CN201605661U - Concretion connecting structure of supporting structure and later concrete pouring beam - Google Patents

Concretion connecting structure of supporting structure and later concrete pouring beam Download PDF

Info

Publication number
CN201605661U
CN201605661U CN2009203142757U CN200920314275U CN201605661U CN 201605661 U CN201605661 U CN 201605661U CN 2009203142757 U CN2009203142757 U CN 2009203142757U CN 200920314275 U CN200920314275 U CN 200920314275U CN 201605661 U CN201605661 U CN 201605661U
Authority
CN
China
Prior art keywords
concrete beam
steel
supporting construction
supporting structure
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203142757U
Other languages
Chinese (zh)
Inventor
刘宜江
邓中华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2009203142757U priority Critical patent/CN201605661U/en
Application granted granted Critical
Publication of CN201605661U publication Critical patent/CN201605661U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a concretion connecting structure of a supporting structure and a later concrete pouring beam, which comprises the supporting structure (1) and the later concrete pouring beam (4), wherein a buried plate (2) is pre-cast in the supporting structure (1); a steel bracket (3) is welded on the buried plate (2); and longitudinal bars of the concrete beam (4) are anchored on the steel bracket (3) by welding. The steel plate is pre-cast in the supporting structure, the steel bracket is welded on the steel plate, and the longitudinal bars of the concrete beam are anchored on the steel bracket by welding, therefore, the steel bracket is utilized as an intermediate force-transmitting member and transmits beam-end bending moment and shearing force simultaneously, thus reducing the difficulty of construction, and effectively solving the problem of transmission of the beam-end node bending moment and the shearing force of the later concrete pouring beam; and the concretion connection structure has the advantages of reasonable force transmission, simple structure, convenient construction, accurate positioning of reinforced steel bars and the like.

