CN201721989U - Leather belt towing coiler - Google Patents

Leather belt towing coiler Download PDF

Info

Publication number
CN201721989U
CN201721989U CN2010202586293U CN201020258629U CN201721989U CN 201721989 U CN201721989 U CN 201721989U CN 2010202586293 U CN2010202586293 U CN 2010202586293U CN 201020258629 U CN201020258629 U CN 201020258629U CN 201721989 U CN201721989 U CN 201721989U
Authority
CN
China
Prior art keywords
belt
main shaft
sprocket wheel
supporting disk
reeler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202586293U
Other languages
Chinese (zh)
Inventor
马永磊
屈海超
闫东
王帅
赵立方
刘国民
曹志国
刘剑
陈晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANLONG INDUSTRIAL Co Ltd TANGSHAN CITY
Original Assignee
JIANLONG INDUSTRIAL Co Ltd TANGSHAN CITY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANLONG INDUSTRIAL Co Ltd TANGSHAN CITY filed Critical JIANLONG INDUSTRIAL Co Ltd TANGSHAN CITY
Priority to CN2010202586293U priority Critical patent/CN201721989U/en
Application granted granted Critical
Publication of CN201721989U publication Critical patent/CN201721989U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Structure Of Belt Conveyors (AREA)

Abstract

The utility model relates to an apparatus for belt conveyor, specifically to a leather belt towing coiler, which includes a reducer (1), a motor (2), a sprocket (3), a chain (10), a main shaft (4), a removable bearing block (5), supporting bars (11) and support plates (12) that are provided on the rack (8), wherein the reducer, the motor, the sprocket and the chain constitute a power transmission structure, the output of the sprocket is connected to a main shaft provided on the removable bearing block, support plates are provided at both ends of the main shaft, the two plates are connected by several supporting bars in parallel to the main shaft. The utility model has beneficial effects that the belt conveyor can be used to perform belt replacement towing operation of the belt conveyor, saves working hours, is suitable for replacement of belts with various band-widths, can save large manpower without employee overtime, running deviation problem can be resolved when the belt is in place in the belt towing process; the belt coiler has simple and practical structure, and small investment.

