CN201738304U - Processing unit for concrete cast-in-place pile head - Google Patents

Processing unit for concrete cast-in-place pile head Download PDF

Info

Publication number
CN201738304U
CN201738304U CN2010202175741U CN201020217574U CN201738304U CN 201738304 U CN201738304 U CN 201738304U CN 2010202175741 U CN2010202175741 U CN 2010202175741U CN 201020217574 U CN201020217574 U CN 201020217574U CN 201738304 U CN201738304 U CN 201738304U
Authority
CN
China
Prior art keywords
compressed gas
cast
pile head
place pile
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202175741U
Other languages
Chinese (zh)
Inventor
黎明中
田国清
吴宗庆
冯鄂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN2010202175741U priority Critical patent/CN201738304U/en
Application granted granted Critical
Publication of CN201738304U publication Critical patent/CN201738304U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a processing unit for processing the section of a concrete cast-in-place pile which is higher than a marked position with the object to solve the problems seen in the prior art. Currently, the higher positioned section of a cast-in-place pile is normally eradicated by a crusher or a drilling hammer with a sharp head or an air pick, which easily breaks the cast-in-place pile with the slightest neglect and makes the main bar in the reinforcing steel bar contained in the higher positioned section of the cast-in-place pile damaged or deformed. Thereby, the marked height of a cast-in-place pile can not be ensured even though great effort has been devoted and the quality of the constructions is not guaranteed, either. To solve these problems, the following measures are raised. The utility model comprises a compressed air hose, a compressed air branch hose, a compressed air source, a regulating master valve arranged on the compressed air hose, a pressure meter and a regulating valve connected to the compressed air branch hose. The utility model enables the materials composing concrete with different proportions to sink to different layers with the action of air while making the rest part of concrete less strong so as to be better processed. In this manner, the cast-in-place piles and the main bar contained therein are less likely to be damaged and the quality of cast-in-place piles is thereby effectively increased.

