CN201738443U - Prefabricated concrete double-overlapping beam - Google Patents

Prefabricated concrete double-overlapping beam Download PDF

Info

Publication number
CN201738443U
CN201738443U CN2010202194723U CN201020219472U CN201738443U CN 201738443 U CN201738443 U CN 201738443U CN 2010202194723 U CN2010202194723 U CN 2010202194723U CN 201020219472 U CN201020219472 U CN 201020219472U CN 201738443 U CN201738443 U CN 201738443U
Authority
CN
China
Prior art keywords
concrete
superposed beams
precast concrete
reinforcing bar
superposed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202194723U
Other languages
Chinese (zh)
Inventor
黄昆
谷明旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGSHANG KUAIERJU HOUSE PREFABRICATION COMPONENT CO Ltd
Original Assignee
ZHONGSHANG KUAIERJU HOUSE PREFABRICATION COMPONENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGSHANG KUAIERJU HOUSE PREFABRICATION COMPONENT CO Ltd filed Critical ZHONGSHANG KUAIERJU HOUSE PREFABRICATION COMPONENT CO Ltd
Priority to CN2010202194723U priority Critical patent/CN201738443U/en
Application granted granted Critical
Publication of CN201738443U publication Critical patent/CN201738443U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a prefabricated concrete double-overlapping beam, which comprises a steel bar cage frame, wherein concrete side plates are respectively cast on the left side and the right side of the steel bar cage frame, and cavities capable of accommodating main stress ribs and concrete are formed between the two side plates. The utility model has the goal of overcoming the defects in the prior art, and provides the prefabricated concrete double-overlapping beam which has simple structure, can realize the intersection with a main beam and a sub beam, can meet the design construction requirement, and can form a whole body with the newly cast concrete.