Description

A kind of belt pulls reeler
Affiliated technical field:
The utility model relates to the equipment that a kind of belt conveyer uses, and particularly a kind of belt pulls reeler.
Background technology:
Along with industrial fast development, belt conveyer is widely used in heavy industry departments such as metallurgy, mining, building materials, chemical industry as the load transfer device that moves continuously.Belt conveyer is through after long-term use reaches some cycles, and deterioration will inevitably appear in the belt on the conveyer, after the belt after its deterioration must be replaced with new belt, and place in operation once more.At present, Chang Yong belt substitute mode has following several: the new belt method of 1. old belt " back of the body ".An end that new belt is stripped mouth is manually emitted 5-10 rice, is fixed on the old belt of preparing to change, and starts conveyer, makes new strap lug around old one week of belt, then new belt is fixed with clamping plate, chain sling, and the maintainer carries out scale, cutting, bonding, customized.Because old belt pack is rolled in new belt inside, change production time for guaranteeing belt, the extraction of old belt and the bonding operation simultaneously of new belt.Be subjected to belt feeder fabricating yard and the intensive restriction of belt feeder frame, influence each other, can only lean on manually to cut into 5-10 rice segment artificially and pull out, the bundling arrangement in order to reduce.2. cooperate the replacing method with loader or on-site hoisting equipment, steel rope.1, pull belt (being applicable to that belt feeder operation place is more smooth) with loader, new belt roll support is positioned over an end (head or tail) of the belt feeder that changes.The end that new belt strips mouthful is manually emitted 5-10 rice, and maintenance man disconnects old belt, old belt one end is followed closely with belt with new belt stripping mouthful end be connected, and the other end of open circuited old belt is pinned with steel rope, and steel rope is connected with loader.Outwards drag steel rope with loader, drive old belt and outwards extract out, new belt is just in time placed and is finished.New belt carries out bonding customized; Old belt is by the arrangement of artificial disconnected joint bundling.2, pull belt (being applicable to that belt feeder operation place has angle of inclination and post to be equipped with electric block) with post lifting facility as electric block, the support that installs new belt volume is positioned over the end (head or tail) that will change old belt, and the passage (window or hole for hoist) of rationally sending old belt outside is set.Install one in the belt conveyer appropriate location and increase surface roller.Maintenance man disconnects old belt, and the end of an end with new belt stripping mouth is connected, and the hoist ceiling crane steel rope toward transferring, around increasing surface roller after one week, is pinned the other end that disconnects old belt.Promote the hoist ceiling crane steel rope, spur old belt to sending the passage place outside to sending outside, rope sling is untied during near cylinder in the position of steel rope rope sling lock belt, the steel rope rope sling is pulled to the far-end of old belt; Pin old belt once more, several comes and goes and pulls out fully up to the old belt of whole piece, and new belt is just in time placed and finished.This moment, old belt was sent by sending passage outside, by the arrangement of artificial disconnected joint bundling; New belt carries out bonding customized.
And in whole belt replacing process, old belt is the project that consumes manpower, consumes man-hour most most by the bundling arrangement that outwards pulls, places new belt, old belt on the belt conveyer frame.Usually this part time will account for the 70-80% that total belt is changed the time.There is following problem in above-mentioned replacing method:
1. carry on the back new belt with old belt, old belt pack is rolled in new belt inside, and old belt is equivalent to an osed top ring, restricted by intensive belt feeder frame, this substitute mode can not drop into machinery, does not also have suitable equipment to use simultaneously, can only lean on a large amount of manpowers to finish the outer of old belt and take out; And with the bonding process of new belt certain intersecting arranged, work post is many, and the coordinative command difficulty easily goes out safety misadventure;
2. belt feeder is installed in the vestibule usually, and the vestibule width is between the 2.8-3 rice, and the centre is a belt holder.With 1.2 meters of belt widths is example, and belt holder is 1.5 meters, and the wide side of vestibule is a 1.0-1.1 rice, 0.8 meter of narrow side, belt pull and readjusting operations is subjected to space constraint, organize difficulty big; Especially put the belt bundling in order and fix, can only be confined to narrow and small 1.0-1.1 rice space, the scope of operation is opened up not open, and drops into manpower and is restricted, and production time must prolong;
3. belt holder is intensive: belt feeder carrying idler support (group) spacing is 1.2 meters, and belt width is 1.2 meters, and the employee is subjected to space constraint when pulling belt between support.Old belt can only be cut into the pipe nipple of 5-10 rice, extract the bundling arrangement.Old belt is too short, and second use is worth low, and the recycling price is lower;
4. it is many to change belt input manpower, can not finish by order of classes or grades at school personnel, needs other order of classes or grades at school personnel overtime work, needs the payment overtime pay; Because production time is long, the tired operation of employee has potential safety hazard.
The utility model content:
The utility model purpose provides a kind of belt and pulls reeler, and is easy to operate, do not need a large amount of manpowers to cooperate, and reduces the belt replacing and pulls the time, safe and reliable, solves the problems referred to above that exist in the background technology.
The technical solution of the utility model is: a kind of belt pulls reeler, comprises the reductor, motor, sprocket wheel, chain, main shaft, detachable shaft bearing, strut bar, the supporting disk that are arranged on the frame.Reductor, motor, sprocket wheel, chain constitute power transmission structure, and sprocket wheel output connects the main shaft that is arranged on the detachable shaft bearing, and the two ends of main shaft are provided with supporting disk, are connected with the strut bar of spindle parallel by some between two supporting disks.
Said two supporting disks, the supporting disk of close sprocket wheel one side is welded on the main shaft, and the supporting disk of the main shaft other end is fixed by square locate mode, and main shaft is provided with one section square axis body, and supporting disk is provided with the square opening that matches.
The utility model also is provided with guide plate, carrying roller, anti-reverse baffle plate, and guide plate, carrying roller, anti-reverse baffle plate all are welded on the frame, and the anti-reverse baffle plate is arranged on by the sprocket wheel, is complementary with sprocket wheel; Two guide plates are positioned at the below of main shaft, and the width between two guide plates is consistent with belt, and carrying roller is below between two guide plates.
The beneficial effects of the utility model are: 1. available belt reeler carries out the replacing of belt conveyer belt and pulls operation; 2. carry out the operation that pulls of belt replacing with the belt reeler, compare other operational methods and can save production time greatly: 100 meters belts only need 7-10 minute; 3. pull the belt replacing that operation is applicable to various bandwidth with the belt reeler; 4. the tape spool quick release of the old belt bundle of arrangement repeatedly utilizes; 5. this equipment not only is applicable to flat belt, and is equally suitable to the belt feeder that the angle of inclination is arranged; 6. this equipment can be saved a large amount of manpowers, does not need the employee to work overtime, and operating equipment only needs 3-5 people; Sideslip problem when 7. belt pulls and can solve belt in the process and go into; 8. the belt reeler is simple and practical, invests little.
Description of drawings:
Accompanying drawing is the utility model example structure scheme drawing;
Among the figure: reductor 1, motor 2, sprocket wheel 3, main shaft 4, detachable shaft bearing 5, guide plate 6, carrying roller 9, anti-reverse baffle plate 7, frame 8, chain 10, strut bar 11, supporting disk 12.
The specific embodiment:
Below in conjunction with accompanying drawing, the utility model is described in further detail by embodiment.
In an embodiment, a kind of belt pulls reeler, comprises the reductor 1, motor 2, sprocket wheel 3, chain 10, main shaft 4, detachable shaft bearing 5, strut bar 11, the supporting disk 12 that are arranged on the frame 8.Reductor, motor, sprocket wheel, chain constitute power transmission structure, and sprocket wheel output connects the main shaft that is arranged on the detachable shaft bearing, and the two ends of main shaft are provided with supporting disk, are connected with the strut bar of spindle parallel by some between two supporting disks.Said two supporting disks, the supporting disk of close sprocket wheel one side is welded on the main shaft, and the supporting disk of the main shaft other end is fixed by square locate mode, and main shaft is provided with one section square axis body, and supporting disk is provided with the square opening that matches.The utility model also is provided with guide plate 6, carrying roller 9, anti-reverse baffle plate 7, and guide plate, carrying roller, anti-reverse baffle plate all are welded on the frame 8, and anti-reverse baffle plate 7 is arranged on by the sprocket wheel, is complementary with sprocket wheel; Two guide plates are positioned at the below of main shaft, and width and belt width between two guide plates are complementary, and carrying roller is below between two guide plates.
Specific operation process: belt spare part roll support is positioned over an end (head or tail) of the belt feeder that changes.The belt reeler is fixed to belt spare part rear portion, places suitable counterweight at belt reeler frame 8 rear sides, to increase the deadweight of belt reeler.Batch the old belt in about 20m left and right sides on the belt reeler main shaft 4 in advance.One end of belt spare part stripping mouth and an end at a certain position of belt to be replaced are riveted with the belt nail, and old belt free end is emitted 5-10 rice on the reeler, rivets with the other end at this position of belt to be changed, then separated belt to be changed in the riveted joint of two places.Notice that old belt free end is passed by belt spare part volume below on the reeler.New belt adopts manpower to place 3-5m, the belt reeler is pressed operating switch on the switch box then, motor 2 drives chain 10, sprocket wheel 3 by reductor 1, main shaft 4 is rotated by certain speed, begin to batch, spare part to be changed is along carrying roller 9, make the belt spare part rotate a week along belt feeder carrier roller frame to be changed by guide plate 6, and also corresponding the batching of belt to be changed this moment finishes, and fixes belt bundle to be changed (volume).The maintainer fixes, scale, cuts out the belt spare part, stripping mouthful, polishing, bonding, customized.Unclamp the bolt of detachable shaft bearing 5, hang down band bundle on the reeler, unload the supporting disk 12 of detachable shaft bearing 5, take off strut bar 11, tape spool, Gui Ku with crane.Distance is adjustable between the foreplate 6, is applicable to the belt of different bandwidth, after belt enters guide plate 6 simultaneously, can not swing, and has solved the sideslip problem.
Said apparatus is joined and is moved switch box, can be in diverse location wiring operation, realization scene and remote operation.

