CN201598568U - Bridge railing - Google Patents

Bridge railing Download PDF

Info

Publication number
CN201598568U
CN201598568U CN2009202018748U CN200920201874U CN201598568U CN 201598568 U CN201598568 U CN 201598568U CN 2009202018748 U CN2009202018748 U CN 2009202018748U CN 200920201874 U CN200920201874 U CN 200920201874U CN 201598568 U CN201598568 U CN 201598568U
Authority
CN
China
Prior art keywords
reinforcing bar
railing
concrete pedestal
spring
fibrous tissue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202018748U
Other languages
Chinese (zh)
Inventor
俞俊越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009202018748U priority Critical patent/CN201598568U/en
Application granted granted Critical
Publication of CN201598568U publication Critical patent/CN201598568U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a bridge railing, which belongs to the field of highway traffic devices and comprises a buffering structure, a spring device, a collapsing device and a railing. A main body of the buffering structure is a concrete base, the railing is transversely disposed above the concrete base, the spring device comprises an upper upright column and a lower reinforcing bar, the inside of the upright column is a cavity structure, the lower portion of the reinforcing bar is arranged inside the concrete base and fixed with the concrete base via threads, the upper portion of the reinforcing bar extends out of the upper surface of the concrete base and penetrates through the bottom of the upright column, a penetrated portion of the reinforcing bar is sleeved with a spring, a clamp nut is disposed on the reinforcing bar at the upper end of the spring, the collapsing device comprises an elastic component and a compacting part inside the elastic component, and the elastic component is fixed with the railing through a clamp nut. The bridge railing combines rigid pressure resistance with flexible pressure resistance, can effectively reduce breakage damage to the railing due to accidents, and simultaneously decreases loss of vehicles in accidents.

