CN201649642U CN2009203193424U CN200920319342U CN201649642U CN 201649642 U CN201649642 U CN 201649642U CN 2009203193424 U CN2009203193424 U CN 2009203193424U CN 200920319342 U CN200920319342 U CN 200920319342U CN 201649642 U CN201649642 U CN 201649642U
Authority
CN
China
Prior art keywords
template
steel frame
plates
cast
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203193424U
Other languages
Chinese (zh)
Inventor
唐国成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009203193424U priority Critical patent/CN201649642U/en
Application granted granted Critical
Publication of CN201649642U publication Critical patent/CN201649642U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A combined template for cast-in-place concrete work comprises a faceplate, a steel frame, template plates formed by the connection of cross rib plates and vertical rid plates, and connecting pieces among the template plates. The utility model is characterized in that the connecting parts of the four edges of the steel frame and the edges on the back surface of the faceplate bend inwards to form double layers, and the edges on the back side of the face plate are propped against the double-layered bending part on the steel frame; a round hole for mounting the back ridge and connecting adjacent template plates is formed on the steel frame, the connecting pieces among the template plates are taken as connecting shafts and clamping plates, each clamping plate adopts a wedge structure tapering from top to bottom, a bayonet is formed from the middle part to the bottom part, the connecting shafts pass through the round hole and are inserted into the bayonets of the clamping plates, and the clamping plates are in oblique contact with the head parts of the connecting shafts. The template provided by the utility model is firm and reliable, and has low possibility of deformation, and can save a large number of costs in template reforming and repair. The template plates can be connected firmly through the connecting pieces, so that template expanding and grout leakage can be prevented. The utility model can be widely applied to cast-in-place concrete architectural construction.

Description

Cast-in-situ concrete engineering gang form
Technical field
The utility model relates to a kind of cast-in-situ concrete construction formwork.
Background technology
The existing concrete cast template is to adopt the clean steel plate, forms through crooked, welding processing.Because template is a structure of steel product all, weight is big, and institute thinks weight reduction, adopts very thin steel plate usually, causes the anti-pressure ability of template very little, easy deformation.Need frequent shaping, repairing in the construction, the surcharge height, reserve level is big simultaneously, takies a large amount of purchase expenses.And existing template is behind casting complete, and concrete pouring surface rough surface need be plastered, and is not only time-consuming, also increased engineering cost.
The utility model content
The utility model provides a kind of cast-in-situ concrete engineering gang form, solve existing template life-span weak point, cost of production height, the technical problem that construction effect is bad.
The technical scheme that its technical problem that solves the utility model adopts is:
This cast-in-situ concrete engineering gang form, comprise the template plate that connects into by panel, steel frame, horizontal bar plate and vertical gusset, and the connector between the template plate, it is characterized in that: four limits of steel frame are bilayer bending inwards with junction, back side of panel edge, and the double-deck kink on back side of panel edge and the steel frame offsets;
Be useful on the steel frame back cord and the circular hole that is connected the adjacent forms plate are installed, connector between the template plate is connecting axle and clamp, clamp is up big and down small wedge structure, its middle part has one bayonet socket to the bottom, connecting axle passes circular hole, pegged graft with it by the bayonet socket of clamp, clamp is that the inclined-plane contacts with the connecting axle head again.
Described panel can adopt wood plastic composite or bamboo-plastic composite material.
Described circular hole along the length of steel frame to distributing every tetrad in groups.
The beneficial effects of the utility model are as follows:
Template of the present utility model the double-deck bending of steel, makes the local thickening of material on four steel frames of pump pressure, improve compressive strength, and compressive resistance can reach 4 tons every square metre.Template is firm, solid, not yielding, can save a large amount of template shapings and repair cost.Template is little with the commentaries on classics amount, does not need to buy several times of amount template deposits, has saved a large amount of purchase commoditys.In addition, template surface is very bright and clean, has reached the clear-water concrete standard during cast, has saved the expense of plastering, and has improved speed of application simultaneously.
Panel is used wood plastic composite or bamboo-plastic composite material instead, can save steel, reduces manufacturing cost, and is simultaneously in light weight, can improve large scale ratio in the template piece.In same work progress, the piece number can reduce the assembly unit workload less relatively, and is simple and direct, quick when template is installed, and is the another approach that improves speed of application.
Be distributed with circular hole on the steel frame, be used for installing back cord and connection mode plate.Because the wedge shape clamp is that the inclined-plane contacts with the connecting axle head, has self-locking performance, can be more and more tighter when clenching with hammer, thus connect the template piece very firm, and can prevent the mould that rises, not spillage.
The utility model can be widely used in the cast-in-situ concrete building operations.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the side-looking structural representation of template.
Fig. 2 is the enlarged drawing of the double-deck kink of frame.
The connected mode schematic diagram of Fig. 3 template.
Fig. 4 is the enlarged drawing at Fig. 3 A place.
Fig. 5 is the structural representation of clamp.
Reference numeral: 1-panel, 2-steel frame, the double-deck kink of 3-, 4-horizontal bar plate, 5-circular hole, 6-connecting axle, 7-clamp, the vertical gusset of 8-.
The specific embodiment
Embodiment is referring to Fig. 1, shown in Figure 3, and this cast-in-situ concrete engineering gang form comprises the template plate that is connected into by panel 1, steel frame 2, horizontal bar plate 4 and vertical gusset 8, and the connector between the template plate.Panel 1 can adopt wood plastic composite or bamboo-plastic composite material.
Referring to shown in Figure 1, be useful on the steel frame 2 back cord and the circular hole 5 that is connected the adjacent forms plate be installed, circular hole 5 along the length of steel frame 2 to distribution in groups, every tetrad.
Referring to shown in Figure 2, four limits of steel frame 2 are bilayer bending inwards with panel 1 dorsal edge junction, and the double-deck kink 3 on back side of panel edge and the steel frame offsets.
Shown in Fig. 3-5, the connector between the template plate is connecting axle 6 and clamp 7, and clamp is up big and down small wedge structure, its middle part has a bayonet socket to the bottom, connecting axle 6 passes circular hole 5, is pegged graft with it by the bayonet socket of clamp 7 again, and clamp is that the inclined-plane contacts with the connecting axle head.
Method of attachment of the present utility model is: connecting axle 6 is passed circular hole 5 on the template piece steel frame, expose in another piece template piece steel frame outer end, clamp 7 cards are inserted on the connecting axle locking.