Description

The two superposed beams of a kind of precast concrete
Technical field
The utility model relates to the two superposed beams of a kind of precast concrete.
Background technology
China advocates and greatly develops housing industrialization, needing advanced technology supports, at present the developing direction that the building main body construction technology is generally acknowledged comprises: prefabricating technique, big template technology, exempt from form removal or exempt from mould plate technique, prefabricating technique is based on the assembled integral technology, characteristics be the duration short, quality good, but is subjected to transportation, lifting restriction sometimes; Big template technology is based on cast-in-place, and characteristics are that quality is good, but limited by striking time, and often the duration is longer; Prefabricating technique has developed very ripely, but traditional prefabricated solid beam is when handling the situation that the primary and secondary beam intersects, and the structural form that can not meet design requirement often is particularly in nine-squares beam structure, require the main muscle under the beam to pass through fulcrum, adopt general prefabricated solid beam can't realize at all.At present general precast reinforced concrete beam exist member dead weight big, be easy to generate with the reinforcement location of pillar conflict, the crossing shortcoming that can not become integral body of primary and secondary beam.
The utility model content
The purpose of this utility model is in order to overcome weak point of the prior art, to provide a kind of simple in structure, and the primary and secondary beam is intersected, and satisfies the structure requirement of design, and with the two superposed beams of the integrant precast concrete of young concrete.
In order to achieve the above object, the utility model adopts following scheme:
The two superposed beams of a kind of precast concrete comprise the reinforcing bar cage, are cast with the concrete side plate respectively on described reinforcing bar cage and arranged on left and right sides, form between the described biside plate and can hold main stress muscle and concrete cavity.
The two superposed beams of aforesaid a kind of precast concrete wherein also are cast with concrete floor in described reinforcing bar cage bottom, and described concrete floor and left and right two concrete side plates form a U type groove.
The two superposed beams of aforesaid a kind of precast concrete, the washing hair side of wherein said its inner surface of concrete side plate for new-old concrete is connected easily.
The two superposed beams of aforesaid a kind of precast concrete, the washing hair side of its inner surface of wherein said concrete floor for new-old concrete is connected easily.
The two superposed beams of aforesaid a kind of precast concrete wherein can be provided with decorative layer and insulation layer at described concrete surface of side plate.
The two superposed beams of aforesaid a kind of precast concrete, wherein the two superposed beams of precast concrete are rectangle.
The two superposed beams of aforesaid a kind of precast concrete, wherein can be in described cavity pre-buried hydroelectric line.
The two superposed beams of aforesaid a kind of precast concrete, wherein can be in described cavity the part main stress reinforcing bar of pre-buried beam.
Compared with prior art, the beneficial effects of the utility model:
One, the dual-side of the two superposed beams of the utility model precast concrete can be made in factory, mould is reusable, and can realize mechanization, automated production, cast in situs beam core concrete can be saved a large amount of templates, reduces the workload of formwork form removal, can behind installation in position, steel bar stress be installed according to the design needs, can keep good globality with cast-in-place superimposed concrete, accelerating construction progress when guaranteeing component quality is saved engineering cost.
Two, the two superposed beams of the utility model precast concrete are made up of concrete and reinforcing bar, has certain rigidity and stability, certain supporting capacity is arranged, the template that has replaced cast-in-situ concrete, the extensive work of formwork, form removal when having exempted general site operation crossbeam, time saving and energy saving, have practical value, be " exempting from template " technology of a kind of advanced person;
Three, the two superposed beams of the utility model precast concrete can be widely used in general industrial and civilian construction and municipal administration, bridge engineering, be used to replace traditional prefabricated solid beam, cast-in-place solid beam, make the primary and secondary beam intersect the structure requirement of satisfying design, and can well constitute integral body.
Description of drawings
Fig. 1 is the schematic diagram of reinforcing bar cage;
Fig. 2 is the schematic diagram that the reinforcing bar cage is connected with a concrete side plate;
Fig. 3 is one of schematic diagram of the present utility model;
Fig. 4 is two of a schematic diagram of the present utility model;
Fig. 5 is one of schematic diagram of being connected with pillar of superposed beam;
Fig. 6 is two of the schematic diagram that is connected with pillar of superposed beam.
The specific embodiment
Below in conjunction with the description of drawings and the specific embodiment the utility model is described further:
The two superposed beams of a kind of precast concrete shown in Fig. 1 to 6 comprising reinforcing bar cage 1, are cast with concrete side plate 2 respectively on described reinforcing bar cage 1 and arranged on left and right sides, form between the described biside plate 2 and can hold main stress muscle and concrete cavity 3.
Can also also be cast with concrete floor 4 in described reinforcing bar cage 1 bottom in the utility model, described concrete floor 4 forms a U type groove with left and right two concrete side plates 2.At described concrete side plate 2 and the washing hair side of concrete floor 4 its inner surfaces for new-old concrete is connected easily.Can be provided with decorative layer and insulation layer on described concrete side plate 2 surfaces.
The two superposed beams of the utility model precast concrete are made up of two blocks of prefabricated concrete side plates and the good reinforcing bar of colligation, two block concrete side plates of beam can prefabricated production in factory, leave cavity between two blocks of side plates, the stirrup part of beam is imbedded in the two block concrete side plates, the two superposed beams of precast concrete lift the back at the scene and only need install bed die, do not need to install the limit mould, can be in prefabricated pair of superposed beam the pre-buried muscle of being advocated, overlap reinforcing bar at position of joints according to the code requirement colligation, concreting in cavity is with Liang Yuzhu, wall connects into the form of structure that design needs; Also can only establish stirrup and necessary bearing rod in the two superposed beams of precast concrete, behind the precast beam hoisted in position, to design the main stressed vertical muscle colligation of the beam that needs again on beam stirrup, concreting material in the cavity between two block concrete side plates makes new-old concrete be connected to become whole crossbeam.Can bury hydroelectric line underground in the beam, the two superposed beams of precast concrete can be put in order the structure of watering to one with laminated floor slab or cast-in-situ floor.
Wherein prefabricated pair of superposed beam profile of the utility model is rectangle, and described two block concrete side plates have certain thickness, can bear the pressure of young concrete.The bottom of two block concrete side plates can well contact with the bed die plane, prevents the concrete spillage of new cast in the cavity.
The two superposed beams of the utility model precast concrete can be prefabricated in the factory, mould is reusable, and can realize mechanization, automated production, a large amount of templates can be saved in the scene, reduce the workload of formwork form removal, can behind installation in position, steel bar stress be installed, can keep good globality with cast-in-place superimposed concrete according to the design needs, accelerating construction progress when guaranteeing component quality is saved engineering cost.