Description

Bridge guardrail
Technical field
The utility model relates to the safeguard in a kind of highway communication field, especially a kind of Bridge guardrail.
Background technology
At present, known Bridge guardrail effect is in order to prevent that vehicle from sweeping away highway when meeting accident accident, cause bigger accident, when night or sight line are bad, play the effect of kerb line, but the guardrail on the existing market mainly is flexible safety fence or stiff safety fence, flexible safety fence normally utilizes cable wire or steel mesh with screen resilience to protect, the stack of concrete that stiff safety fence is normally firm or steel work or above-mentioned two kinds of materials constitutes protection system, because the inertia during vehicle operating is bigger, simple flexible safety fence is not easy to stop vehicle, vehicle is easy to go out guardrail, so not only to the damage of damaging property of guardrail, and the loss of accident vehicle is also very huge, though and stiff safety fence can stop vehicle to sweep away guardrail, but stiff safety fence can cause the secondary injury to accident vehicle mostly, especially to vehicle collision on guardrail, the consequence that two rigid objects collide is very serious, simultaneously, guardrail is in case disorderly flown everywhere after being broken also easily to damage to the accident vehicle vehicle of having passed by on one's way, therefore, and for solving the deficiency of existing guardrail, be badly in need of a kind ofly can either playing the guardrail that protection can be played cushioning effect again the loss after the minimizing accident takes place.
Summary of the invention
At above-mentioned the deficiencies in the prior art part, the utility model provides a kind of buffer structure that possesses the rigidity erosion control, spring setting that flexibility is dissolved impact force and the Bridge guardrail of emergency reaction collapsing structure, can effectively solve the problem that above-mentioned prior art exists.
To achieve these goals, the technical solution adopted in the utility model is: Bridge guardrail comprises buffer structure, spring assembly, buckling device and railing, the main body of described buffer structure is a concrete pedestal, described railing laterally is located at the top of concrete pedestal, described spring assembly comprises the column on top and the reinforcing bar of bottom, the inside of column is cavity structure, the bottom of reinforcing bar places in the concrete pedestal, and fix with the concrete pedestal screw thread, the top of reinforcing bar is paid the upper surface of concrete pedestal and is passed the bottom of column, reinforcing bar expenditure concrete pedestal and be positioned on the position of column and be with spring, on the reinforcing bar of spring upper end, be provided with clamp nut, described buckling device comprises the compression piece of elastic fibrous tissue and elastic fibrous tissue inside, and elastic fibrous tissue links to each other with railing, and compression piece and railing are perpendicular.
As preferably, the outside of described elastic fibrous tissue is provided with the rubber-like rubber sleeve, and the compression piece of elastic fibrous tissue inside is the compression spring.
As preferably, described elastic fibrous tissue and railing are fixed by fastening bolt.
As preferably, the front of described column is the arcwall face of indent.
As preferably, the top in described concrete pedestal front is the buffering cambered surface towards indent.
As preferably, the upper surface of described concrete pedestal has the screwed hole of vertical direction, and screwed hole is deep into the middle part of concrete pedestal, and the surface of described reinforcing bar is provided with and the corresponding external screw thread of screwed hole.
Compared with prior art, the beneficial effect that this utility model is brought is: this utility model possesses the buffer structure of rigidity erosion control simultaneously, flexibility is dissolved the spring assembly of impact force and the buckling device of emergency reaction, simple in structure, rigidity and flexible resistance to compression are combined, effectively minimizing accident is to the destructiveness damage of guardrail, also can reduce simultaneously the loss of accident vehicle, after accident takes place, accident vehicle has reduced the part impact force after at first impacting the arcwall face of rigid concrete pedestal, buckling device on it and spring assembly can be dissolved remaining impact force, therefore, can be by of the destructiveness damage of effectively minimizing accident of said structure to guardrail, reduce the loss of accident vehicle, avoid accident that the injury of back to the vehicle of passing by on one's way takes place simultaneously.
Description of drawings
Fig. 1 is the utility model Facad structure schematic diagram;
Fig. 2 is the utility model side structure schematic diagram.
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and the specific embodiments.
As shown in Figure 1, 2, as a kind of embodiment of the present utility model, this Bridge guardrail comprises buffer structure, spring assembly, buckling device and railing 8, and the main body of described buffer structure is a concrete pedestal 1, and the top in described concrete pedestal 1 front is the buffering cambered surface 11 towards indent.Described railing 8 is two, laterally is located at the top of concrete pedestal 1.Described spring assembly comprises the column 5 on top and the reinforcing bar 2 of bottom, the front of column 5 is the arcwall face of indent, inside is cavity structure, the bottom of reinforcing bar 2 places in the concrete pedestal 1, and fix with concrete pedestal 1 screw thread, specifically, the upper surface of described concrete pedestal 1 has the screwed hole 12 of vertical direction, screwed hole 12 is deep into the middle part of concrete pedestal 1, the surface of described reinforcing bar 2 is provided with and screwed hole 12 corresponding external screw threads, the top of reinforcing bar 2 is paid the upper surface of concrete pedestal 1 and is passed the bottom of column 5, is with spring 3 on the position that reinforcing bar 2 passes, and is provided with clamp nut 4 on the reinforcing bar 2 of spring 3 upper ends.Described buckling device comprises the compression piece 7 of elastic fibrous tissue 6 and elastic fibrous tissue 6 inside, described elastic fibrous tissue 6 outsides are provided with the rubber-like rubber sleeve, described elastic fibrous tissue 6 links to each other with railing 8, specifically, compression piece 7 is the compression spring perpendicular with railing 8, and elastic fibrous tissue 6 is fixing by fastening bolt 9 with railing 8.This utility model possesses the buffer structure of rigidity erosion control simultaneously, flexibility is dissolved the spring setting of impact force and the collapsing structure of emergency reaction, simple in structure, rigidity and flexible resistance to compression are combined, effectively minimizing accident is to the destructiveness damage of guardrail, also can reduce simultaneously the loss of accident vehicle, after accident takes place, accident vehicle has reduced the part impact force after at first impacting the buffering cambered surface 11 of rigid concrete pedestal 1, buckling device on it and spring assembly can be dissolved remaining impact force, therefore, can be by of the destructiveness damage of effectively minimizing accident of said structure to guardrail, reduce the loss of accident vehicle, avoid accident that the injury of back to the vehicle of passing by on one's way takes place simultaneously.

Claims (6)

