CN201635655U - Side-propping anchor rod-anchor cable construction drill carriage with two movable arms - Google Patents

Side-propping anchor rod-anchor cable construction drill carriage with two movable arms Download PDF

Info

Publication number
CN201635655U
CN201635655U CN201020181992XU CN201020181992U CN201635655U CN 201635655 U CN201635655 U CN 201635655U CN 201020181992X U CN201020181992X U CN 201020181992XU CN 201020181992 U CN201020181992 U CN 201020181992U CN 201635655 U CN201635655 U CN 201635655U
Authority
CN
China
Prior art keywords
oil cylinder
drill
hinged
extension arm
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
CN201020181992XU
Other languages
Chinese (zh)
Inventor
闫振东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ma Xiaoshan
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=43080144&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN201635655(U) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to CN201020181992XU priority Critical patent/CN201635655U/en
Application granted granted Critical
Publication of CN201635655U publication Critical patent/CN201635655U/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a side-propping anchor rod-anchor cable construction drill carriage with two movable arms. The drill carriage mainly comprises a crawler traveling part, a machine body platform, a drill arm part, a hydraulic drilling rig device, a temporary support device and a hydraulic operating system, and is characterized in that the temporary support device comprises a temporary support base, an extension arm, a guard plate, an extension arm oil cylinder and a guard plate oil cylinder; wherein the temporary support base is mounted on the machine body platform; the extension arm is hinged to the temporary support base; the extension arm oil cylinder is hinged on an extension arm seat and the extension arm; the guard plate is hinged at the top end of the extension arm; and the guard plate oil cylinder is hinged on the guard plate and the extension arm. The utility model reduces the labor intensity and the amount of constructers, improves the excavation speed and the operational efficiency, creates a safe operating environment, and is particularly provided with the function of temporary jacking-type support of ultra-high laneways and head-on coal sides of a working face.