Claims (3)

1. cast-in-situ concrete engineering gang form, comprise the template plate that connects into by panel (1), steel frame (2), horizontal bar plate (4) and vertical gusset (8), and the connector between the template plate, it is characterized in that: four limits of steel frame (2) are bilayer bending inwards with panel (1) dorsal edge junction, and the double-deck kink (3) on back side of panel edge and the steel frame offsets;
Be useful on the steel frame (2) back cord and the circular hole that is connected the adjacent forms plate (5) are installed, connector between the template plate is connecting axle (6) and clamp (7), clamp is up big and down small wedge structure, its middle part has one bayonet socket to the bottom, connecting axle passes circular hole, pegged graft with it by the bayonet socket of clamp, clamp is that the inclined-plane contacts with the connecting axle head again.
2. cast-in-situ concrete engineering gang form according to claim 1 is characterized in that: described panel (1) adopts wood plastic composite or bamboo-plastic composite material.
3. cast-in-situ concrete engineering gang form according to claim 2 is characterized in that: described circular hole (5) along the length of steel frame (2) to distributing every tetrad in groups.
CN2009203193424U 2009-12-31 2009-12-31 Combined template for cast-in-place concrete work Expired - Fee Related CN201649642U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203193424U CN201649642U (en) 2009-12-31 2009-12-31 Combined template for cast-in-place concrete work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203193424U CN201649642U (en) 2009-12-31 2009-12-31 Combined template for cast-in-place concrete work

Publications (1)

Publication Number Publication Date
CN201649642U true CN201649642U (en) 2010-11-24

Family

ID=43114871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203193424U Expired - Fee Related CN201649642U (en) 2009-12-31 2009-12-31 Combined template for cast-in-place concrete work

Country Status (1)

Country Link
CN (1) CN201649642U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074355B (en) * 2014-07-22 2016-06-01 福建安厦新型建筑模板制造有限公司 A kind of piecing assembly formwork steel frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074355B (en) * 2014-07-22 2016-06-01 福建安厦新型建筑模板制造有限公司 A kind of piecing assembly formwork steel frame

Similar Documents

Publication Publication Date Title
CN201635388U (en) Unilateral supporting formwork system for cast-in-place concrete arc outer wall
CN2885991Y (en) All-steel split large formwork
CN101858133B (en) Wall connecting piece of plug-in type low-carbon heat preservation energy-saving board
CN105155836A (en) Aluminum alloy formwork for buildings and method for applying aluminum alloy formwork
CN201649642U (en) Combined template for cast-in-place concrete work
CN102587665B (en) Pouring method of coupled shear wall structure
CN202031344U (en) Multifunctional combined bracket
CN201835522U (en) Steel-and-wood composite beam for molding and supporting reinforced concrete member
CN213062512U (en) Energy-saving assembled building wall
CN209976013U (en) Aluminum alloy plug plate structure of all-steel large template
CN201343827Y (en) Clamping strip and clamping mesh skeleton
CN211775787U (en) Non-standard layer aluminum mould and wood pattern combined node structure
CN210947661U (en) Installation device of socket type overhanging scaffold
CN203361646U (en) Hollow plastic corner sectional material for construction formwork system
CN211396605U (en) Adjustable template reinforcing apparatus
CN209779949U (en) Prefabricated assembled profiled steel sheet concrete shear force wall
CN208815933U (en) FRP new structure for reinforced concrete two-way slab
CN201704931U (en) Cracking-prevention high-strength refractory flue
CN206844632U (en) A kind of aluminum alloy mould plate system panel aluminum profiles
CN216195529U (en) Wallboard of assembled steel-concrete structure
CN215367847U (en) Slot type connection of bamboo column and foundation
CN218912239U (en) Toilet pipe well caisson steel frame structure
CN204850424U (en) Aluminum alloy template
CN217268316U (en) Novel composite aerated concrete plate
CN210767842U (en) Slot type stair wood formwork

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101124