1. Bridge guardrail, comprise buffer structure and railing (8), the main body of described buffer structure is concrete pedestal (1), described railing (8) laterally is located at the top of concrete pedestal (1), it is characterized in that: also comprise spring assembly and buckling device, described spring assembly comprises the column (5) on top and the reinforcing bar (2) of bottom, the inside of column (5) is cavity structure, the bottom of reinforcing bar (2) places in the concrete pedestal (1), and fix with concrete pedestal (1) screw thread, the top of reinforcing bar (2) is paid the upper surface of concrete pedestal (1) and is passed the bottom of column (5), reinforcing bar (2) expenditure concrete pedestal (1) and be positioned on the position of column (5) and be with spring (3), on the reinforcing bar (2) of spring (3) upper end, be provided with clamp nut (4), described buckling device comprises elastic fibrous tissue (6) and the inner compression piece (7) of elastic fibrous tissue (6), elastic fibrous tissue (6) links to each other with railing (8), and compression piece (7) is perpendicular with railing (8).
2. Bridge guardrail according to claim 1 is characterized in that: the outside of described elastic fibrous tissue (6) is provided with the rubber-like rubber sleeve, and the inner compression piece (7) of elastic fibrous tissue (6) is the compression spring.
3. Bridge guardrail according to claim 1 is characterized in that: described elastic fibrous tissue (6) is fixing by fastening bolt (9) with railing (8).
4. Bridge guardrail according to claim 1 is characterized in that: the front of described column (5) is the arcwall face of indent.
5. Bridge guardrail according to claim 1 is characterized in that: the positive top of described concrete pedestal (1) is the buffering cambered surface (11) towards indent.
6. Bridge guardrail according to claim 1, it is characterized in that: the upper surface of described concrete pedestal (1) has the screwed hole (12) of vertical direction, screwed hole (12) is deep into the middle part of concrete pedestal (1), and the surface of described reinforcing bar (2) is provided with and the corresponding external screw thread of screwed hole (12).
CN2009202018748U 2009-12-03 2009-12-03 Bridge railing Expired - Fee Related CN201598568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202018748U CN201598568U (en) 2009-12-03 2009-12-03 Bridge railing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202018748U CN201598568U (en) 2009-12-03 2009-12-03 Bridge railing

Publications (1)

Publication Number Publication Date
CN201598568U true CN201598568U (en) 2010-10-06

Family

ID=42809617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202018748U Expired - Fee Related CN201598568U (en) 2009-12-03 2009-12-03 Bridge railing

Country Status (1)

Country Link
CN (1) CN201598568U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102628255A (en) * 2011-02-02 2012-08-08 Axip有限公司 Improvement of energy absorbing device and improvement relative to energy absorbing device
CN106192745A (en) * 2016-08-05 2016-12-07 吴扬华 A kind of bridge with liftable guardrail
CN106836077A (en) * 2017-03-21 2017-06-13 安徽卓航展示用品有限公司 The netted anticollision barrier of tilting-type

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102628255A (en) * 2011-02-02 2012-08-08 Axip有限公司 Improvement of energy absorbing device and improvement relative to energy absorbing device
CN102628255B (en) * 2011-02-02 2016-07-06 维蒙特公路技术有限公司 Slide assemblies, energy absorbing device, guardrail and associated method
CN106192745A (en) * 2016-08-05 2016-12-07 吴扬华 A kind of bridge with liftable guardrail
CN106192745B (en) * 2016-08-05 2017-11-28 南京众慧网络科技有限公司 A kind of bridge with liftable guardrail
CN106836077A (en) * 2017-03-21 2017-06-13 安徽卓航展示用品有限公司 The netted anticollision barrier of tilting-type
CN106836077B (en) * 2017-03-21 2019-05-28 安徽卓航展示用品有限公司 The netted anticollision barrier of tilting-type

Similar Documents

Publication Publication Date Title
CN105951640B (en) A kind of elastic anti-collision guardrail
CN205171366U (en) Bridge guard railing
CN110106784A (en) A kind of bridge guardrail structure
CN201598568U (en) Bridge railing
CN211228274U (en) Highway damping rail guard
CN209686233U (en) A kind of Bridge guardrail
CN108643083A (en) A kind of guardrail slowing down frontal impact
CN201614561U (en) Steel cable connection damper for foreign matter invasion-prevention rigid protective screen for high-speed railway
CN201276675Y (en) Bridge guardrail capable of resolving partial impact force
CN206941387U (en) A kind of Bridge guardrail
CN107988938A (en) It is a kind of to place firm bridge height limiter
CN215907606U (en) Highway is protective structure for engineering convenient to installation
CN209669756U (en) A kind of municipal guardrail with warning function
CN208415097U (en) A kind of cushioning guard fence of road and bridge
CN108385564A (en) A kind of safety type combined type guardrail
CN214301219U (en) Bridge with anti-seismic pins
CN209722724U (en) A kind of road and bridge shield posts structure
CN213296159U (en) Adjustable flexible height-limiting early warning fence
CN210216247U (en) Town road rail guard
CN209353602U (en) A kind of opposite opened road height limiter
CN203113245U (en) Cable guardrail stand column
CN210975658U (en) Road isolation guardrail
CN208184258U (en) A kind of construction safety guide rail
CN213061693U (en) Bridge safety protection rail
CN207959073U (en) A kind of freeway guardrail structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101006

Termination date: 20101203