CN201627360U - Turnover formwork construction device - Google Patents

Turnover formwork construction device Download PDF

Info

Publication number
CN201627360U
CN201627360U CN201020160442XU CN201020160442U CN201627360U CN 201627360 U CN201627360 U CN 201627360U CN 201020160442X U CN201020160442X U CN 201020160442XU CN 201020160442 U CN201020160442 U CN 201020160442U CN 201627360 U CN201627360 U CN 201627360U
Authority
CN
China
Prior art keywords
formwork
construction device
concrete
curved
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201020160442XU
Other languages
Chinese (zh)
Inventor
徐志国
孙昌忠
詹剑霞
朱俊杰
杨志书
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gezhouba Dam Xinjiang Engineering Bureau (limited)
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN201020160442XU priority Critical patent/CN201627360U/en
Application granted granted Critical
Publication of CN201627360U publication Critical patent/CN201627360U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a turnover formwork construction device, and relates to a building concrete curved-surface forming construction device. A curved-surface formwork is connected with pluralities of supporting strips and provided with steel tube sample shelf, the steel tube sample shelf and the curved-surface formwork are connected with pluralities of tension bars, and a plastering platform is disposed above the steel tube sample shelf and connected with the same. By means of setting up the plastering platform on the curved-surface formwork and matching the easily detached curved-surface formwork, the steel tube sample shelf and the tension bars, the circular-arc formwork and the steel tube sample shelf are conveniently sequentially detached to plaster when concrete is nearly pre-hardened and has certain strength, thereby being capable of guaranteeing form and appearance quality of curve-surfaced concrete. In addition, the turnover formwork construction device is extremely suitable for tunnel lining with severe requirements to concrete surfaces, such as derivation tunnels, tailrace tunnels and the like of hydropower stations.

Description

The over-form construction device
Technical field
The utility model relates to a kind of building concrete curved surface forming construction equipment, particularly a kind of over-form construction device.
Background technology
It is in old concrete face mounting template that present curved surface is built, concreting then, concreting is finished and is reached stripping construction equipment after certain length of time, but mass defects such as bubble is many, faulting of slab ends, sand line appear in concrete surface that this only master plate is built easily.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of over-form construction device, can guarantee to build the concrete surface that finishes and not have mass defects such as bubble, faulting of slab ends and sand line, reduces later stage concrete surface work of treatment amount, guarantees Surface Quality of Concrete.
For solving the problems of the technologies described above, the technical scheme that the utility model adopted is: a kind of over-form construction device, and circular formwork is connected with many support bars, and circular formwork is provided with steel pipe sample frame, and steel pipe sample frame is connected with many tie rods with circular formwork; Steel pipe sample frame top is provided with the platform of wiping one's face, and the platform of wiping one's face is connected with steel pipe frame.
Described circular formwork is provided with elongated feed opening and interval feed opening.
In the described tie rod, dowel is connected with sleeve bolt.
A kind of over-form construction device that the utility model provides, set up the platform of wiping one's face by adopting on the circular formwork, and cooperate easily detachable circular formwork, steel pipe sample frame and tie rod, can be easily remove the construction of wiping one's face of circle curve template and steel pipe sample frame successively near initial set and when certain intensity is arranged, thereby can guarantee concrete build of curved surface and curved surface Surface Quality of Concrete at concrete.Be fit to very much the tunnel lining strict, for example diversion tunnel in power station, tailwater tunnel etc. to concrete surface.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples: Fig. 1 is a structural representation of the present utility model.
The specific embodiment
In Fig. 1, a kind of over-form construction device, circular formwork 2 is connected with many support bars 6, and circular formwork 2 is provided with steel pipe sample frame 4, and steel pipe sample frame 4 is connected with many tie rods 8 with circular formwork 2; Circular formwork 2 and steel pipe sample frame 4 can be dismantled easily.
Steel pipe sample frame 4 tops are provided with the platform 3 of wiping one's face, and the platform 3 of wiping one's face is connected with steel pipe frame 1.
Described circular formwork 2 is provided with elongated feed opening 5 and interval feed opening 7.
In the described tie rod 8, dowel is connected with sleeve bolt.One end of dowel is provided with screw thread and is connected with sleeve bolt, and sleeve bolt is connected with circular formwork 2, and this connected mode has been guaranteed can dismantle circular formwork 2 and sleeve bolt easily when concrete initial set, is convenient to the construction of next step operation.
Embodiment: adopt 2 constructions of typing circular formwork, laterally waling is arc Φ 32 reinforcing bars, and vertically waling is φ 48 * 3.5mm steel pipe; The steel pipe sample frame 4 of control concrete surface build and support shuttering is set above the circular formwork 2; Circular formwork 2 takes inner tie rod 8 and inner support bar 6 to reinforce, support bar 6 is the center of circle with the central point of tunnel, and at a distance of 15 ° of installations, tie rod 8 adopts buries dowel underground as fixed point, dowel one end is provided with screw thread and is connected with sleeve bolt, and sleeve bolt is connected with circular formwork 2.
Receive storehouse face 30cm apart from concrete and set up the platform 3 of wiping one's face, the platform 3 of wiping one's face adopts steel pipe or arch steel to set up, and is connected with steel pipe frame 1.
In the middle of circular formwork 2, reserve elongated feed opening 5, at the middle prepared separation feed opening 7 of reserving elongated feed opening 5 both sides circular formworks 2, after building, remove the construction of wiping one's face of circular formwork 2 and steel pipe sample frame 4 successively near initial set and when certain intensity is arranged at concrete.Adopt the concrete surface of the utility model construction not have mass defects such as bubble, faulting of slab ends and sand line, reduce later stage concrete surface work of treatment amount, guarantee Surface Quality of Concrete.Be fit to the tunnel lining strict, for example diversion tunnel in power station, tailwater tunnel etc. to concrete surface.

