CN201635476U
CN201635476U CN2010201421908U CN201020142190U CN201635476U CN 201635476 U CN201635476 U CN 201635476U CN 2010201421908 U CN2010201421908 U CN 2010201421908U CN 201020142190 U CN201020142190 U CN 201020142190U CN 201635476 U CN201635476 U CN 201635476U
Authority
CN
China
Prior art keywords
iron
iron tower
steel
construction
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201421908U
Other languages
Chinese (zh)
Inventor
黄趾成
苏功建
王泽贵
张兴友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Electric Power Transmission & Transformation Construction Co Ltd
State Grid Corp of China SGCC
Original Assignee
Sichuan Electric Power Transmission & Transformation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Electric Power Transmission & Transformation Construction Co Ltd filed Critical Sichuan Electric Power Transmission & Transformation Construction Co Ltd
Priority to CN2010201421908U priority Critical patent/CN201635476U/en
Application granted granted Critical
Publication of CN201635476U publication Critical patent/CN201635476U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model relates to a construction clamp for assembling and erecting an iron tower, consisting of external angle iron and internal angle iron formed by integral steel plates through cold press molding, wherein the external angle iron and the internal angle iron are respectively and correspondingly provided with slotted holes for fixing bolts, the upper end face and the lower end face of the internal angle iron are respectively welded with stiffening plates, a stress plate is welded between the two stiffening plates and positioned on the angle bisector of the internal angle iron, and circular holes used for anchoring are formed on the stress plate. The construction clamp is used in steering, bearing, wire pulling and hoisting systems during the construction of assembling and erecting the iron tower, can improve the stress performance of steel wire ropes anchored on the iron tower, and solves the problem of damages of the steel wire ropes and the angle steel caused by the winding, the binding and the anchoring of the steel wire ropes on angel steel of the iron tower, thus protecting the steel wire ropes and avoiding the damage to the angle steel of he iron tower in the construction.

Description

Iron tower vertical construction anchor clamps
Technical field
The utility model relates to power construction plant technical field, particularly relates to iron tower of power transmission line vertical construction anchor clamps.
Background technology
At present during the iron tower vertical construction, wire rope adopts the wire rope take-up strap to solve on steel tower corner iron in the anchoring on the iron tower, so very easily causes the damage of wire rope and steel tower corner iron, and great safety and hidden danger of quality are arranged.
The utility model content
The purpose of this utility model provides a kind of iron tower vertical construction anchor clamps, to improve the stress performance of wire rope anchoring on iron tower, to solve direct wear problems between wire rope and the iron tower angle bar.
The purpose of this utility model is achieved in that a kind of iron tower vertical construction anchor clamps, form by the outsourcing angle bar and the interior cornerite iron that adopt the cold moudling of monoblock steel plate, on outsourcing angle bar and the interior cornerite iron respectively correspondence be provided with the bolt cylindrical void, be welded with leg-of-mutton stiffener respectively on the upper and lower end face of interior cornerite iron, vertically be welded with stressed plate between two stiffeners, stressed plate is positioned on the angular bisector of cornerite iron, and stressed plate is provided with the anchor connection circular hole.
All be lined with plastic layer on two medial surfaces of above-mentioned outsourcing angle bar and on two lateral surfaces of interior cornerite iron.
The upright special fixture of iron tower group is used for iron tower group upright backguy system, support system, tackling system, turns to stressed system, fundamentally solve the problem that wire rope take-up strap anchoring on steel tower corner iron causes wire rope and angle steel damage, improved the key point stress performance greatly, safety and the quality upright to the iron tower group play a good role, and have also saved the cost of construction greatly.
This novel beneficial effect is:
1, the utility model anchor clamps outsourcing angle bar and inner angle bar adopt the cold moudling of monoblock steel plate, efficiently solve the problem of wide restriction of leg of angle (when the steel tower corner iron specification was big, the existing angle steel possibility of employing width was just not enough) and minimizing pad.
2, this novel clamp stiffener and main stress plate select for use the Q420 steel to improve the weight that is subjected to force intensity and has alleviated anchor clamps.
3, this novel clamp inboard is lined with engineering plastic, efficiently solves in the use damage to the iron tower angle bar.
Description of drawings
Fig. 1 is this novel stereogram.
The specific embodiment
Fig. 1 illustrates, this novel outsourcing angle bar 1 and interior cornerite iron 2 by the cold moudling of employing monoblock steel plate is formed, on outsourcing angle bar and the interior cornerite iron respectively correspondence be provided with bolt with cylindrical void 1a, 2a, (be contiguous upper and lower end face among the figure on the interior cornerite iron 2 upper and lower end faces; Also can directly stiffener be welded on its upper and lower end) be welded with leg-of-mutton stiffener 4,5 respectively, be welded with stressed plate 3 between two stiffeners, stressed plate is positioned on the angular bisector of cornerite iron, and stressed plate is provided with the anchor connection circular hole, but socket slip ring 6 in the circular hole.All be lined with plastic layer on two medial surfaces of outsourcing angle bar 1 and on two lateral surfaces of interior cornerite iron 2.
Embodiment: outsourcing angle bar thickness is 8mm, and length is 270mm, highly is 150mm, and screwhole diameter is 21.5mm.Interior cornerite iron thickness is 10mm, and length is 250mm, highly is 150mm, and screw can freely be adjusted for circle runway shape.Be 10mm with steel (the being stressed plate) thickness of interior cornerite iron welding, middle anchor connection circular hole, Circularhole diameter is 27.5mm.
During construction, adopt bolt with outsourcing angle bar and interior cornerite ferropexy on steel tower corner iron, the wire rope of backguy system, support system, steering or the tackling system of iron tower vertical construction encircles by " U " shape and is connected anchor connection with on the circular hole.
These anchor clamps improve the upright stressed system of iron tower group, effectively promote the safety and the quality of iron tower vertical construction.These anchor clamps are widely used in that the iron tower vertical construction turns to, in the support, backguy, tackling system.