Claims (3)

1. a belt pulls reeler, it is characterized in that comprising the reductor (1), motor (2), sprocket wheel (3), chain (10), main shaft (4), detachable shaft bearing (5), strut bar (11), the supporting disk (12) that are arranged on the frame (8), reductor, motor, sprocket wheel, chain constitute power transmission structure, sprocket wheel output connects the main shaft that is arranged on the detachable shaft bearing, the two ends of main shaft are provided with supporting disk, are connected with the strut bar of spindle parallel by some between two supporting disks.
2. pull reeler according to the described belt of claim 1, it is characterized in that said two supporting disks, supporting disk near sprocket wheel one side is welded on the main shaft, the supporting disk of the main shaft other end is fixed by square locate mode, main shaft is provided with one section square axis body, and supporting disk is provided with the square opening that matches.
3. pull reeler according to claim 1 or 2 described belts, it is characterized in that the utility model also is provided with guide plate (6), carrying roller (9), anti-reverse baffle plate (7), guide plate, carrying roller, anti-reverse baffle plate all are welded on the frame (8), anti-reverse baffle plate (7) is arranged on by the sprocket wheel, is complementary with sprocket wheel; Two guide plates are positioned at the below of main shaft, and width and belt width between two guide plates are complementary, and carrying roller is below between two guide plates.
CN2010202586293U 2010-07-15 2010-07-15 Leather belt towing coiler Expired - Fee Related CN201721989U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202586293U CN201721989U (en) 2010-07-15 2010-07-15 Leather belt towing coiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202586293U CN201721989U (en) 2010-07-15 2010-07-15 Leather belt towing coiler