Description

The fixed syndeton of a kind of supporting construction and back pouring concrete beam
Technical field
The utility model relates to the fixed syndeton of a kind of supporting construction and back pouring concrete beam, belongs to industry and civilian construction technical field.
Background technology
The fixed connection of concrete beam end is that at present industry makes a kind of connected mode with the most use with the civilian construction field, and fixed connection can be transmitted moment of flexure, shearing and the axle power of the concrete beam that various effects cause.Under the same conditions, it saves steel and amount of concrete than being articulated and connected, and has the tangible economic advantages and the wider scope of application; The indeterminate concrete beam of the fixed connection in two ends can not lose supporting capacity because certain retrains destroyed, has big defence capability.And the fixed connection in concrete beam end is favourable to the stability and the shock resistance of total.But, in practice of construction, because the restriction of various different conditions such as job practices, engineering time, working procedure, construction plant, especially adopt the various supporting constructions of synovial membrane construction and the connecting portion of each floor concrete beam, the concrete beam of the fixed connection in end and its supporting construction often can not be built simultaneously, the problem that this anchoring of taking appropriate construction measure to solve beam steel with regard to needs is connected with new-old concrete guarantees that joint structure can satisfy the requirement of fixed connection.Two kinds of ways commonly used are in the construction at present: first kind of way: the reinforcing bar 2 of the vertical muscle coupling of reservation and concrete beam in supporting construction 1, treat supporting construction construction finish after with reserved steel bar dig out, alignment, be connected with the vertical muscle welding or the overlap joint of concrete beam 3, and, see accompanying drawing 4 with new-old concrete contact surface processing after-pouring concrete beam.This way has two drawbacks: one, reserved steel bar can make that the reinforcing bar in the supporting construction can be very crowded in supporting construction, the concrete vibration quality be cannot say for sure to demonstrate,prove, the reserved steel bar difficulty is located, error is big, and the workload that the later stage is dug out reserved steel bar, alignment and contact surface processing is bigger; Two, the ability of the new-old concrete contact surface Transfer of Shear of cast is had a greatly reduced quality by stages, and this has weakened the intensity of supporting construction to a certain extent.Second kind of way: on supporting construction 1, reserve hole 2, when waiting to construct concrete beam 3 the vertical muscle of beam stretched into the hole anchoring and each structural element watered and build up an integral body, as accompanying drawing 6.Though this way is Transfer of Shear effectively, but the anchoring of beam longitudinal reinforcement usually can not be satisfied standard and structure requirement, and because the difference of creeping and shrinking of new-old concrete, the intensity that will cause the new-old concrete junction is less than concrete actual design intensity, make the intensity of the intensity of connected node less than structural element, will cause destruction of a node prior to component damage, this connected node destroys earlier and does not allow to occur in design.
The utility model content
Technical problem to be solved in the utility model is to provide the fixed syndeton of a kind of supporting construction of constructing rationally, being convenient to construct with back pouring concrete beam.
For solving the problems of the technologies described above the technical solution of the utility model: the fixed syndeton of a kind of supporting construction and back pouring concrete beam.Its formation comprises supporting construction and back pouring concrete beam, is embedded with buried plate on described supporting construction, is welded with steel corbel on buried plate, and the vertical muscle of concrete beam is anchored on the steel corbel by welding.
In the fixed syndeton of above-mentioned supporting construction and back pouring concrete beam, be that the vertical muscle end of concrete beam is anchored on the steel corbel by welding.
In the fixed syndeton of aforesaid supporting construction and back pouring concrete beam, on steel corbel, be welded with additional shear reinforcement.
The beneficial effects of the utility model: compared with prior art, the utility model is by pre-embedded steel slab on supporting construction, and on pre-embedded steel slab the weldable steel bracket, the concrete beam longitudinal reinforcement is anchored on the steel corbel by welding, welding adds shear reinforcement on steel corbel in addition, utilize steel corbel to transmit beam-ends moment of flexure and shearing simultaneously as middle Force transmission parts, embedded board neither can weaken the intensity of supporting construction on supporting construction, does not increase the supporting construction difficulty of construction again; The purpose of weldable steel bracket is the shearing of concrete beam is effectively passed to supporting construction by steel corbel and attachment weld on embedded board; The concrete beam longitudinal reinforcement is welded on the steel corbel and the moment of flexure of concrete beam effectively can be passed to supporting construction, and the reinforcing bar location is accurate and convenient; Can more effectively the shearing on the concrete beam be passed to supporting construction by steel corbel at the additional shear reinforcement of welding on the steel corbel.The utility model is when guaranteeing the structural system bulk strength, neither increase difficulty of construction, effectively solved simultaneously the problem that back pouring concrete beam-ends node moment of flexure and shearing transmit again, have power transmission rationally, advantage such as simple structure, easy construction, reinforcing bar location be accurate.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the 1-1 sectional view of Fig. 1;
Fig. 3 is a work progress schematic diagram of the present utility model;
Fig. 4 is the work progress schematic diagram of supporting construction and fixed beam in the prior art;
Fig. 5 is the 2-2 sectional view of Fig. 4;
Fig. 6 is the another kind of work progress schematic diagram of supporting construction and fixed beam in the prior art;
Fig. 7 is the 3-3 sectional view of Fig. 6.
Below in conjunction with the drawings and specific embodiments the utility model is further described.
The specific embodiment
Embodiment.As shown in Figure 1, 2, comprise supporting construction 1 and back pouring concrete beam 4, on supporting construction 1, be embedded with buried plate 2, on buried plate 2, be welded with steel corbel 3, the vertical muscle end of concrete beam 4 is anchored on the steel corbel 3 by welding, is welded with additional shear reinforcement 5 on steel corbel 3.Concrete beam 4 is bearing on the supporting construction 1 by steel corbel 3.During construction, as shown in Figure 3, when cast supporting construction 1, buried plate 2 is embedded in the supporting construction 1, treat after supporting construction 1 reaches predetermined strength steel corbel 3 to be welded on the buried plate 2, the vertical muscle and the stirrup of colligation concrete beam 4 then, and the vertical muscle end of concrete beam 4 is anchored on the steel corbel 3 by welding, will add shear reinforcement 5 again and be welded on the steel corbel 3, last fluid concrete beam 4; When fluid concrete beam 4, should be specifically noted that the concrete vibrating in steel corbel 3 scopes closely knit.
Embodiment of the present utility model is not limited to the foregoing description, all belongs within the protection domain of the present utility model in the various variations of making under the prerequisite that does not break away from the utility model aim.

Claims (3)

1. the fixed syndeton of a supporting construction and back pouring concrete beam, comprise supporting construction (1) and back pouring concrete beam (4), it is characterized in that: on described supporting construction (1), be embedded with buried plate (2), be welded with steel corbel (3) on buried plate (2), the vertical muscle of concrete beam (4) is anchored on the steel corbel (3) by welding.
2. the fixed syndeton of supporting construction according to claim 1 and back pouring concrete beam, it is characterized in that: the vertical muscle end of described concrete beam (4) is anchored on the steel corbel (3) by welding.
3. the fixed syndeton of supporting construction according to claim 1 and back pouring concrete beam is characterized in that: be welded with additional shear reinforcement (5) on described steel corbel (3).
CN2009203142757U 2009-11-06 2009-11-06 Concretion connecting structure of supporting structure and later concrete pouring beam Expired - Fee Related CN201605661U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203142757U CN201605661U (en) 2009-11-06 2009-11-06 Concretion connecting structure of supporting structure and later concrete pouring beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203142757U CN201605661U (en) 2009-11-06 2009-11-06 Concretion connecting structure of supporting structure and later concrete pouring beam

Publications (1)

Publication Number Publication Date
CN201605661U true CN201605661U (en) 2010-10-13