Description

The movable two-arm hanging wall anchor rod and anchor cable construction drill carriage
Technical field
The utility model relates to heading equipment under the coal mine, is applicable to large, medium and small moulded coal ore deposit, is to connect to adopt, connect pick, the required top-assisting anchor rod and anchor cable construction machinery in the comprehensive pick various tunnels of construction.
Background technology
At present, the main mode of all kinds of coal mine roadway drivings is adopted, is connected pick and combines pick for connecting, its support pattern is anchor pole, anchor cable, joist, anchor net combination supporting, adopt the monomer rig for top anchor shaft anchor cable construction great majority, the employing crawler-type lifting top and slope bolt and anchor construction drill is also arranged, as China Patent No. be: 200720102731.2 disclosed crawler-type lifting top and slope bolt and anchor construction drills, two drilling apparatus are arranged, an advance support, crawler type walking mechanism, advance support; Walking mechanism is by fluid motor-driven, rigging up platform on the frame of walking mechanism; The front portion of the below track unit of drilling machine platform is equipped with one and is pushed away the coal shovel plate; The advance support that a hydraulic oil cylinder type is housed foremost of platform, a side of advance support is equipped with a hydraulic drill rig that is used for the construction of anchor bar anchor cable; The top-assisting anchor rod and anchor cable construction hydraulic drill rig adopts two columns, and the slideway of move left and right part is contained on two columns, and hydraulic drill rig left or right rotation 30 degree; The hydraulic drill rig that is used for the construction of assisting anchor rod and anchor cable is loaded on drilling machine platform middle part one side, or the side of taking back, or the side that takes over, hydraulic drill rig revolves to the left or to the right and turn 90 degrees, the slideway of arranging before and after on drilling machine platform, being provided with, the column of hydraulic drill rig is seated on the slideway, and is moved forward and backward by the oil cylinder promotion rig integral body that is contained on the drilling machine platform.
There are following problem in this construction machinery and method for the top anchor shaft anchor cable construction adopts the monomer rig:
1, the tunnelling section is little: excavated section is generally at 15M 2About, when head-room surpasses 2 meters, must just can carry out top-assisting anchor rod and anchor cable construction by scaffolding.
2, on-mechanical equalization, the company of employing adopts, connects the mine top anchor shaft anchor cable construction of tunneling process and realized mechanization substantially, adopting the mine top anchor shaft anchor cable construction of combining tunneling process still is monomer rig manual work, and all driving technologies of assisting anchor rod and anchor cable construction all adopt the jackhammer construction, the thrust of perforating derives from people's arm and arm, and worker's labour intensity is big.Because assisting anchor rod and anchor cable construction mainly relies on manpower, the construction quality of assisting anchor rod and anchor cable can not fundamentally be guaranteed.
3, speed of application is slow, and building and remove scaffold when the construction section surpasses 2 meters needs a large amount of time.
4, efficient is low: because perforating quantity is many, the constructor is also many, causes operating efficiency low.
5, safety factor is low: the constructor is staggered operation in the high-altitude, and the job safety environment is poor.
There are following problem in this construction machinery and method for top-assisting anchor rod and anchor cable construction adopts crawler-type lifting top and slope bolt and anchor construction drill:
1, must two complete uses of crawler-type lifting top and slope bolt and anchor rig, what promptly use is each one that the hydraulic drill rig that is used for the construction of assisting anchor rod and anchor cable is loaded on the left and right side of drilling machine platform, the direction of rotation of two hydraulic drill rigs is different.Construct in the both sides that are emitted on the tunnel before and after two crawler-type lifting top and slope bolt and anchor construction drills successively when tunnelling.
2, advance and retreat the machine time long, the back work amount is big.Because during tunneling construction, the two bench drill machines of need drive or withdraw from driving face successively into, add dragging of cable, the time is long, and the back work amount is big.
3, to the complex geological condition bad adaptability.Meet complex geological conditions such as tomography, high gas district, high water aquifer, this drill carriage can not be finished the construction of the pre-gaging hole of gas, drawing-off gas hole, geology detecting hole, vibrations borehole.
4, the construction of anchor bar anchor cable does not reach zero lag, and is unfavorable to the control of lane group.
5, the workload of top-assisting anchor rod and anchor cable construction does not match, and the workload of crown drill is big, and the workload that group bores is little, influences support time, causes personnel's work holdup.
6, constructor's staggered operation in the high-altitude, the job safety environment is poor.
7, personnel selection is many, and two bench drill cars need 8 of manninves.
Summary of the invention
The purpose of this utility model solves the existing top-assisting anchor rod and anchor cable construction machinery of above-mentioned coal mine underground tunneling roadway exactly and has deficiency and problem, a kind of constructor's of reducing labour intensity is provided and reduces the constructor, driving speed and operating efficiency have been improved, create the safety work environment, particularly have superelevation tunnel and the work plane function that coal group carries out top pressing type temporary lining of meeting head on, adopt the full hydraulic system transmission, the movable two-arm hanging wall anchor rod and anchor cable construction drill carriage that explosion-proof performance and security performance are good.
The technical solution of the utility model is to achieve these goals:
