CN201738324U - Project pile deflection prevention structure used on soft soil foundation - Google Patents

Project pile deflection prevention structure used on soft soil foundation Download PDF

Info

Publication number
CN201738324U
CN201738324U CN2010201840085U CN201020184008U CN201738324U CN 201738324 U CN201738324 U CN 201738324U CN 2010201840085 U CN2010201840085 U CN 2010201840085U CN 201020184008 U CN201020184008 U CN 201020184008U CN 201738324 U CN201738324 U CN 201738324U
Authority
CN
China
Prior art keywords
engineering
piles
pile
stake
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201840085U
Other languages
Chinese (zh)
Inventor
马惠彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Ocean University ZJOU
Original Assignee
Zhejiang Ocean University ZJOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ocean University ZJOU filed Critical Zhejiang Ocean University ZJOU
Priority to CN2010201840085U priority Critical patent/CN201738324U/en
Application granted granted Critical
Publication of CN201738324U publication Critical patent/CN201738324U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model relates to a project pile deflection prevention structure used on soft soil foundation and a pretreatment method. The utility model is characterized in that a strengthening structure is arranged around a project pile, and includes a plurality of stirring piles continuously arranged around a bearing platform to present a grating structure, wherein the stirring piles have the same heights as the project pile, and the depths of the stirring piles are 1.2-1.4 times of the depth of a foundation pit, and the strengthening structure is arranged within the 2/3-3/4 foundation pit range by taking the foundation pit as the center. Compared with the prior art. The project pile deflection prevention structure used on soft soil foundation and the pretreatment method can efficiently prevent deflection of the project pile when the soft soil foundation is excavated to form the foundation pit.

