CN201671389U - Anti-explosion building on fireworks production site - Google Patents

Anti-explosion building on fireworks production site Download PDF

Info

Publication number
CN201671389U
CN201671389U CN2010201760042U CN201020176004U CN201671389U CN 201671389 U CN201671389 U CN 201671389U CN 2010201760042 U CN2010201760042 U CN 2010201760042U CN 201020176004 U CN201020176004 U CN 201020176004U CN 201671389 U CN201671389 U CN 201671389U
Authority
CN
China
Prior art keywords
explosion
workshop
building
shanbao
production site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201760042U
Other languages
Chinese (zh)
Inventor
吴宗伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZUNYI COUNTY WUJIANG FIRECRACKER FACTORY
Original Assignee
ZUNYI COUNTY WUJIANG FIRECRACKER FACTORY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZUNYI COUNTY WUJIANG FIRECRACKER FACTORY filed Critical ZUNYI COUNTY WUJIANG FIRECRACKER FACTORY
Priority to CN2010201760042U priority Critical patent/CN201671389U/en
Application granted granted Critical
Publication of CN201671389U publication Critical patent/CN201671389U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

Disclosed is an anti-explosion building on a fireworks production site. Partition walls are replaced by partition soil forts, multiple rows of partition soil forts built manually and workshop buildings are in staggered arrangement at intervals to form a plane layout structure and are in gridding alternative distribution, each workshop is disposed in a low-lying land between each two partition soil forts, and transport passages are arranged among the rows of partition soil forts. The anti-explosion building thoroughly avoid affecting other workshops when one workshop has accidents, is fine in anti-explosion effect, is absolutely safe, and minimizes loss caused by accidents, and avoids severe consequences that a whole factory is destroyed once one workshop has accidents.

Description

The explosion-proof building of fireworks production site
Technical field
The utility model belongs to the place design field of explosion-proof building, especially produces the explosion-proof building of fireworks production site.
Background technology
Fireworks is inflammable and explosive product; production site there is special requirement; build explosion-proof divider wall at production department and workshop; prevent inflammable and explosive generation; at the explosion time that meets accident, prevent the inflammable and explosive product generation serial blast between other plant area's adjacent vehicles, protect the product and the life safety in other workshops; therefore building explosion-proof divider wall and be very important, also is the necessary condition of safety manufacture supervising department supervision and check production safety.Traditional explosion-proof divider wall all is to build manually with the workshop that the block wall prevents and adjacent serial blast takes place when avoiding accidental explosion in the workshop, only pipe has played certain protective action, but according to various places firecrackers accidental explosion accident takes place, this divider wall can't be accomplished very safe and reliable, because, build cost in order to reduce, can not build explosion-proof divider wall very big, in running into the bigger explosion accident of energy, also have and demolished blast wall and bring disaster to phenomenon between adjacent vehicle.In order to overcome this drawback, present design just addresses this problem completely, we can say accomplish perfectly safe.
Summary of the invention
The purpose of this utility model provides a kind of explosion-proof building of fireworks production site, this technical design scheme is with manually digging the isolation earth bastion of " product " font to replace explosion-proof divider wall, in the calixconcavity ground between earth bastion and the earth bastion production department is set, its horizontally-arranged and vertical row's interleaved " product " font are arranged, the plane of earth bastion is flat long-pending be the workshop 2-4 doubly, appropriate location, earth bastion middle part is provided with lightning-arrest shank, earth bastion offers transport channel between row and row, and transport channel is provided with the sunshade lew of steel frame construction.
Adopt the beneficial effect of the technical program to be, solved a workshop completely and met accident, can not have influence on other workshops, firm firm and solid, anti-flame proof is effective, and it is perfectly safe to accomplish, the loss of accident can be reduced to minimum, avoided a place to meet accident serious consequence that the full factory of accident is annihilated.
Description of drawings
Fig. 1 is the explosion-proof building plane layout structural representation of fireworks production site described in the utility model;
Among the figure: 1-workshop factory building, 2-isolate Tu Shanbao, 3-bank protection fort bank, 4-lightning protection, 5-transport channel.
The specific embodiment
The explosion-proof building of fireworks production site described in the utility model, by shown in Figure 1, its plane figure structure is to isolate native mountain fort 2 by many rows to arrange with workshop factory building 1 interleaved, be provided with transport channel 5 between row and row, make the native mountain of isolation fort 2 latticed spaced apart with 1 one-tenth in workshop factory building, workshop factory building 1 is arranged in the two calixconcavity ground that isolate between the native mountain fort 2, isolates on the native mountain fort 2 being provided with lightning protection 4 at each, each isolate native mountain fort 2 around built bank protection fort bank 3 by laying bricks or stones.Isolate the shared planes of native mountain fort 2 long-pending be the long-pending 2-4 in workshop factory building 1 plane doubly.
Explosion-proof separating building layout is like this accomplished one of them workshop accident that meets accident, and can never involve other workshop factory building, avoids a place to have an accident causing the consequence of full factory destruction, accomplishes loss is dropped to minimum level.

