CN201620413U - Composite foundation with PTC perforated tubular piles with caps - Google Patents

Composite foundation with PTC perforated tubular piles with caps Download PDF

Info

Publication number
CN201620413U
CN201620413U CN2010201075731U CN201020107573U CN201620413U CN 201620413 U CN201620413 U CN 201620413U CN 2010201075731 U CN2010201075731 U CN 2010201075731U CN 201020107573 U CN201020107573 U CN 201020107573U CN 201620413 U CN201620413 U CN 201620413U
Authority
CN
China
Prior art keywords
ptc
pile
tubular piles
caps
perforated tubular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201075731U
Other languages
Chinese (zh)
Inventor
雷金波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanchang Hangkong University
Original Assignee
Nanchang Hangkong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanchang Hangkong University filed Critical Nanchang Hangkong University
Priority to CN2010201075731U priority Critical patent/CN201620413U/en
Application granted granted Critical
Publication of CN201620413U publication Critical patent/CN201620413U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a composite foundation with PTC perforated tubular piles with caps, comprising PTC perforated tubular piles with through holes and pile caps. The composite foundation with the PTC perforated tubular piles with the caps is characterized in that the top ends of the PTC perforated tubular piles provided with the through holes are connected with the pile caps, and the external surfaces of the pile caps are cushioned with broken stones to form a broken stone cushion layer. The composite foundation with the PTC perforated tubular piles with the caps has the advantages that the PTC tubular piles are adopted in order to utilize the water collecting function of cavities of the tubular piles, and the squeezing effect of adjacent piles can be effectively reduced during the construction of the perforated tubular piles, thereby cleaning the environment; and the perforated tubular piles also have the advantage of saving energy.

Description

Band cap PTC type perforated pipe pile composite foundation
Technical field
The utility model relates to a kind of pipe pile composite foundation, relates in particular to a kind of band cap PTC type perforated pipe pile composite foundation.
Background technology
At present during the existing pipes pile driving construction, particularly the hammer piling mode produces soil compaction effect and excess pore water pressure, very easily causes adjacent stake skew, even broken pile.PTC type pile tube is used for the deep soft soil foundation treatment project, and main purpose is the distortion of control foundation settlement, improves bearing capacity of foundation soil, and pile tube self bearing capacity is not a subject matter.The main cause that the foundation settlement distortion produces is because the discharge of soil body mesopore water under the outer load effect.For deep soft soil foundation engineerings such as speedway, high-speed railway, road in airport, control its foundation settlement distortion, mainly be meant the control settlement amount after construction, be that its settlement amount after construction is controlled in the critical field.If produce more settling amount as far as possible in construction periods such as embankment, dykes and dams, promptly produce the foundation settlement deflection of construction period, with the discharge as much as possible of native mesopore water, reduce the water content of soil, then its settlement amount after construction will be reduced and will be controlled in the critical field of settlement amount after construction, reach processing intent.Because the native rigidity of stake differs greatly, causes a top stress too concentrated easily, thrusts distortion in the generation, forms native doming effect.
Summary of the invention
The purpose of this utility model is to provide a kind of band cap PTC type perforated pipe pile composite foundation, this composite foundation is provided with pile cover, with homogenizing stake top stress, thrust distortion on reducing, certain thickness rubble mattress layer (can add steel mesh reinforcement) is set on pile cover again, forms band cap PTC type perforated pipe pile composite foundation.
The utility model is achieved like this, it includes PTC pile tube, pile cover to perforation, it is characterized in that having the top to the PTC pile tube of perforation to be connected with pile cover, and the pile cover external surface is lined with rubble and forms hardcore bed.
Be connected with steel mesh reinforcement in the described pile cover.
Described by the PTC pile tube of boring a hole is formed by the cylindrical tube pile lining with to perforation, the cylindrical tube pile lining has several from top to bottom to perforation.
Technique effect of the present utility model is: adopting the PTC pile tube that has perforation is the polywater effect that utilizes the pile tube cavity, can effectively reduce adjacent stake soil compaction effect during the ported sub pile driving construction, cleaning ambient; Pile tube with holes also has energy-conservation advantage.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the sectional drawing of the utility model to perforation PTC pile tube.
In the drawings, 1, have PTC pile tube 2 to perforation, pile cover 3, steel mesh reinforcement 4, cylindrical tube pile lining 5, to bore a hole 6, rubble
The specific embodiment
As shown in Figure 1, have the top of PTC pile tube 1 to perforation to be connected with pile cover 2, pile cover 2 external surfaces are lined with rubble 6 and form hardcore beds.Have the pile tube diameter of PTC pile tube of perforation is selected for use 450mm, as shown in Figure 2,5 form by cylindrical tube pile lining 4 with to boring a hole by PTC pile tube 1 perforation, cylindrical tube pile lining 4 has several from top to bottom to boring a hole 5, every linear meter(lin.m.) is provided with 2 to perforation, pile cover size 1.5m * 1.5m * 0.4m, and the pile cover arrangement of reinforcement designs by the steel concrete requirement, in order to strengthen pile cover intensity, can in pile cover 2, establish steel mesh reinforcement 3.During construction, be provided with PTC pile tube 1 in the soft foundation to perforation, no matter be in the construction period, still in the construction intermittent phase, generation, development and dissipation along with excess pore water pressure, water in soil can enter to the perforation PTC pile tube 1 in, if having to the perforation 1 week of PTC pile tube run into the mucky soil environment, also can by to bore a hole 5 enter to the perforation PTC pile tubes 1 in.If water is many in the construction period hole, then can take the mode of drawing water that it is got rid of.Along with water level in the hole reduces, water in soil can infiltrate in the pile tube again, makes the water content of soil be able to further reduction, and the shear strength of soil improves, and bearing capacity of foundation soil strengthens.