Claims (8)

1. two superposed beams of a precast concrete, it is characterized in that comprising reinforcing bar cage (1), on described reinforcing bar cage (1) and arranged on left and right sides, be cast with concrete side plate (2) respectively, form between the described biside plate (2) and can hold main stress muscle and concrete cavity (3).
2. the two superposed beams of a kind of precast concrete according to claim 1 is characterized in that also being cast with concrete floor (4) in described reinforcing bar cage (1) bottom, and described concrete floor (4) forms a U type groove with left and right two concrete side plates (2).
3. the two superposed beams of a kind of precast concrete according to claim 1 is characterized in that the washing hair side of its inner surface of described concrete side plate (2) for new-old concrete is connected easily.
4. the two superposed beams of a kind of precast concrete according to claim 2 is characterized in that the washing hair side of its inner surface of described concrete floor (4) for new-old concrete is connected easily.
5. the two superposed beams of a kind of precast concrete according to claim 2 is characterized in that can being provided with decorative layer and insulation layer on described concrete side plate (2) surface.
6. the two superposed beams of a kind of precast concrete according to claim 1 is characterized in that the two superposed beams of precast concrete are rectangle.
7. the two superposed beams of a kind of precast concrete according to claim 1, it is characterized in that can be in described cavity (3) pre-buried hydroelectric line.
8. the two superposed beams of a kind of precast concrete according to claim 1 and 2, it is characterized in that can be in described cavity (3) the part main stress reinforcing bar of pre-buried beam.
CN2010202194723U 2010-05-29 2010-05-29 Prefabricated concrete double-overlapping beam Expired - Fee Related CN201738443U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202194723U CN201738443U (en) 2010-05-29 2010-05-29 Prefabricated concrete double-overlapping beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202194723U CN201738443U (en) 2010-05-29 2010-05-29 Prefabricated concrete double-overlapping beam

Publications (1)

Publication Number Publication Date
CN201738443U true CN201738443U (en) 2011-02-09

Family

ID=43553721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202194723U Expired - Fee Related CN201738443U (en) 2010-05-29 2010-05-29 Prefabricated concrete double-overlapping beam

Country Status (1)

Country Link
CN (1) CN201738443U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535742A (en) * 2011-12-12 2012-07-04 中冶建工集团有限公司 Structural member of self-insulation pre-fabricated beam
CN102535711A (en) * 2012-01-13 2012-07-04 湖北弘毅建筑装饰工程有限公司 Laminated floor slab for steel buildings
CN104453093A (en) * 2014-12-05 2015-03-25 西安建筑科技大学 Prefabricated steel reinforced concrete beam with transversal high-strength concrete clapboard, and construction method
CN105569264A (en) * 2016-02-24 2016-05-11 刘家文 Double-faced superposed beam and construction method thereof
CN106499118A (en) * 2016-10-25 2017-03-15 扬州大学 A kind of composite concrete prefabrication and assembly construction beam
GB2543513A (en) * 2015-10-20 2017-04-26 Bryden Wood Tech Ltd Building system
CN106703287A (en) * 2015-11-18 2017-05-24 长沙理工大学 Assembled integral type beam, and construction method thereof
CN107975185A (en) * 2017-12-01 2018-05-01 沈阳建筑大学 Concealed beam formula connects full precast concrete harden structure, making and assembly method
CN108331198A (en) * 2018-03-05 2018-07-27 西南科技大学 A kind of novel fabricated reinforced concrete circle beam-constructional column method of construction
BE1026230B1 (en) * 2018-04-23 2019-11-25 Deleersnyder Bvba A prefabricated building element of reinforced concrete
CN114045750A (en) * 2021-11-10 2022-02-15 中冶交通建设集团有限公司 Construction method of high pier column tie beam