The movable two-arm hanging wall anchor rod and anchor cable construction drill carriage comprises track unit, body platform, drill boom part and hydraulic drilling rig device, temporary support device, hydraulic operating system, pump station part and motor; This construction drill carriage has two to overlap independently drill boom part and hydraulic drilling rig device, arranges and be installed in the both sides above the body platform respectively, and hydraulic drilling rig device is loaded on the top of drill boom part, and the centre above the body platform is arranged and be installed in to described temporary support device; It is characterized in that: described temporary support device comprises temporary lining pedestal, cantilever arm, backplate, cantilever arm oil cylinder and backplate oil cylinder; Described temporary lining pedestal is loaded on the body platform, and cantilever arm is hinged on the temporary lining pedestal; Described cantilever arm oil cylinder is hinged on and stretches out on arm seat and the cantilever arm; Described backplate is hinged on the cantilever arm top; Described backplate oil cylinder is hinged on backplate and the cantilever arm.
Transverse plane is equipped with three pipe boxes before the described backplate, inserts steel pipe in pipe box again.
The movable two-arm hanging wall anchor rod and anchor cable construction drill carriage that the utility model provides compared with prior art has outstanding substantive distinguishing features with remarkable beneficial effect to be:
1, the both sides drill boom of this construction drill carriage can be distinguished and outwards swings 42 °, adopts unit integral body more stable, and it is big to adapt to span length, and accommodation is wider, and is safer.
2, two bench drill arms of this construction drill carriage can be constructed simultaneously, have shortened the activity duration greatly, have improved supporting efficient.
3, two 180 ° of oscillating oil cylinders controls are adopted in the rotation of this construction drill carriage, can realize the 180 ° of rotations in all around, use the swing of swing pinion control rig safer, flexible, reliable than crawler-type lifting top and slope bolt and anchor construction drill.
4, the supporting of cantilever arm inclination brace type is adopted in the temporary lining of this construction drill carriage, compares with vertical supporting type, and after temporary lining was regained, the complete machine height reduced significantly, makes drill carriage convenient more in transportation and walking process, and safety is higher.It particularly can satisfy the temporary lining to the superelevation tunnel.
5, the temporary lining of this construction drill carriage not only can be carried out supporting to top board, and drill carriage is when meeting head on to construct to work plane, and temporary lining can be carried out the top pressing type supporting to the work plane coal group that meets head on.
6, the drill boom that can utilize of this construction drill carriage meets head on to carry out perforating perpendicular to work plane, realize the mechanized construction in the pre-gaging hole of gas, drawing-off gas hole, geology detecting hole, and carry out the borehole construction when crossing geological structure, reduced back work amount, service working time and ancillary staff effectively.
7, this construction drill carriage adopts unit two arm support process, article one, the tunnel only need be equipped with the separate unit drill carriage, outfit than crawler-type lifting top and slope bolt and anchor construction drill has reduced one, reduce advance and retreat machine time in the supporting process and the maintenance workload in the maintenance process effectively, reduced the dynamo-electric cost of overhaul.
8, the personnel of determining a post are 4 people in the supporting process of this construction drill carriage, have reduced half than the personnel that determine a post 8 people of crawler-type lifting top and slope bolt and anchor construction drill, reach and increase efficiency by downsizing payrolls, the purpose of high-yield and high-efficiency.
9, anchor bar anchor cable can be constructed simultaneously, and anchor bar anchor cable can reach zero lag, and is highly beneficial to the soft seam driving, can control wall caving effectively, prevents the generation of roof accident, the safety factor height.
10, be highly suitable for combining the pick single entry driving.During single entry driving, the movable two-arm hanging wall anchor rod and anchor cable construction drill carriage is parked in a side in tunnel, and principle is not influence the fully-mechanized digging machine coal cutting; After the fully-mechanized digging machine coal cutting, the machine that moves back is to permanent support, and the movable two-arm hanging wall anchor rod and anchor cable construction drill carriage enters under the empty top and carries out supporting.
11, this construction drill carriage has changed existing company and has adopted, connected two lanes of pick or three lane driving technologies, change connect the method to the place of falling the operation of adopting machine or high-power development machine and roof-bolter as the machine operation method of alternately advancing and retreat into, reduce influence time like this, improved driving speed.
12, environment protecting is good.The hydraulic anchor drill carriage adopts wet drilling, can effectively reduce the harm of dust to the worker, the drill carriage of remote-controlled operation simultaneously; can make the worker avoid the perforating trickle; effectively improve worker's operating environment, reduce anthraco-silicosis and rheumatismal generation, protection worker's physical and mental health.
In a word, movable two-arm hanging wall anchor rod and anchor cable construction drill carriage of the present utility model can improve driving technology level under the existing coal mine, especially for realizing that large, medium and small colliery connects the top-assisting anchor rod and anchor cable construction mechanization of adopting, connecting pick, combine pick, advanced complete technical equipment can be provided, realize safety in production for large, medium and small colliery and created the most basic condition, greatly improve simultaneously resource recovery, can obtain bigger output with the minimum input, comprehensively, system, solved the serious problems that existing driving supporting equipment exists completely.
Description of drawings