Family

ID=42950370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203142757U Expired - Fee Related CN201605661U (en) 2009-11-06 2009-11-06 Concretion connecting structure of supporting structure and later concrete pouring beam

Country Status (1)

Country Link
CN (1) CN201605661U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251582A (en) * 2011-05-16 2011-11-23 姚攀峰 Barrier-free decoration structure of high and low incorporated buildings and construction method thereof
CN103088829A (en) * 2013-01-30 2013-05-08 上海城建市政工程(集团)有限公司 Construction method of concrete support in foundation pit
CN103541435A (en) * 2013-09-22 2014-01-29 沈阳建筑大学 Full-assembled type cross node with steel plate concrete cantilever beams
CN107254937A (en) * 2017-08-07 2017-10-17 北京工业大学 A kind of assembled power consumption girder connection of built-in X-shaped low-yield structural steel connecting member
CN110106973A (en) * 2019-06-06 2019-08-09 深汕特别合作区盛腾科技工业园有限公司 A kind of connection type and connection structure of assembled beam-column node

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251582A (en) * 2011-05-16 2011-11-23 姚攀峰 Barrier-free decoration structure of high and low incorporated buildings and construction method thereof
CN102251582B (en) * 2011-05-16 2013-08-21 北京国泰建设集团有限公司 Barrier-free decoration structure of high and low incorporated buildings and construction method thereof
CN103088829A (en) * 2013-01-30 2013-05-08 上海城建市政工程(集团)有限公司 Construction method of concrete support in foundation pit
CN103088829B (en) * 2013-01-30 2015-08-26 上海城建市政工程(集团)有限公司 The construction method that in a kind of foundation ditch, concrete supports
CN103541435A (en) * 2013-09-22 2014-01-29 沈阳建筑大学 Full-assembled type cross node with steel plate concrete cantilever beams
CN103541435B (en) * 2013-09-22 2015-10-21 沈阳建筑大学 With the cross node of full assembling of steel plate concrete Cantilever Beams
CN107254937A (en) * 2017-08-07 2017-10-17 北京工业大学 A kind of assembled power consumption girder connection of built-in X-shaped low-yield structural steel connecting member
CN107254937B (en) * 2017-08-07 2019-07-12 北京工业大学 A kind of assembled energy consumption girder connection of built-in X-shaped low-yield structural steel connecting member
CN110106973A (en) * 2019-06-06 2019-08-09 深汕特别合作区盛腾科技工业园有限公司 A kind of connection type and connection structure of assembled beam-column node

Similar Documents

Publication Publication Date Title
CN106894523B (en) Connecting joint of rectangular steel pipe concrete column and steel reinforced concrete beam
CN201605661U (en) Concretion connecting structure of supporting structure and later concrete pouring beam
CN204753843U (en) PC primary and secondary roof beam bolted connection node
CN102086677A (en) Prefabricated reinforced concrete beam and connection joint of reinforced concrete column and beam
CN102926504B (en) Construction method of steel and concrete overlapped beam combined part
CN101215855A (en) Combination beam
CN211037273U (en) Steel joint is connected to assembled concrete structure primary and secondary roof beam
CN205387770U (en) Be applied to precast floor plank connecting piece of prefabricated assembled steel construction building
CN101311481B (en) Steel column foot reinforced structure
CN101624842B (en) Hollow sandwich filled steel tubular column-steel beam node adopting one-way fastening bolt
CN105507426A (en) Half-through bracket haunching type compound steel pipe concrete column-steel beam joint
CN208981568U (en) A kind of huge combination column with section steel and concrete and shear wall connection structure
CN109972857A (en) A kind of embedded fashioned iron formula underpins node
CN203440993U (en) Connection joint of prefabricated reinforced concrete beam
CN114135000A (en) Assembled beam-column connecting joint partially wrapped with U-shaped steel and construction method thereof
CN107023020B (en) Horizontal internal support system of deep foundation pit assembled type combined steel structure and construction method thereof
CN1560369A (en) Connecting method for rigid joint of steel girdle and concrete bridge pier
WO2008100026A1 (en) Composite girder with steel truss web having hinge connecting, and connection structure thereof
CN103643741A (en) Method for connecting prefabricated concrete members
CN215858606U (en) Be equipped with steel pipe concrete column reinforcing bar through structure of crust roof beam
CN202831392U (en) Connecting steel component for joint part of steel reinforced concrete laminated beams
CN101787673A (en) Punching I-steel connecting structure of circular steel pipe light aggregate concrete beam and concrete bridge pier and construction process thereof
CN208533863U (en) A kind of prefabricated girder of armored concrete
CN204456451U (en) The connected node of a kind of buckling restrained brace and concrete beam and column
CN203188371U (en) Out-of-plane connection nodal point of bent anchor bar steel beam and thin concrete shear wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INSTITUTE C

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110531

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO. 2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110531

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101013

Termination date: 20151106

EXPY Termination of patent right or utility model