter pebble layer tunnels.The increase of this covering device has improved the using scope of slurry shield greatly, reduces the accumulation at bigger grit layer slurry pump suction pipe place sand, the reduction breakdown rate.
Description of drawings
Figure is the schematic representation that the utility model slurry shield slurry transporting system strengthens muddy water storehouse and air cushion storehouse circulation flow.
Among the figure be: original advance to starch loop 1, original overfall loop 2, air cushion storehouse 3, muddy water storehouse 4, newly add muddy water loop 5, pulp-absorbing pipe 5.1, pulp-absorbing pipe gate valve 5.2, slurry pump group 5.3, return pipe 5.4,, return pipe gate valve 5.5 return pipe exhaust ports 5.6;
Embodiment;
Below in conjunction with accompanying drawing, the utility model is further described:
The slurry shield slurry transporting system strengthens the device of muddy water storehouse and air cushion storehouse circulation flow, comprise original loop 1 of advancing to starch, with the air cushion storehouse 3 and the muddy water storehouse 4 that have slurry loop 1 into to be connected, and be fixed on the original overfall loop 2 that is connected with air cushion storehouse 3 on 3 dividing plates of air cushion storehouse, in shield structure main frame, set up an auxiliary circulation system, promptly newly add muddy water loop 5, newly add muddy water loop 5 and comprise pulp-absorbing pipe 5.1, and the slurry pump group 5.3 that is connected with pulp-absorbing pipe 5.1, the return pipe 5.4 that is connected with slurry pump group 5.3 delivery outlets;
Described pulp-absorbing pipe 5.1 is provided with pulp-absorbing pipe gate valve 5.2, and return pipe 5.4 is provided with return pipe gate valve 5.5; Pulp-absorbing pipe 5.1 connects and is extended down to behind pulp-absorbing pipe gate valves 5.2 backs behind the main frame rear portion on the supporting stand, is connected with the suction port of slurry pump group 5.3 on being installed in stand;
Being fixed on the dividing plate of air cushion storehouse of described pulp-absorbing pipe 5.1 is positioned at the top of the mud circulation plasma discharge suction inlet in original overfall loop 2 simultaneously;
The utility model is a kind of mud auxiliary circulation system that strengthens shield structure main frame muddy water storehouse and air cushion storehouse foot passage mud speed rate, strengthen shield structure main frame muddy water storehouse and air cushion storehouse bottom slurry channel flow velocity, improve the ability that mud carries big particle diameter cobble, avoid muddy water storehouse and the long-pending problem of bottom, air cushion storehouse quarrel mound when big particle diameter pebble layer tunnels.The increase of this covering device has improved the using scope of slurry shield greatly, reduces the accumulation at bigger grit layer slurry pump suction pipe place sand, the reduction breakdown rate.
Above embodiment only is used to illustrate preferred implementation of the present utility model; but the utility model is not limited to above-mentioned mode of execution; in the ken that described field those of ordinary skill is possessed; any modification of being done within spirit of the present utility model and the principle, be equal to and substitute and improvement etc., it all should be encompassed within the technological scheme scope that the utility model asks for protection.

Claims (3)

1. the slurry shield slurry transporting system strengthens the device of muddy water storehouse and air cushion storehouse circulation flow, comprise original loop (1) of advancing to starch, with the air cushion storehouse (3) and muddy water storehouse (4) that have into slurry loop (1) to be connected, and be fixed on the original overfall loop (2) that is connected with air cushion storehouse (3) on the dividing plate of air cushion storehouse (3), it is characterized in that: in shield structure main frame, set up an auxiliary circulation system, promptly newly add muddy water loop (5), newly add muddy water loop (5) and comprise pulp-absorbing pipe (5.1), and the slurry pump group (5.3) that is connected with pulp-absorbing pipe (5.1), the return pipe (5.4) that is connected with slurry pump group (5.3) delivery outlet.
2. slurry shield slurry transporting system according to claim 1 strengthens the device of muddy water storehouse and air cushion storehouse circulation flow, it is characterized in that: described pulp-absorbing pipe (5.1) is provided with pulp-absorbing pipe gate valve (5.2), and return pipe (5.4) is provided with return pipe gate valve (5.5); Pulp-absorbing pipe (5.1) connects and to be extended down to behind pulp-absorbing pipe gate valve (5.2) back behind the main frame rear portion on the supporting stand, is connected with the suction port of slurry pump group (5.3) on being installed in stand.
3. slurry shield slurry transporting system according to claim 1 strengthens the device of muddy water storehouse and air cushion storehouse circulation flow, it is characterized in that: being fixed on the dividing plate of air cushion storehouse of described pulp-absorbing pipe (5.1) is positioned at the top of the mud circulation plasma discharge suction inlet in original overfall loop (2) simultaneously.
CN 201020294376 2010-08-17 2010-08-17 Slush shield slurry conveying system enhanced slush cabin and air cushion cabin circulation flow device Expired - Lifetime CN201739772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201020294376 CN201739772U (en) 2010-08-17 2010-08-17 Slush shield slurry conveying system enhanced slush cabin and air cushion cabin circulation flow device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201020294376 CN201739772U (en) 2010-08-17 2010-08-17 Slush shield slurry conveying system enhanced slush cabin and air cushion cabin circulation flow device