Claims (2)

1. iron tower vertical construction anchor clamps, it is characterized in that: form by the outsourcing angle bar (1) and the interior cornerite iron (2) that adopt the cold moudling of monoblock steel plate, on outsourcing angle bar and the interior cornerite iron respectively correspondence be provided with bolt with cylindrical void (1a, 2a), be welded with leg-of-mutton stiffener (4,5) on the upper and lower end face of interior cornerite iron (2) respectively, be welded with stressed plate (3) between two stiffeners, stressed plate is positioned on the angular bisector of cornerite iron, and stressed plate is provided with the anchor connection circular hole.
2. according to the described iron tower vertical construction of claim 1 anchor clamps, it is characterized in that: all be lined with plastic layer on two medial surfaces of described outsourcing angle bar (1) and on two lateral surfaces of interior cornerite iron (2).
CN2010201421908U 2010-03-26 2010-03-26 Construction clamp for assembling and erecting iron tower Expired - Lifetime CN201635476U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201421908U CN201635476U (en) 2010-03-26 2010-03-26 Construction clamp for assembling and erecting iron tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201421908U CN201635476U (en) 2010-03-26 2010-03-26 Construction clamp for assembling and erecting iron tower

Publications (1)

Publication Number Publication Date
CN201635476U true CN201635476U (en) 2010-11-17

Family

ID=43079964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201421908U Expired - Lifetime CN201635476U (en) 2010-03-26 2010-03-26 Construction clamp for assembling and erecting iron tower

Country Status (1)

Country Link
CN (1) CN201635476U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619377A (en) * 2012-04-13 2012-08-01 四川电力送变电建设公司 Improved auxiliary holding pole fixing base
CN103046793A (en) * 2011-10-17 2013-04-17 上海欣影电力科技发展有限公司 Fixing device used for installing device on power transmission iron tower
CN103618253A (en) * 2013-11-29 2014-03-05 国家电网公司 Steering combination device for iron tower operation
CN103938913A (en) * 2013-10-29 2014-07-23 国家电网公司 Device for correcting inclined iron transmission tower of double combined angle steel main material
CN105401779A (en) * 2015-11-27 2016-03-16 浙江省送变电工程公司 Special lifting device for main tube of steel tube tower
CN106285176A (en) * 2015-12-31 2017-01-04 国家电网公司 Steel tower tower leg adjustable clamp
CN110748182A (en) * 2019-10-30 2020-02-04 青海送变电工程有限公司 A formula safety device that can take up for iron tower assemblage
CN112922385A (en) * 2021-04-01 2021-06-08 大连理工大学 Porous steel-clad transmission tower main material uninterrupted power reinforcing device
CN115434558A (en) * 2022-10-12 2022-12-06 国网四川电力送变电建设有限公司 Experimental tool for turning pulley of tower leg of suspension holding pole group