Description

The treating apparatus of concrete pouring pile head
Technical field
The utility model relates to underwater concrete filling pile head or wall top mark height such as bored pile or diaphragm wall, specifically belongs to the treating apparatus of the elevation-exceeding part of concrete pouring pile head.
Background technology
At present, the pouring pile head after underwater grouting finishes all is doped with laitance liquid and poor mud mostly on its pile crown.The existence of laitance liquid and poor mud will be very unfavorable to the quality of pouring pile head, to the building that will on this pouring pile head, build, will have very big harm.The constructor is the quality that guarantees pouring pile head and go up the building of building for this reason, the perfusion of taking to exceed setting mixes the measure of doubting about native pile crown 0.5-1.0m, after treating that pouring pile head finishes, to exceed the mixed part of doubting native pile crown of the filling that sets and root out, and the reinforcing bar master muscle that exceeds part is exposed.
Owing to root out is to adopt crushing engine or tip drilling hammer (pneumatic pick) to carry out mixed doubting when the soil stake reaches intensity, during operation, if carelessness is arranged slightly, just may make pile crown produce the crack, sometimes also may make the reinforcing bar master muscle that exceeds part produce damage or distortion, mix the absolute altitude of doubting native pile crown and cause guaranteeing to set perfusion, labour intensity is time-consuming greatly again, and can not guarantee workmanship.
The utility model content
The purpose of this utility model is to overcome above-mentioned deficiency, the treating apparatus that provide that a kind of perfusion that exceeds setting mixes that the part of doubting native pile crown absolute altitude is rooted out easily, the time spent is few, the reinforcing bar master muscle of exposed portions serve and pile crown is difficult for impaired concrete pouring pile head.Realize the technical measures of above-mentioned purpose:
The treating apparatus of concrete pouring pile head, it is: its by compressed gas house steward, the compressed gas arm that is connected with the compressed gas house steward and compressed gas source, compressed gas house steward go up the adjusting main valve installed and pressure meter, the control valve that connects on the compressed gas arm forms.
It is: the compressed gas arm is at least 1.
It is: the installation quantity of control valve is identical with the installation quantity of compressed gas arm, and is contained in the epimere of compressed gas arm.
It is: the requiring of the bottom of compressed gas arm and pouring pile head has 100~500 mm distance between the absolute altitude.
It is: the compressed gas arm in the installation site on the compressed gas house steward so that its in the scope that the main muscle of pouring pile head is set and even layout.
The utility model compared with prior art, it is owing to adopt Compressed Gas, make the material of the different compositions of each proportion in the concrete material under the effect of gas, produce separating layer, cause cement paste, sand, building stones produce segregation and reduce the intensity of redundance concrete greatly, the bottom that is separating layer is heavy building stones, the upper strata is the little cement paste of proportion, the intermediate layer is the sand material of proportion between building stones and cement paste, the part-structure feature that concrete placing pile crown after separating according to this compressed gas exceeds standard high, cause the processing of this part is easy to, and not easy damaged pouring pile head and main reinforcement, thereby effectively guaranteed the pouring quality of concrete pile crown, for follow-up construction engineering quality has been laid solid foundation.
Description of drawings
Fig. 1 is the structural representation of the treating apparatus of concrete pouring pile head
Fig. 2 is Fig. 1 scheme of installation at the scene
The specific embodiment
Be further described below in conjunction with accompanying drawing
This specific embodiment, the diameter of concrete pouring pile head are greater than 100 centimetres, and compressed gas arm 2 is installed as more than 2; When the diameter of concrete pouring pile head during less than 100 centimetres, compressed gas arm 2 is installed 1~2.
The treating apparatus of concrete pouring pile head:, near compressed gas house steward 1 epimere place a control valve 6 is installed at every compressed gas arm 2 in compressed gas house steward 1 welding or with the compressed gas arm 2 of be threaded 1/2/4/5 and even layouts; Distance is 100 millimeters/200 millimeters/300 millimeters/400 millimeters/500 millimeters between the designing requirement absolute altitude of the bottom of compressed gas arm 2 and pouring pile head; To can not produce inflammable and explosive compressed gas source 3 with compressed gas house steward 1 employing welding or with being threaded by the air or on-the-spot satisfactory other of air compressor machine compression; Difference setting pressure table 4 and hand are regulated main valve 5 on the compressed gas house steward 1.
Operating principle
Extract the back when concrete does not condense as yet from the concrete pouring pipe, compressed gas arm 2 is inserted in the concrete, when making compressed gas arm 2, according to its bottom and pouring pile head to require the distance between the absolute altitude be 100 millimeters/300 millimeters/500 millimeters demarcation, need not in the concrete to adjust so compressed gas arm 2 inserts; Successively open control valve 6 on the compressed gas arm 2 and the adjusting main valve 5 on the compressed gas house steward 1, making pressure is that the compressed gas of 0.3~1.0Mpa sprays towards periphery via the bottom of compressed gas arm 2; After concrete surface layer began to occur the mud bubble, in time adjusting main valve 5 on the priority closes compression gas house steward 1 and the control valve 6 on the compressed gas arm 2 stopped the input of compressed gas; Extract with being about to compressed gas arm 2 then; Part to the setting absolute altitude that exceeds pouring pile head is rooted out.
Compressed gas house steward 1 also can be used as the press water house steward, and promptly medium also can be press water except that compressed gas.

Claims (5)