Publications (1)

Publication Number Publication Date
CN201739772U true CN201739772U (en) 2011-02-09

Family

ID=43555047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201020294376 Expired - Lifetime CN201739772U (en) 2010-08-17 2010-08-17 Slush shield slurry conveying system enhanced slush cabin and air cushion cabin circulation flow device

Country Status (1)

Country Link
CN (1) CN201739772U (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926763A (en) * 2012-09-21 2013-02-13 中铁隧道装备制造有限公司 Air cushion type slurry shield gas pressure adjusting system
CN104213833A (en) * 2013-06-03 2014-12-17 中国石油天然气集团公司 Horizontal directional drilling crossing construction method and horizontal directional drilling crossing drilling device
CN104863610A (en) * 2015-06-09 2015-08-26 中铁工程装备集团有限公司 Muddy water circulation system capable of being directly and indirectly controlled and control method
CN105065007A (en) * 2015-07-17 2015-11-18 中国铁建重工集团有限公司 Mud water circulation and stone crushing system for shield tunneling machine
CN105332711A (en) * 2015-11-11 2016-02-17 中国铁建重工集团有限公司 Slurry shield machine with slurry circulation system
CN106996295A (en) * 2017-05-10 2017-08-01 中铁隧道股份有限公司 Slurry balance shield mud circulating system and slurry balance shield
CN107542475A (en) * 2017-09-18 2018-01-05 广东华隧建设集团股份有限公司 A kind of forward and inverse cycle driving system for configuring disintegrating machine and case of quarrying
CN108194089A (en) * 2017-12-21 2018-06-22 中铁十六局集团北京轨道交通工程建设有限公司 A kind of slurry shield slurry loop circulation system
CN109209407A (en) * 2018-10-18 2019-01-15 上海隧道工程有限公司 Increase the coordinated allocation system and method for shield tunneling muddy water flow
CN110125129A (en) * 2019-06-20 2019-08-16 中铁工程装备集团有限公司 A kind of slurry shield pernicious gas collection device
CN112943289A (en) * 2021-02-08 2021-06-11 中国铁建重工集团股份有限公司 Slurry balance shield machine, slag discharge device and slag discharge method
CN114215535A (en) * 2021-12-13 2022-03-22 中铁工程装备集团有限公司 Slurry balance shield slurry circulation system