Fig. 1 is the front view of movable two-arm hanging wall anchor rod and anchor cable construction drill carriage;
Fig. 2 is the vertical view of movable two-arm hanging wall anchor rod and anchor cable construction drill carriage;
Fig. 3 is a movable two-arm hanging wall anchor rod and anchor cable construction drill carriage drill boom lifting schematic diagram.
Fig. 4 is a temporary lining supported face top board schematic diagram;
Fig. 5 is the temporary lining supported face coal group schematic diagram of meeting head on;
Fig. 6 is the front view of hydraulic drilling rig device;
Fig. 7 is the vertical view of hydraulic drilling rig device.
The specific embodiment
Be elaborated below in conjunction with accompanying drawing:
Fig. 1, shown in Figure 2, movable two-arm hanging wall anchor rod and anchor cable construction drill carriage of the present utility model.It comprises track unit 1, body platform 2, drill boom part 3 and hydraulic drilling rig device 4, temporary support device 5, hydraulic operating system 6, pump station part 7 and motor 8 etc.This construction drill carriage has two to overlap independently drill boom part and hydraulic drilling rig device, arranges and be installed in both sides above the body platform (body platform about) respectively.Hydraulic drilling rig device is loaded on the top of drill boom part.Centre above the body platform (body platform about) is arranged and be installed in to described temporary support device.Described operating system, pump station part and motor etc. are installed in rear portion on the body platform 2.
Fig. 2 and shown in Figure 3, every cover drill boom partly comprise connecting rod 32, drill boom lower link 33, drill boom hoist cylinder 34, drill boom oscillating oil cylinder 35 on drill boom base 30, drill boom seat 31, the drill boom; Described drill boom base is installed on the body platform 2, and the drill boom seat is loaded on the drill boom base by axle; The lower end of connecting rod and drill boom lower link is hinged on the drill boom seat on the described drill boom; Described drill boom hoist cylinder is loaded on drill boom seat and the drill boom on connecting rod or the drill boom lower link; Described drill boom oscillating oil cylinder is loaded on drill boom base and the drill boom seat; Hydraulic drilling rig device is hinged on the upper end of connecting rod on the drill boom or drill boom lower link.
The rise and fall of this hydraulic drilling rig device are finished by the drill boom hoist cylinder, and swinging of connecting rod and drill boom lower link finished by the drill boom oscillating oil cylinder on this hydraulic drilling rig device, the drill boom.
Fig. 4 and shown in Figure 5, temporary support device comprise temporary lining pedestal 500, cantilever arm 501, backplate 502, cantilever arm oil cylinder 503 and backplate oil cylinder 504; Described temporary lining pedestal is loaded on the body platform 2, and cantilever arm is hinged on the temporary lining pedestal, is stretching out hinged cantilever arm oil cylinder between arm seat and the cantilever arm, and cantilever arm hinge with the temporary lining pedestal under the effect of cantilever arm oil cylinder is upwards swung; Backplate is hinged on the cantilever arm top, and hinged backplate oil cylinder between backplate and cantilever arm, backplate with the upwards swing of hinge on cantilever arm top, can be close to level or vertical scar under the effect of backplate oil cylinder.
Transverse plane is equipped with three pipe boxes 505 before the backplate, can insert the steel pipe of suitable length in pipe box, can increase the supporting area of temporary lining.When this construction drill carriage supporting roof, the effect of temporary support device is the supporting roof scar, the horizontal top board scar of being close to of backplate, as shown in Figure 3.
When work plane being met head on carry out the perforating construction, the effect of temporary lining is that work plane is met head on to carry out top pressing type temporary lining at this construction drill carriage, and backplate is vertical configuration and is close to the work plane coal group that meets head on, as shown in Figure 4.
As shown in Figure 6 and Figure 7, the hydraulic drilling rig device on the construction drill carriage has hydraulic drill rig 401 and revolution support; Described revolution support comprises that 402,180 ° of left rotation and right rotation oil cylinders of support 403 and 404,180 ° of tops of the sliding connection plate rotary oil cylinder 405 of left rotation and right rotation oil cylinder and junction plate 406, the rig of top rotary oil cylinder stretch out oil cylinder 407; Plug-in mounting left rotation and right rotation oil cylinder sliding connection plate in the described support, between support and the sliding connection plate rig is installed and stretches out oil cylinder, described left rotation and right rotation oil cylinder is installed on the cylinder body sliding connection plate, the piston of left rotation and right rotation oil cylinder is connected on the junction plate of top rotary oil cylinder, the cylinder body of top rotary oil cylinder is fixed on the rotary oil cylinder junction plate of top, and the piston of top rotary oil cylinder is connected with hydraulic drill rig; The left rotation and right rotation oil cylinder is vertical mutually with the axis of top rotary oil cylinder.Hydraulic drill rig part can make drill bit realize forwards moving, left or right-hand, and the top rotate.
This hydraulic drill rig can be realized forwards, rotation left or right-hand, the top, hydraulic drill rig left or the rotation of right-hand, top finish by 180 ° of left rotation and right rotation oil cylinders 403 and 180 ° of top rotary oil cylinders 405, hydraulic drill rig stretching out forwards stretched out oil cylinder 407 by rig and finished, and hydraulic drill rig integral body can be passed 600mm forward.
Each several parts such as track unit, hydraulic operating system, drill boom part and hydraulic drilling rig device all are to use prior art in the movable two-arm hanging wall anchor rod and anchor cable construction drill carriage of the present utility model, as: track unit is the track unit that adopts engineering machinery, and drill boom part and hydraulic drilling rig device also are prior aries.The utility model mainly this construction drill carriage hydraulic drilling rig device is arranged and temporary support device improves, and has done optimum organization and integrated on the layout.