Description

Soft foundation preventing engineering stake off-set construction
Technical field
The utility model relates to building field, specifically refers to a kind of soft foundation excavation of foundation pit preventing engineering stake off-set construction.
Background technology
Existing building is more effective space that utilizes, and majority is provided with basement.During engineering construction, need first engineering piles, in engineering, use, finally build, stressed stake of working in the structure.Engineering piles is the stake that is used on the engineering entity, bear certain load, and test pile is done detection design and used, if bigger engineering will be done test pile separately, if important engineering not too is also passable with doing on the entity.
The coastal area soft foundation is generally based on mud or mucky soil, and such native liquidity index is big, is in stream and moulds state, and shear strength is low, compressibilty is higher, permeability is less.Practice shows that the construction quality and the off normal of general ground engineering piles are controlled than being easier to.But in soft foundation; the engineering piles of construction usually the off normal construction quality problem can occur, and promptly the position is errorless during pile sinking, and the intermediate acceptance before the pile follower is also no problem; but after coming out, excavation finds part engineering piles position off normal, sometimes or even large-area off normal.This mainly contains following several aspect and causes:
1) the soil compaction reason causes an off normal, because when ground is squeezed in stake, no matter be that always some or whole soil bodys are extruded the position of pile body for the stake of pile tube or other type, cause near the displacement of the soil body of pile body, the corresponding superposition of its displacement of increase along with the pile sinking number, cause the engineering piles of having constructed with land movement, the density of stake is close more, and then Zhuan off normal is big more.
2) under the effect of excess pore water pressure, the soil body produces displacement; Weak saturated mud and mucky silt, its water permeability is poor.In pile driving process, when producing pile body casting and land movement, form very high excess pore water pressure in the soil body.If this excess pore water pressure that increases rapidly, before excavation of foundation pit, in time do not obtain dissipating, work as excavation of foundation pit, the part soil body is excavated, stress in the foundation soil loses original balance, and under the effect of excess pore water pressure, the soil body produces displacement, even cause the unstability of excavation slope and foundation ditch bottom to gush soil and soil body slip, cause the off normal even the fracture of engineering piles thus.
Biased the moving mainly of stake taken place and owing to lateral earth pressure increases soil body generation displacement caused in 3) soil excavation construction infection.As the disturbance of large-scale construction equipment to the soil body, the side slope design is unreasonable, and soil excavation is too early or the like.Simultaneously because the soil compaction effect in the preformed pile formation of pile, and along with the continuous increase of pile quantity, the stress of being put aside in the soil is increasing, and local stress discharges the off normal that is easy to cause stake in excavation.
Because ground processing in early stage input cost is big, the time is long, and the difficult quality to the stake off normal in excavation of foundation pit guarantees fully, brings bigger economy and qualitative loss for follow-up processing.Therefore, how preventing the generation of engineering piles off normal, is that engineering is paid close attention to.
Summary of the invention
Technical problem to be solved in the utility model is that the present situation at prior art provides a kind of soft foundation excavation of foundation pit preventing engineering stake off-set construction.
The utility model solves the problems of the technologies described above the technical scheme that is adopted: this soft foundation preventing engineering stake off-set construction, it is characterized in that around engineering piles, being provided with ruggedized construction, described ruggedized construction comprises that a plurality of cushion caps that center on are the continuously arranged cement mixing method of cell structure, the stake top mark of described agitation pile is high concordant with absolute altitude at the bottom of the foundation ditch, the degree of depth of agitation pile is 1.2-1.4 a times of foundation depth, and it is the 2/3-3/4 foundation ditch scope at center that described ruggedized construction is positioned at described foundation ditch central authorities, near the peripheral part of pattern foundation pit supporting structure because the existence of pattern foundation pit supporting structure can not need or a little is reinforced, certainly to needs consider that foundation pit supporting construction passive area soil reinforces except.
Described agitation pile can cushion cap be that well head is roughly the arrangement of " well " font structure.
Preferably, described agitation pile can be Φ 700@600 cement mixing pile.
The pile position deviation of described agitation pile preferably is not more than 50mm, and vertical missing is not more than 1.0%.
In above-mentioned each scheme, in the described ruggedized construction between adjoining two agitation piles part superimposed.
Compared with prior art, engineering piles off normal when the utility model can effectively prevent the soft foundation excavation of foundation pit, practicality rational in infrastructure is implemented to make easily, and is effective.
Description of drawings
Fig. 1 to Fig. 3 is the floor map of three kinds of ruggedized constructions among the utility model embodiment.
The specific embodiment
Embodiment describes in further detail the utility model below in conjunction with accompanying drawing.
1, determines Scheme of Strengthening.
As shown in Figure 1 to Figure 3, it is in the about 2/3-3/4 foundation ditch scope of center that ruggedized construction in this soft foundation preventing engineering stake off-set construction is arranged on foundation ditch central authorities, comprise a plurality of agitation piles 1, these agitation piles are to be centered around around the cushion cap 3 on substantially, show cushion cap greatly and be that well head is approximate " well " that font is arranged, form reinforcing block continuous, grid type, engineering piles 2 is arranged on the corner of its corresponding cushion cap 3.The reinforcing block of corresponding a plurality of cushion caps also can be independent separately.
Cushion cap as described in Figure 1 is triangle roughly, and described engineering piles has three, all is arranged on each corner location of described cushion cap, also is provided with between each engineering piles each engineering piles two two isolated agitation piles.
Cushion cap as shown in Figure 2 is square, and engineering piles has four, all is arranged on each corner location of described cushion cap, is provided with between the adjoining engineering piles both isolated agitation piles.
Cushion cap as described in Figure 3 is rectangle, and engineering piles has two, is arranged on two side positions of described cushion cap, and ruggedized construction is " well " font.
The degree of depth of agitation pile 1 is 1.3 times of foundation depth, adopts Φ 700@600 cement mixing pile.Cement mixing pile stake top mark height is an absolute altitude at the bottom of the foundation ditch.
2, material and equipment.
Main material: cement adopts the general portland cement of 42.5R level; Construction water adopts the municipal tap water; Additive is selected gypsum powder for use.Main construction equipment is as shown in table 1.
Table 1
Title Specification Quantity Power (KW) Purposes
The cement mixing pile machine SGH-16 7 2×30 Piling
Extrusion pump HB6-3 14 2.2 Defeated slurry
Grout mixer HL-1 type 200L 1 2.2 Cement paste is mixed
Concrete mixer JZC-350 1 5.5 Concrete stirs
Submersible pump QSR-15 4 1.5 Draining
Level gauge S-3 2 - Measure
Total powerstation RTS-632H 1 - Measure
3, main construction sequence and technology
Construction sequence: the slag packing course → agitation pile location → system cement paste → whitewashing of delaying when cutting out former pile sinking stirs → and promote → repeat whitewashing to stir → repeat to promote until aperture → close mixer, cleaning → move to next pile, repeat above operation.
Concrete soft foundation preventing engineering stake off normal preprocess method is as follows:
(1) location centering: crane suspention mixer arrives specifies the stake position, and centering does not make drilling rod keep vertical with the level ground if ground should not be regulated screw mandrel at ordinary times.
(2) preparation curing compound slurries: system curing compound slurries are mixed on the backstage, treat before the mud jacking slurries to be poured in the aggregate bin.
(3) stir sinking in advance: start mixer motor, treat that the stirring-head rotating speed loosens hoisting wirerope after normal, mixer is sunk while stirring along leading truck, sink down into a top mark when high, open extrusion pump, make host header stir the projected depth that sinks down into regulation while whitewashing along leading truck.
(4) stirring promotes: deep mixer is closed extrusion pump after sinking to arriving projected depth, and the stirring drill bit begins stirring and is promoted to a whitewashing stake top mark height.
(5) repeating whitewashing stirs: when mixer is promoted to design end face absolute altitude, open extrusion pump again, the limit whitewashing sinks down into projected depth while stirring, and this moment, every pile cement consumption should just be used up.
(6) repeat to promote: after the stirring drill bit sinks down into projected depth, be promoted to ground then while stirring.
(7) displacement: repeat above-mentioned six steps and carry out the construction of next pile.
(8) close Mixing Machine, be displaced to new reinforcement point.
4, quality control standard.
(1) adopt Φ 700@600 cement mixing pile, it is 8% that cement mixing content 15%, sky stir the part cement mixing content, adopts 42.5R level ordinary portland cement, water/binder ratio 0.5.Admixture gypsum powder, volume are 2.0% of cement mixing content; The mixing pile construction hoisting velocity is controlled in the 0.8m/min.The cement mixing pile maintenance begins the basement earthwork construction after 14 days.
(2) for guaranteeing the verticality of cement mixing pile, note lifting by crane the planeness of mixing plant and the verticality of leading truck, the pile position deviation of cement mixing method is not more than 50mm, and vertical missing is not more than 1.0%, stirs rising or falling speed and is not more than 0.5m/min.
(3) cement mixing pile should be constructed continuously, and must not surpass 24h blanking time, can't overlap as long causing of blanking time, should adopt remedial measures.
(4) construction technology of cement mixing pile is the long even whitewashing of full stake of " four stir two sprays ".Whitewashing can't use up cement paste as secondary, can repeatedly whitewash.
(5) before stirring-head is cut soil sinking arrival stake end, filter clean cement grout and be transported to stake end and (note: the construction parameter operation of confirming according to test pile mixing, stirring-head is cut soil and is sunk to arriving the stake end, slurries also should arrive the stake end simultaneously), mortar pump pressure is controlled in 0.4~0.6MPa scope, and stirring hoisting velocity should be synchronous with defeated slurry speed.
(6) before working start every day, should measure the stirring-head blade diameter earlier and whether reach 700mm, stir when blade has wearing and tearing and should in time add weldering, prevent that the stake footpath is less than normal.
(7) stir in advance when sinking and to wash by water,, can suitably wash by water, dwindle slurry water gray scale or increase and mix method such as slurries and remedy the influence of bath pile strength but use when running into than hardpan to sink when too slow.
Stop slurry when (8) constructing for some reason, stirring-head should be sunk down into and stop the following 1.0m of a slurry point place, the lifting of whitewashing again when waiting to recover to supply slurry.If shut down more than 3 hours, should dismantle grout pipe line, clean up plugging when preventing to recover construction.
(9) for guaranteeing a stake end stake top application working medium amount, after slurries reached grout outlet, a 30s at the bottom of should whitewashing made slurries arrive the stake end fully; When drill bit is promoted to a top mark when high, should stop to promote, stir the several seconds again, evenly closely knit to guarantee pile crown.