Publications (1)

Publication Number Publication Date
CN201721989U true CN201721989U (en) 2011-01-26

Family

ID=43490296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202586293U Expired - Fee Related CN201721989U (en) 2010-07-15 2010-07-15 Leather belt towing coiler

Country Status (1)

Country Link
CN (1) CN201721989U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102794623A (en) * 2011-05-27 2012-11-28 五冶集团上海有限公司 Belt collecting device for long belt conveyor and method of application thereof
CN103010866A (en) * 2012-12-25 2013-04-03 枣庄矿业(集团)有限责任公司田陈煤矿 Belt winch
CN103991671A (en) * 2014-06-13 2014-08-20 济钢集团有限公司 Belt replacement device for conveyor
CN107226396A (en) * 2017-07-31 2017-10-03 中铁隧道集团有限公司 A kind of profound tunnel belt quickly retracting device of slagging tap
CN107356303A (en) * 2015-04-13 2017-11-17 钱芳林 A kind of house dedicated water electricity box
CN108423458A (en) * 2018-03-01 2018-08-21 侯如升 A kind of device convenient for winding film
CN112722954A (en) * 2021-01-05 2021-04-30 邯郸钢铁集团有限责任公司 Belt rolling machine
US10994965B2 (en) 2017-01-13 2021-05-04 1246086 Alberta Ltd. Hose-reeling apparatus

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102794623A (en) * 2011-05-27 2012-11-28 五冶集团上海有限公司 Belt collecting device for long belt conveyor and method of application thereof
CN102794623B (en) * 2011-05-27 2016-01-27 五冶集团上海有限公司 For the using method of the belt collecting device of long belt conveyor
CN103010866A (en) * 2012-12-25 2013-04-03 枣庄矿业(集团)有限责任公司田陈煤矿 Belt winch
CN103991671A (en) * 2014-06-13 2014-08-20 济钢集团有限公司 Belt replacement device for conveyor
CN107356303A (en) * 2015-04-13 2017-11-17 钱芳林 A kind of house dedicated water electricity box
CN107356303B (en) * 2015-04-13 2019-09-24 温州涂屋信息科技有限公司 A kind of house dedicated water electricity box
US10994965B2 (en) 2017-01-13 2021-05-04 1246086 Alberta Ltd. Hose-reeling apparatus
CN107226396A (en) * 2017-07-31 2017-10-03 中铁隧道集团有限公司 A kind of profound tunnel belt quickly retracting device of slagging tap
CN108423458A (en) * 2018-03-01 2018-08-21 侯如升 A kind of device convenient for winding film
CN112722954A (en) * 2021-01-05 2021-04-30 邯郸钢铁集团有限责任公司 Belt rolling machine

Similar Documents

Publication Publication Date Title
CN201721989U (en) Leather belt towing coiler
CN205328446U (en) Overhead traveling crane coil of strip safety centre gripping and detection device
CN201148278Y (en) Hydraulic belt winding apparatus
CN102009917B (en) Method for replacing steel wire rope and gantry hook of large-scale bridge crane simultaneously
CN212531757U (en) Wire rewinding machine
CN104326390A (en) Traction device of working tool at high place of power transmission tower
CN113387272A (en) Method for replacing steel wire rope of bridge crane
CN210505295U (en) Feeding device convenient to carry roller bearing
CN204660070U (en) Hot rolling locking coil of strip tie disc device
CN204237495U (en) Transmission tower high-rise working instrument draw gear
CN216265795U (en) Auxiliary equipment for replacing lining plate of rod mill
CN207107907U (en) Automatic de-stacking palletizing apparatus
CN111792500B (en) Method for replacing tail rope of floor type friction hoist
CN211110724U (en) Cable reel hoist and mount conveyer
CN110732629B (en) Full-automatic link-winding and link-dismounting integrated device
CN210596129U (en) Mud gun slewing mechanism replacing device
CN203529722U (en) Special lifting appliance for handling rollers
CN203127828U (en) Device for winding dismantled belt when belt storage bin of belt conveyor is full
CN105033927A (en) Dragging equipment for replacing belt
CN211034673U (en) Full-automatic chain winding machine
CN209871477U (en) Belt tensioning part positioning device of heavy hammer type belt conveyor
CN205917330U (en) Galvanizing unit vertical loop
CN220618257U (en) Bulk loading and lifting device
CN221319078U (en) High altitude electric power overhauls with safe lifting mechanism
CN219408954U (en) Auxiliary tool for replacing steel wire rope of oxygen lance

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110126

Termination date: 20140715

EXPY Termination of patent right or utility model