Claims (2)

1. a movable two-arm hanging wall anchor rod and anchor cable construction drill carriage comprises track unit (1), body platform (2), drill boom part (3) and hydraulic drilling rig device (4), temporary support device (5), hydraulic operating system (6), pump station part (7) and motor (8); This construction drill carriage has two to overlap independently drill boom part and hydraulic drilling rig device, arranges and be installed in the both sides above the body platform respectively, and hydraulic drilling rig device is loaded on the top of drill boom part, and the centre above the body platform is arranged and be installed in to described temporary support device; It is characterized in that described temporary support device comprises temporary lining pedestal (500), cantilever arm (501), backplate (502), cantilever arm oil cylinder (503) and backplate oil cylinder (504); Described temporary lining pedestal is loaded on the body platform, and cantilever arm is hinged on the temporary lining pedestal; Described cantilever arm oil cylinder is hinged on and stretches out on arm seat and the cantilever arm; Described backplate is hinged on the cantilever arm top; Described backplate oil cylinder is hinged on backplate and the cantilever arm.
2. movable two-arm hanging wall anchor rod and anchor cable construction drill carriage according to claim 1 is characterized in that the preceding transverse plane of described backplate is equipped with three pipe boxes (505), inserts steel pipe again in pipe box.
CN201020181992XU 2010-04-20 2010-04-20 Side-propping anchor rod-anchor cable construction drill carriage with two movable arms Ceased CN201635655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020181992XU CN201635655U (en) 2010-04-20 2010-04-20 Side-propping anchor rod-anchor cable construction drill carriage with two movable arms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020181992XU CN201635655U (en) 2010-04-20 2010-04-20 Side-propping anchor rod-anchor cable construction drill carriage with two movable arms

Publications (1)