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535742A (en) * 2011-12-12 2012-07-04 中冶建工集团有限公司 Structural member of self-insulation pre-fabricated beam
CN102535711A (en) * 2012-01-13 2012-07-04 湖北弘毅建筑装饰工程有限公司 Laminated floor slab for steel buildings
CN104453093A (en) * 2014-12-05 2015-03-25 西安建筑科技大学 Prefabricated steel reinforced concrete beam with transversal high-strength concrete clapboard, and construction method
GB2543513A (en) * 2015-10-20 2017-04-26 Bryden Wood Tech Ltd Building system
CN106703287A (en) * 2015-11-18 2017-05-24 长沙理工大学 Assembled integral type beam, and construction method thereof
CN105569264A (en) * 2016-02-24 2016-05-11 刘家文 Double-faced superposed beam and construction method thereof
CN105569264B (en) * 2016-02-24 2019-11-08 刘家文 Two-sided composite beam and its construction method
CN106499118A (en) * 2016-10-25 2017-03-15 扬州大学 A kind of composite concrete prefabrication and assembly construction beam
CN107975185A (en) * 2017-12-01 2018-05-01 沈阳建筑大学 Concealed beam formula connects full precast concrete harden structure, making and assembly method
CN108331198A (en) * 2018-03-05 2018-07-27 西南科技大学 A kind of novel fabricated reinforced concrete circle beam-constructional column method of construction
BE1026230B1 (en) * 2018-04-23 2019-11-25 Deleersnyder Bvba A prefabricated building element of reinforced concrete
CN114045750A (en) * 2021-11-10 2022-02-15 中冶交通建设集团有限公司 Construction method of high pier column tie beam
CN114045750B (en) * 2021-11-10 2023-11-28 中冶交通建设集团有限公司 Construction method of high pier column tie beam

Similar Documents

Publication Publication Date Title
CN201738443U (en) Prefabricated concrete double-overlapping beam
CN108867855B (en) Vertical and horizontal integral laminated concrete frame structure and laminated molded body
CN107401217B (en) A kind of beamless hollow floor-chamber concrete-filled steel tube shear wall combined structure system and method
CN203213346U (en) Connecting structure for assembling integral concrete frame and shear wall
CN103243838A (en) Connection structure of integrally assembled concrete frame and shear wall
CN204059601U (en) A kind of steel bar connecting structure of prefabricated concrete element
CN208072950U (en) A kind of combination set shaped steel formwork
CN213087125U (en) Prefabricated shear force wall horizontal connection node means
CN203603261U (en) Connecting structure for balcony slab and superposed beam
CN105220792A (en) A kind of prefabricated concealed bracings energy-consuming shear wall and assemble method thereof
CN215211876U (en) Waterproof hollow wall structure of precast concrete
CN210713517U (en) Assembled superposed beam structure
CN109667376A (en) Novel superposed superstructure and its construction method suitable for steel construction H profile steel beam
CN207934054U (en) A kind of prefabricated assembled raft foundation
CN111075101A (en) BM interlocking building block U-shaped block lintel, ring beam and horizontal tie beam and construction method thereof
CN108104309B (en) Formwork-free assembling shear wall structure and construction method
CN203716289U (en) Overall fabricated type frame system
CN207647033U (en) A kind of precast reinforced basket structure
CN212926589U (en) Assembly type formwork-dismantling-free structural body formwork and cast-in-place formwork-dismantling-free structural body
CN202899440U (en) Prefabricated structural column
CN103572891B (en) A kind of pregroove plate
CN212957612U (en) Assembly type formwork-dismantling-free structural body formwork and cast-in-place formwork-dismantling-free structural body
CN111851804A (en) Assembly type formwork-dismantling-free structural body formwork and cast-in-place formwork-dismantling-free structural body
CN203795600U (en) Embedded column type prefabricated reinforced concrete member joint
CN203795599U (en) Embedded column type prefabricated reinforced concrete member connection joint

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110209

Termination date: 20140529