Claims (3)

1. over-form construction device, it is characterized in that: circular formwork (2) is connected with many support bars (6), and circular formwork (2) is provided with steel pipe sample frame (4), and steel pipe sample frame (4) is connected with many tie rods (8) with circular formwork (2);
Steel pipe sample frame (4) top is provided with the platform of wiping one's face (3), and the platform of wiping one's face (3) is connected with steel pipe frame (1).
2. a kind of over-form construction device according to claim 1 is characterized in that: described circular formwork (2) is provided with elongated feed opening (5) and interval feed opening (7).
3. a kind of over-form construction device according to claim 1 is characterized in that: in the described tie rod (8), dowel is connected with sleeve bolt.
CN201020160442XU 2010-04-15 2010-04-15 Turnover formwork construction device Expired - Lifetime CN201627360U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020160442XU CN201627360U (en) 2010-04-15 2010-04-15 Turnover formwork construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020160442XU CN201627360U (en) 2010-04-15 2010-04-15 Turnover formwork construction device

Publications (1)

Publication Number Publication Date
CN201627360U true CN201627360U (en) 2010-11-10

Family

ID=43058751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020160442XU Expired - Lifetime CN201627360U (en) 2010-04-15 2010-04-15 Turnover formwork construction device

Country Status (1)

Country Link
CN (1) CN201627360U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296807A (en) * 2011-06-27 2011-12-28 中国葛洲坝集团股份有限公司 Portable slip form for circular-arc-shaped tube/groove concrete bottom plate
CN102561694A (en) * 2011-12-29 2012-07-11 山西四建集团有限公司 Construction method for support mould with large-curvature spherical concrete structure
PT105804B (en) * 2011-07-08 2013-07-12 Arsenio Baptista Vidal Pe-Curto AUTO-TREPANTE CURVILIENT COVERAGE SYSTEM

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296807A (en) * 2011-06-27 2011-12-28 中国葛洲坝集团股份有限公司 Portable slip form for circular-arc-shaped tube/groove concrete bottom plate
CN102296807B (en) * 2011-06-27 2013-06-05 中国葛洲坝集团股份有限公司 Portable slip form for circular-arc-shaped tube/groove concrete bottom plate
PT105804B (en) * 2011-07-08 2013-07-12 Arsenio Baptista Vidal Pe-Curto AUTO-TREPANTE CURVILIENT COVERAGE SYSTEM
CN102561694A (en) * 2011-12-29 2012-07-11 山西四建集团有限公司 Construction method for support mould with large-curvature spherical concrete structure
CN102561694B (en) * 2011-12-29 2014-01-15 山西四建集团有限公司 Construction method for support mould with large-curvature spherical concrete structure

Similar Documents

Publication Publication Date Title
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN201666157U (en) Inverted arch integral type moving die carrier
CN204357127U (en) The monolateral formwork erecting structure of a kind of ultra-deep pre-buried Screw arbor with nut at both-ends of outer wall of basement narrow space
CN201627360U (en) Turnover formwork construction device
CN204098486U (en) The concrete of building basement roof ater-casting hangs mould
CN103321423A (en) Cast-in-place concrete stair construction method
CN203022222U (en) Wholly-cast ring beam of brick-concrete building support
CN203835403U (en) Clearance strengthening system for serious cracking of existing tunnel lining arch
CN203889454U (en) Integrated moving device of construction formwork of culvert wall
CN203755678U (en) Upper suspension hoisting type hoisting device for reinforced concrete floor construction
CN203755715U (en) Wall underpinning structure
CN204139466U (en) A kind of concrete prefabricated cushion block
CN204662369U (en) A kind of slope cantilever large form
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation
CN103056957A (en) Reinforced concrete precast column vertical type prefabrication method
CN204531405U (en) A kind of traveling formwork device being convenient to the cleaning of stair construction joint position
CN105604339A (en) Secondary structure column reinforcing method
CN104141321A (en) Basement side wall late poured band blocking method and used blocking steel plate
CN202299421U (en) Inner support for controlling width of concrete beam or wallboard template
CN204080820U (en) A kind of concrete structure foundation ditch support replacement device
CN210659296U (en) Pouring funnel
CN105317216A (en) Wall body reversed construction method and wall body and concrete framework casting structure
CN103046678A (en) Method for constructing BDF (building distribution frame) hollow floorslab
CN201762890U (en) Positioning strip for steel bar and template of reinforced concrete wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GEZHOUBA XINJIANG ENGINEERING CO., LTD.

Free format text: FORMER OWNER: CHINA GEZHOUBA GROUP CO., LTD.;SANXIA UNIVERSITY

Effective date: 20110429

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 443002 NO. 1, QINGBO ROAD, YICHANG CITY, HUBEI PROVINCE TO: 830049 NO. 918, XINHUA SOUTH ROAD

TR01 Transfer of patent right

Effective date of registration: 20110429

Address after: 830049 Xinhua South Road, No. 918

Patentee after: Gezhouba Dam Xinjiang Engineering Bureau (limited)

Address before: 443002 Hubei province Yichang City Road No. 1

Patentee before: China Gezhouba Group Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20101110

CX01 Expiry of patent term