Claims (6)

1. soft foundation preventing engineering stake off-set construction, it is characterized in that around engineering piles, being provided with ruggedized construction, described ruggedized construction comprises that a plurality of cushion caps that center on are the continuously arranged cement mixing method of cell structure, the stake top mark of described agitation pile is high concordant with absolute altitude at the bottom of the foundation ditch, the degree of depth of agitation pile be foundation depth 1.2-1.4 doubly, and described ruggedized construction to be positioned at described foundation ditch central authorities be the 2/3-3/4 foundation ditch scope at center.
2. soft foundation preventing engineering stake off-set construction according to claim 1 is characterized in that described agitation pile is that well head is roughly the arrangement of " well " font structure with the cushion cap.
3. soft foundation preventing engineering stake off-set construction according to claim 2, it is characterized in that described cushion cap is triangle roughly, described engineering piles has three, all is arranged on each corner location of described cushion cap, also is provided with between each engineering piles each engineering piles two two isolated agitation piles; Perhaps described cushion cap is square, and described engineering piles has four, all is arranged on each corner location of described cushion cap, is provided with between the adjoining engineering piles both isolated agitation piles; Perhaps described cushion cap is rectangle, and engineering piles has two, is arranged on two side positions of described cushion cap.
4. soft foundation preventing engineering stake off-set construction according to claim 1, its feature at described agitation pile is
Figure FSA00000093737000011
The 700@600 cement mixing pile.
5. soft foundation preventing engineering stake off-set construction according to claim 4 is characterized in that the pile position deviation of described agitation pile is not more than 50mm, and vertical missing is not more than 1.0%.
6. according to the described soft foundation preventing engineering of the arbitrary claim of claim 1 to 5 stake off-set construction, it is characterized in that part is superimposed between two adjoining in described ruggedized construction agitation piles.
CN2010201840085U 2010-05-07 2010-05-07 Project pile deflection prevention structure used on soft soil foundation Expired - Lifetime CN201738324U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201840085U CN201738324U (en) 2010-05-07 2010-05-07 Project pile deflection prevention structure used on soft soil foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201840085U CN201738324U (en) 2010-05-07 2010-05-07 Project pile deflection prevention structure used on soft soil foundation