Claims (4)

1. the explosion-proof building of fireworks production site, isolate Tu Shanbao (2) by artificial build and replace divider wall, it is characterized in that: many rows that the plane figure structure is arranged on the place isolate Tu Shanbao (2) and the arrangement of workshop factory building (1) interleaved, making isolation Tu Shanbao (2) become latticed with workshop factory building (1) distributes alternately, workshop factory building (1) is arranged in the two calixconcavity ground that isolate between the Tu Shanbao (2), is provided with transport channel (5) between row and row.
2. according to the explosion-proof building of the fireworks production site of claim 1, it is characterized in that: isolate on Tu Shanbao (2) being provided with lightning protection (4) at each.
3. according to the explosion-proof building of the fireworks production site of claim 1, it is characterized in that: each isolate Tu Shanbao (2) around built bank protection fort bank (3) by laying bricks or stones.
4. according to the explosion-proof building of the fireworks production site of claim 1, it is characterized in that: isolate the shared plane of Tu Shanbao (2) long-pending is the long-pending 2-4 in workshop factory building (1) plane doubly.
CN2010201760042U 2010-04-23 2010-04-23 Anti-explosion building on fireworks production site Expired - Fee Related CN201671389U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201760042U CN201671389U (en) 2010-04-23 2010-04-23 Anti-explosion building on fireworks production site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201760042U CN201671389U (en) 2010-04-23 2010-04-23 Anti-explosion building on fireworks production site

Publications (1)

Publication Number Publication Date
CN201671389U true CN201671389U (en) 2010-12-15

Family

ID=43328801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201760042U Expired - Fee Related CN201671389U (en) 2010-04-23 2010-04-23 Anti-explosion building on fireworks production site

Country Status (1)

Country Link
CN (1) CN201671389U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519958A (en) * 2020-05-08 2020-08-11 李孝斌 Explosion-proof workshop for firework and firecracker production

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519958A (en) * 2020-05-08 2020-08-11 李孝斌 Explosion-proof workshop for firework and firecracker production
CN111519958B (en) * 2020-05-08 2022-07-22 浏阳市达浒花炮艺术焰火燃放集团有限公司 Explosion-proof workshop for producing fireworks and crackers

Similar Documents

Publication Publication Date Title
CN108286920B (en) Implementation method for tunnel blasting and excavation
CN105157493B (en) A kind of explosion expansion tube and blasting method thereof
CN102692164B (en) Stress unloading, water injecting and drilling and blasting method for longitudinal structure surface structural strong rockburst regions
CN103175451A (en) Construction method for controlling blasting through tunnel damping hole
CN101967888A (en) Multidirectional multi-fold blasting method for high-rise building with frame-shear structure
CN102535877A (en) Building blasting demolition method
CN206418618U (en) A kind of protection works antiknock damping three-layer composite structure with crushable backpacking
CN102937399A (en) Stress relief blasting method based on ground stress transient release
Davies Under siege: the Roman field works at Masada
CN103148752B (en) A kind of engineering explosion integrated protection device
CN104064236B (en) Terrace flatly-buried type underground nuclear power station
CN103898842A (en) Blasting demolition method of reinforced concrete arch bridge
CN201671389U (en) Anti-explosion building on fireworks production site
CN108413822B (en) Upward fan-shaped medium-length hole damping blasting method
CN104453999A (en) Water and gas discharging system for construction tunnel
CN205638485U (en) Sectional tunnel lining of fire -resistant type other than ring type
CN102980453B (en) Water injection drilling and blasting method for unloading stress of structural strong rock burst area of horizontal structural surface
CN106285676A (en) Metallurgical underground mine mesopore is without well Cut Blasting system
CN107843160B (en) Detonating network for blasting demolition of reinforced concrete support beam of deep foundation pit
CN208075693U (en) A kind of device for protecting the normal propagation of explosion of Nonel detonator
CN103075936B (en) Rock pillar rockburst step-by-step relief water filling blasting method in deep-buried tunnel penetrating process
CN108195242A (en) A kind of rock-blasting method
CN115288789A (en) Anti-impact distance determination method and system for protecting coal seam roadway in coal pillar
CN110906814A (en) Safe and efficient mining centralized blasting method
CN206832140U (en) A kind of advanced relieving shot structure of ultrahigh stress area country rock

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101215

Termination date: 20120423