Publication Number Publication Date
CN201635655U true CN201635655U (en) 2010-11-17

Family

ID=43080144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020181992XU Ceased CN201635655U (en) 2010-04-20 2010-04-20 Side-propping anchor rod-anchor cable construction drill carriage with two movable arms

Country Status (1)

Country Link
CN (1) CN201635655U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832103A (en) * 2010-04-20 2010-09-15 闫振东 Movable two-arm hanging wall anchor rod and anchor cable construction drill carriage
CN109736861A (en) * 2019-01-16 2019-05-10 中国矿业大学(北京) A kind of monorail crane drill carriage and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832103A (en) * 2010-04-20 2010-09-15 闫振东 Movable two-arm hanging wall anchor rod and anchor cable construction drill carriage
CN101832103B (en) * 2010-04-20 2013-06-12 闫振东 Movable two-arm hanging wall anchor rod and anchor cable construction drill carriage
CN109736861A (en) * 2019-01-16 2019-05-10 中国矿业大学(北京) A kind of monorail crane drill carriage and construction method

Similar Documents

Publication Publication Date Title
CN101832102B (en) Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage
CN101832103B (en) Movable two-arm hanging wall anchor rod and anchor cable construction drill carriage
CN201106451Y (en) Track-mounted liftable top-side construction drilling machine for anchor bar and anchor wire
CN101858213B (en) Drilling, loading, transporting and anchoring integrated machine with dual platforms and four arms for coal roadway
CN201826837U (en) Movable double-platform partitioned four-arm drill carriage for construction of hangwall anchor rods and anchor cables
CN102278110A (en) Movable two-arm of lifting platform hanging wall anchor rod and anchor cable construction drill carriage
CN102155219B (en) Comprehensive dredging machine
CN100559013C (en) Tunneling, anchoring and drilling composite machine
CN101169036B (en) Pedrail type lifting top slope anchor shaft anchor cable construction drilling machine and single-alley fast tunneling technique
CN101403302B (en) Pedrail type liftable anchor bar anchor cable construction drill rig and double-lane fast digging technique
CN202023559U (en) Comprehensive dig-anchor machine
CN102704927B (en) Comprehensive mechanization stone drift heading machine set
CN104929517B (en) Full-hydraulic drill type pressure relieving equipment with double drill bits and pressure relieving method
WO2009155776A1 (en) A dilling, loading, transporting and anchoring integration machine for laneway in coal mine
CN104695871A (en) Drilling boom device of two-boom hydraulic rock bolt drilling carriage
CN108868810B (en) Cantilever type tunneling and anchoring integrated machine
CN103899249A (en) Coal mine roadway bottom board anchoring drill carriage
CN202055821U (en) Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform
CN104712333A (en) Large-width one-step roadway formation roadway rapid excavation technology
CN101845952B (en) Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage
CN101781972B (en) Crawler-type lifting top and slope bolt and anchor construction drill
CN201635656U (en) Side-propping anchor rod-anchor cable construction drill carriage with three movable arms
CN206554795U (en) A kind of convertible multi-angle coal mine drilling machine of crawler travel
CN206158574U (en) A portable drilling equipment for combining adopt working face and cross fault
CN111911154B (en) Gantry type tunneling anchor protection robot system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: MA XIAOSHAN

Free format text: FORMER OWNER: YAN ZHENDONG

Effective date: 20140915

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140915

Address after: 048000, No. 5, building No. 84, Tai Ting coal mine, North Stone Town, Jincheng City, Shanxi Province

Patentee after: Ma Xiaoshan

Address before: 048000 Jincheng coal industry group, Shanxi, Jincheng

Patentee before: Yan Zhendong

DD01 Delivery of document by public notice

Addressee: Intermediate people's Court of Taiyuan City, Shanxi Province

Document name: Notice of the state of the case of invalidation

IW01 Full invalidation of patent right

Decision date of declaring invalidation: 20150807

Decision number of declaring invalidation: 26711

Granted publication date: 20101117