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046793A (en) * 2011-10-17 2013-04-17 上海欣影电力科技发展有限公司 Fixing device used for installing device on power transmission iron tower
CN103046793B (en) * 2011-10-17 2015-06-24 上海欣影电力科技股份有限公司 Fixing device used for installing device on power transmission iron tower
CN102619377B (en) * 2012-04-13 2014-05-07 四川电力送变电建设公司 Improved auxiliary holding pole fixing base
CN102619377A (en) * 2012-04-13 2012-08-01 四川电力送变电建设公司 Improved auxiliary holding pole fixing base
CN103938913A (en) * 2013-10-29 2014-07-23 国家电网公司 Device for correcting inclined iron transmission tower of double combined angle steel main material
CN103618253B (en) * 2013-11-29 2016-07-06 国网辽宁省电力有限公司朝阳供电公司 Iron tower operation turns to combination unit
CN103618253A (en) * 2013-11-29 2014-03-05 国家电网公司 Steering combination device for iron tower operation
CN105401779A (en) * 2015-11-27 2016-03-16 浙江省送变电工程公司 Special lifting device for main tube of steel tube tower
CN106285176A (en) * 2015-12-31 2017-01-04 国家电网公司 Steel tower tower leg adjustable clamp
CN110748182A (en) * 2019-10-30 2020-02-04 青海送变电工程有限公司 A formula safety device that can take up for iron tower assemblage
CN112922385A (en) * 2021-04-01 2021-06-08 大连理工大学 Porous steel-clad transmission tower main material uninterrupted power reinforcing device
CN115434558A (en) * 2022-10-12 2022-12-06 国网四川电力送变电建设有限公司 Experimental tool for turning pulley of tower leg of suspension holding pole group
CN115434558B (en) * 2022-10-12 2023-08-25 国网四川电力送变电建设有限公司 Tool for suspension pole group tower leg steering pulley experiment

Similar Documents

Publication Publication Date Title
CN201635476U (en) Construction clamp for assembling and erecting iron tower
CN103388408B (en) A kind of building structure external prestressing muscle reinforces steering block
CN201128880Y (en) Hold hoops and support integrated structure for circular single pier
CN202686697U (en) Reinforced type anchor chain end shackle
CN213204240U (en) Tower foot reinforcing apparatus suitable for tee pipe tower and four-pipe tower
CN101736751A (en) Connecting structure between wind measurement tower and pile foundation of offshore wind power station
CN103407904A (en) Hoop type wall-attached connection piece for tower crane and construction method thereof
CN203159027U (en) A prefabricated iron tower foundation spreader
CN202519621U (en) Steel hoop used for suspending support system
CN207048185U (en) A kind of Flat shape anchor tie-plate
CN203158194U (en) Bundling device for water transportation of transformer
CN201713940U (en) Steel column base structure
CN201794072U (en) Anchor rod with compound function and used for scaffold
CN101942835B (en) Heavy-load composite function anchoring device for scaffold
CN201250516Y (en) Single-side wall mould holder strengthening device
CN210396223U (en) Photovoltaic power plant shaft tower reinforcing apparatus
CN101240661A (en) Large steel girder member bar turning device and its member bar turning method
CN103216013A (en) Hinged joint device for stay bar end welding plate type large rotation angle ball
CN211521328U (en) Fixing device for ash sliding pipe of deep shaft
CN104386576B (en) A kind of cable crane Universal rotary Suspension hook structure
CN208857835U (en) A kind of auxiliary reinforcing device of power transmission tower foundation bolt
CN202689567U (en) Pump pipe handrail for concrete pouring
CN201296902Y (en) Bearing anchor ear
CN203593526U (en) Movable type hoisting device
CN203006796U (en) Embrace hoop type wall-attached connecting piece used for tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20131227

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20131227

Address after: 610051 No. 2 South Branch Road, Chenghua District, Sichuan, Chengdu

Patentee after: Sichuan Electric Power Transmission & Transformation Construction Co., Ltd.

Patentee after: State Grid Corporation of China

Address before: 610051 Chenghua District, Chengdu, Cui Cui shop north road, No. 1, No. 6, Sichuan

Patentee before: Sichuan Electric Power Transmission & Transformation Construction Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20101117

CX01 Expiry of patent term