1. the treating apparatus of concrete pouring pile head is characterized in that: its by compressed gas house steward, the compressed gas arm that is connected with the compressed gas house steward and compressed gas source, compressed gas house steward go up the adjusting main valve installed and pressure meter, the control valve that connects on the compressed gas arm forms.
2. the treating apparatus of concrete pouring pile head as claimed in claim 1, it is characterized in that: the compressed gas arm is at least 1.
3. the treating apparatus of concrete pouring pile head as claimed in claim 1, it is characterized in that: the installation quantity of control valve is identical with the installation quantity of compressed gas arm, and is contained in the epimere of compressed gas arm.
4. the treating apparatus of concrete pouring pile head as claimed in claim 1 is characterized in that: the requiring of the bottom of compressed gas arm and pouring pile head has 100~500 mm distance between the absolute altitude.
5. the treating apparatus of concrete pouring pile head as claimed in claim 1 is characterized in that: the compressed gas arm in the installation site on the compressed gas house steward so that its in the scope that the main muscle of pouring pile head is set and even layout.
CN2010202175741U 2010-06-01 2010-06-01 Processing unit for concrete cast-in-place pile head Expired - Fee Related CN201738304U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202175741U CN201738304U (en) 2010-06-01 2010-06-01 Processing unit for concrete cast-in-place pile head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202175741U CN201738304U (en) 2010-06-01 2010-06-01 Processing unit for concrete cast-in-place pile head

Publications (1)

Publication Number Publication Date
CN201738304U true CN201738304U (en) 2011-02-09

Family

ID=43553582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202175741U Expired - Fee Related CN201738304U (en) 2010-06-01 2010-06-01 Processing unit for concrete cast-in-place pile head

Country Status (1)

Country Link
CN (1) CN201738304U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711119A (en) * 2013-12-18 2014-04-09 中铁大桥局集团第四工程有限公司 Drilled-pile mud pneumatic anti-settling circulatory system and application method thereof
CN108560539A (en) * 2018-05-24 2018-09-21 北京良乡蓝鑫水利工程设计有限公司 A kind of filling pile head device for excising and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711119A (en) * 2013-12-18 2014-04-09 中铁大桥局集团第四工程有限公司 Drilled-pile mud pneumatic anti-settling circulatory system and application method thereof
CN103711119B (en) * 2013-12-18 2015-10-28 中铁大桥局集团第四工程有限公司 A kind of pneumatic anti-settling circulating system of drilled pile mud and using method
CN108560539A (en) * 2018-05-24 2018-09-21 北京良乡蓝鑫水利工程设计有限公司 A kind of filling pile head device for excising and its construction method

Similar Documents

Publication Publication Date Title
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
US7201540B2 (en) Construction process for composite pile foundation
CN101806059B (en) Drilling, grouting and sand-throwing process of ground surface of mined-out region under highway
CN106049557B (en) Using the test method of the laboratory testing rig of simulation grout pile end follow-up grouting
CN102011399B (en) PHC pile-based multiple high jet pedestal pile construction method
CN105625149A (en) Equipment and method used for repairing road base damages
Silva et al. Effectiveness of the repair of unstabilised rammed earth with injection of mud grouts
CN105133487B (en) Construction method for using combined type bridge temporary support to rapidly build continuous beams
CN102251537A (en) Construction method for installing block slurry of sizing block by equipment
CN109086519B (en) Grouting parameter calculation method and system for self-adaptive construction environment
CN201738304U (en) Processing unit for concrete cast-in-place pile head
CN105464079A (en) Forming construction method of long-spiral pore-forming pile-slab-pile supporting and anti-seepage continuous wall
CN203441376U (en) Plugging structure for drop shaft
CN103174135B (en) Repair method of unqualified post-grouting bored concrete pile
CN101158162B (en) Unmanned pneumatic caisson construction process
CN104032713B (en) A kind of pressure diversion tunnel composite lining concrete anti-seepage structure and construction technology thereof
CN204780979U (en) Install steel -pipe pile basis of anti horizontal force of iron tower fast
CN108623253A (en) A kind of full constituent steel slag concrete stake and its processing soft base construction technology
Silva et al. Shear behaviour of rammed earth walls repaired by means of grouting
CN106149751A (en) Utilize the method that quick lime brick quarrel compaction pile reinforces building construction ground
CN101851920B (en) Treatment method of elevation-exceeding part of concrete pouring pile head
CN103981882B (en) Anti-settling construction method for large-area underground chamber-free foundation
CN101158163B (en) Pneumatic caisson bottom closing construction process
CN109868813B (en) Bottom sealing method of prestressed pipe pile
CN204590034U (en) A kind of dam foundation high pressure grouting structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110209

Termination date: 20170601