Claims (3)

1. band cap PTC type perforated pipe pile composite foundation, it includes PTC pile tube, pile cover to perforation, it is characterized in that having the top to the PTC pile tube of perforation to be connected with pile cover, and the pile cover external surface is lined with rubble and forms hardcore bed.
2. band cap PTC type perforated pipe pile composite foundation according to claim 1 is characterized in that being connected with steel mesh reinforcement in the described pile cover.
3. band cap PTC type perforated pipe pile composite foundation according to claim 1 is characterized in that describedly being made up of by the cylindrical tube pile lining with to perforation the PTC pile tube to perforation, and the cylindrical tube pile lining has several from top to bottom to boring a hole.
CN2010201075731U 2010-02-03 2010-02-03 Composite foundation with PTC perforated tubular piles with caps Expired - Fee Related CN201620413U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201075731U CN201620413U (en) 2010-02-03 2010-02-03 Composite foundation with PTC perforated tubular piles with caps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201075731U CN201620413U (en) 2010-02-03 2010-02-03 Composite foundation with PTC perforated tubular piles with caps

Publications (1)

Publication Number Publication Date
CN201620413U true CN201620413U (en) 2010-11-03

Family

ID=43023869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201075731U Expired - Fee Related CN201620413U (en) 2010-02-03 2010-02-03 Composite foundation with PTC perforated tubular piles with caps

Country Status (1)

Country Link
CN (1) CN201620413U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103074889A (en) * 2013-01-27 2013-05-01 西安科技大学 Flexible pile cap for composite foundation
CN103711139A (en) * 2012-09-29 2014-04-09 上海中技桩业股份有限公司 Semi-rigid connection structure between pile foundation and bearing platform
CN104695424A (en) * 2015-03-18 2015-06-10 烟台建华管桩有限公司 Prefabricated hollow pile cap for composite foundation and fixing method thereof
CN106869112A (en) * 2017-03-24 2017-06-20 安徽省建筑科学研究设计院 A kind of reinforced PTC perforated pipes stake

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711139A (en) * 2012-09-29 2014-04-09 上海中技桩业股份有限公司 Semi-rigid connection structure between pile foundation and bearing platform
CN103074889A (en) * 2013-01-27 2013-05-01 西安科技大学 Flexible pile cap for composite foundation
CN103074889B (en) * 2013-01-27 2014-08-13 西安科技大学 Flexible pile cap for composite foundation
CN104695424A (en) * 2015-03-18 2015-06-10 烟台建华管桩有限公司 Prefabricated hollow pile cap for composite foundation and fixing method thereof
CN104695424B (en) * 2015-03-18 2016-08-31 建华建材(莱阳)有限公司 Composite foundation Prefabricated hollow pile pile cover and fixing means thereof
CN106869112A (en) * 2017-03-24 2017-06-20 安徽省建筑科学研究设计院 A kind of reinforced PTC perforated pipes stake

Similar Documents

Publication Publication Date Title
CN101343874B (en) Method for processing foundation by wrapping piles in salty soil area
CN201620413U (en) Composite foundation with PTC perforated tubular piles with caps
CN202117068U (en) Micropile plate-type composite foundation
CN106759446A (en) A kind of hollow digging foundation of root keyed for transmission line of electricity
CN104846809A (en) Prefabricated tubular pile capable of draining water and increasing frictional resistance and construction method thereof
CN101775803A (en) Mushroom-shaped mixed composite pile capable of effectively controlling settlement and construction method
CN203238642U (en) Supporting retaining wall of foundation pit
CN203977409U (en) A kind of prefabricated assembled concrete pile foundation
CN201347558Y (en) Ring-shaped bracing structure system of deep and large foundation pit
CN201212151Y (en) Retaining wall foundation structure
CN106337408A (en) Construction method of crushed stone and compacting pile composite foundation
CN202359565U (en) Steel sheet pile cofferdam structure
CN214657188U (en) Gravity foundation for reinforcing soft soil foundation by offshore wind power cemented gravel pile
CN202787275U (en) Tubular soil nailing wall of novel pneumatic impact anchor
CN202482886U (en) Cast-in-place pile steel reinforcement cage for ultra-thick high compression peat soil layer structure
CN204000846U (en) Floral tube slip casting uplift pile
CN202090334U (en) Capped two-way-perforated PTC tubular pile composite foundation
CN201162226Y (en) Ground strengthening structure for preventing deformation destruction of rigid pile in soft ground
CN203639900U (en) Hollow pile
CN202482847U (en) Conical tubular pile with starlike perforated holes
CN103835290A (en) Pile foundation structure suitable for marine soft soil and design method thereof
CN206829168U (en) A kind of hollow digging foundation of root keyed for transmission line of electricity
CN202090335U (en) Two-way paired perforation hole tubular pile
CN202347527U (en) Capped PTC (prestressed tubular concrete) type asymmetric two-way perforated pipe pile composite foundation
CN104452737B (en) A kind of soft base fast processing constructional method of dyke

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101103

Termination date: 20120203