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926763A (en) * 2012-09-21 2013-02-13 中铁隧道装备制造有限公司 Air cushion type slurry shield gas pressure adjusting system
CN104213833A (en) * 2013-06-03 2014-12-17 中国石油天然气集团公司 Horizontal directional drilling crossing construction method and horizontal directional drilling crossing drilling device
CN104213833B (en) * 2013-06-03 2016-08-10 中国石油天然气集团公司 Pipeline Crossing by Horizontal Directional Drilling construction method and rig thereof
CN104863610A (en) * 2015-06-09 2015-08-26 中铁工程装备集团有限公司 Muddy water circulation system capable of being directly and indirectly controlled and control method
CN105065007A (en) * 2015-07-17 2015-11-18 中国铁建重工集团有限公司 Mud water circulation and stone crushing system for shield tunneling machine
CN105332711A (en) * 2015-11-11 2016-02-17 中国铁建重工集团有限公司 Slurry shield machine with slurry circulation system
CN106996295A (en) * 2017-05-10 2017-08-01 中铁隧道股份有限公司 Slurry balance shield mud circulating system and slurry balance shield
CN107542475A (en) * 2017-09-18 2018-01-05 广东华隧建设集团股份有限公司 A kind of forward and inverse cycle driving system for configuring disintegrating machine and case of quarrying
CN107542475B (en) * 2017-09-18 2020-02-07 广东华隧建设集团股份有限公司 Forward and reverse circulation tunneling system with crusher and quarrying box
CN108194089A (en) * 2017-12-21 2018-06-22 中铁十六局集团北京轨道交通工程建设有限公司 A kind of slurry shield slurry loop circulation system
CN109209407A (en) * 2018-10-18 2019-01-15 上海隧道工程有限公司 Increase the coordinated allocation system and method for shield tunneling muddy water flow
CN110125129A (en) * 2019-06-20 2019-08-16 中铁工程装备集团有限公司 A kind of slurry shield pernicious gas collection device
CN112943289A (en) * 2021-02-08 2021-06-11 中国铁建重工集团股份有限公司 Slurry balance shield machine, slag discharge device and slag discharge method
CN114215535A (en) * 2021-12-13 2022-03-22 中铁工程装备集团有限公司 Slurry balance shield slurry circulation system

Similar Documents

Publication Publication Date Title
CN201739772U (en) Slush shield slurry conveying system enhanced slush cabin and air cushion cabin circulation flow device
CN202325527U (en) Slurry shield mud conveying device
CN106089221B (en) A kind of dense mud shield-tunneling construction device and method suitable for sand-pebble layer
CN104879133B (en) Double-mode shield tunneling machine
CN109281685A (en) A kind of decompression type shield machine step by step
CN205977222U (en) Double mode shield constructs quick -witted structure
CN210370653U (en) Slag discharging system for integral starting of single ultra-deep shaft of double-line shield tunnel
CN207212341U (en) Suporting structure driving uses cutterhead flushing system in a kind of high viscosity mud stone
CN108442936B (en) Slag discharging shield machine for conveying belt
CN207363672U (en) A kind of slurry balance shield machine quarrying case apparatus
CN106437742A (en) Earth pressure balance shield construction uprush control device and method in water-rich surrounding rock
CN207048793U (en) A kind of decompression type shield machine step by step
CN208294531U (en) A kind of slag-tapping system and shield machine
CN109681201B (en) Negative pressure suction and foam catching and comprehensive action dust removing device
CN102146687A (en) Suction dredge pipeline reducing construction method
CN219241923U (en) Air slag carrying type slurry discharging device
CN206319885U (en) Earth pressure balanced shield, EPBS construction is prominent in a kind of rich water country rock gushes preventing and treating device
CN216305920U (en) Slurry shield circulation system with double crushers and double slurry discharge channels
CN110388229A (en) The pipeline of the double resources of coal-water in coal mining system
CN113863947A (en) Air cushion type slurry balance shield machine for solving problem of stagnant discharge and construction method thereof
CN212296374U (en) Slurry balance shield stone taking device
CN106121665B (en) The TBM and its slag tapping method of new mode of slagging tap
CN202249857U (en) Dust remover for mine
CN212225303U (en) Gas separator convenient for removing slag
CN107654236A (en) A kind of slurry balance shield machine quarrying case apparatus and its construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA RAILWAY MANUFACTURING EQUIPMENT GROUP CO., L

Free format text: FORMER NAME: CHINA RAILWAY TUNNELING EQUIPMENT CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 450048, Henan, Zhengzhou Province, 1405 East navigation road, CITIC Plaza, 4 floor, East

Patentee after: China Railway Manufacturing Equipment Group Co., Ltd.

Address before: 450048, Henan, Zhengzhou Province, 1405 East navigation road, CITIC Plaza, 4 floor, East

Patentee before: China Railway Tunneling Equipment Co., Ltd.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160421

Address after: 450016 No. sixth, 99 Avenue, Zhengzhou Economic Development Zone, Henan, China

Patentee after: CHINA RAILWAY ENGINEERING EQUIPMENT GROUP TECHNOLOGY SERVICE CO., LTD.

Address before: 450048, Henan, Zhengzhou Province, 1405 East navigation road, CITIC Plaza, 4 floor, East

Patentee before: China Railway Manufacturing Equipment Group Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20110209

CX01 Expiry of patent term