Publications (1)

Publication Number Publication Date
CN201738324U true CN201738324U (en) 2011-02-09

Family

ID=43553602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201840085U Expired - Lifetime CN201738324U (en) 2010-05-07 2010-05-07 Project pile deflection prevention structure used on soft soil foundation

Country Status (1)

Country Link
CN (1) CN201738324U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102235008A (en) * 2010-05-07 2011-11-09 浙江海洋学院 Engineering pile deviation preventing structure of soft soil foundation and pretreatment method
CN103046574A (en) * 2013-01-28 2013-04-17 中国水电顾问集团西北勘测设计研究院 Four-leaf-clover-type concrete bearing platform and prestressed pipe foundation structure of soft foundation fan

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102235008A (en) * 2010-05-07 2011-11-09 浙江海洋学院 Engineering pile deviation preventing structure of soft soil foundation and pretreatment method
CN103046574A (en) * 2013-01-28 2013-04-17 中国水电顾问集团西北勘测设计研究院 Four-leaf-clover-type concrete bearing platform and prestressed pipe foundation structure of soft foundation fan
CN103046574B (en) * 2013-01-28 2015-09-16 中国电建集团西北勘测设计研究院有限公司 A kind of soft damage blower fan four leaf plum type concrete bearing platform prestressed pipe foundation structure

Similar Documents

Publication Publication Date Title
CN103422497A (en) Method for reinforcing soft soil foundation by using cement-soil mixing pile
CN102900090A (en) Non-inclined dry-operation open caisson capable of preventing water burst and land subsidence and construction method thereof
CN103046557A (en) Foundation pit water-sealing supporting method by using long spiral cement soil mixing structural steel pile
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN102011399A (en) PHC pile-based multiple high jet pedestal pile construction method
CN102235008B (en) Engineering pile deviation preventing structure of soft soil foundation and pretreatment method
CN104153371A (en) Grouting-to-stop-water construction method of underwater rubble bed
CN107338804A (en) A kind of hollow independent composite pile foundation of super-large diameter and its method of construction
CN102912808A (en) Spiral CFG pile and cement stirring pile combined composite foundation construction method
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
CN106245643A (en) A kind of compound pile-type structure being applicable to the process of coastal deep reclaimed ground and construction method
CN105464079A (en) Forming construction method of long-spiral pore-forming pile-slab-pile supporting and anti-seepage continuous wall
CN110512536A (en) Region of FuShui box culvert cracking comprehensive treatment construction
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN201738324U (en) Project pile deflection prevention structure used on soft soil foundation
CN101338567B (en) Construction method for underground buildings by rotary-spray shaft digging method cooperating with semi-inverse method
CN105672329B (en) The large size prefabricated building enclosure of deep basal pit and construction method
CN101793024B (en) Construction method for multi-head small-diameter deep mixing and high-pressure jet combined anti-seepage wall of foundation pit
CN204282295U (en) Pile formula case cylinder breakwater structure
CN206157726U (en) Composite pile type structure suitable for coast deep dredger fill soil foundation handle
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN114411758A (en) Foundation pit support multi-shaft pressure-grouting pile construction process based on solid waste utilization
CN212801508U (en) Grouting spiral steel pile for foundation stabilization
CN101709579B (en) Construction method of conjoined mortar piling wall
CN103603345A (en) Cement mixing grouting pile foundations and forming method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110209

Effective date of abandoning: 20130424

RGAV Abandon patent right to avoid regrant