CN201586478U - Two-stage slurry circulation device for large-scale wet flue gas desulfurization - Google Patents

Two-stage slurry circulation device for large-scale wet flue gas desulfurization Download PDF

Info

Publication number
CN201586478U
CN201586478U CN2009203191772U CN200920319177U CN201586478U CN 201586478 U CN201586478 U CN 201586478U CN 2009203191772 U CN2009203191772 U CN 2009203191772U CN 200920319177 U CN200920319177 U CN 200920319177U CN 201586478 U CN201586478 U CN 201586478U
Authority
CN
China
Prior art keywords
tower
spraying layer
slurry
slurries
flue gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009203191772U
Other languages
Chinese (zh)
Inventor
马春元
谷吉林
王金亭
李玲燕
张洪军
高伦刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Shanda Energy and Environment Co Ltd
Original Assignee
Shandong Shanda Energy and Environment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Shanda Energy and Environment Co Ltd filed Critical Shandong Shanda Energy and Environment Co Ltd
Priority to CN2009203191772U priority Critical patent/CN201586478U/en
Application granted granted Critical
Publication of CN201586478U publication Critical patent/CN201586478U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model relates to a two-stage slurry circulation device for large-scale wet flue gas desulfurization. The two-stage slurry circulation device comprises an absorption tower, a blender, a slurry pump, an oxidation fan, a mechanical demister, a primary spraying layer and a secondary spraying layer, wherein a shutter-type tray is arranged between the primary spraying layer and the secondary spraying layer; the secondary spraying layer is connected with the bottom of a slurry box outside the tower through a pipe and the slurry pump; pipes are arranged at the lower end of the shutter-type tray and connected with the slurry box outside the tower; and the slurry box outside the tower is connected with a slurry tank in the absorption tower through a pipe. The two-stage slurry circulation device suits flue gas desulfurization of coals with high sulfur content, and has the advantages of less land occupation, low investment, stable operation and so on.

Description

A kind of two-stage loop slurry device that is used for large-scale wet process of FGD
Technical field
The utility model belongs to industrial waste gas purifying environmental protection and energy field, particularly a kind of two-stage loop slurry device that is applicable to large-scale wet process of FGD.
Background technology
Wet desulfurizing process is that current China uses at most, the most effective fume desulphurization method, and the design desulfuration efficiency is not less than 95%.But power plant produces with coal and can only determine that the coal sulfur content significantly increases according to the market supply situation at present, makes burning coal and design ature of coal have bigger difference, simultaneously, also there is increase to a certain degree in the boiler smoke amount, causes some desulfurizer can not reach original design desulfuration efficiency, SO 2Can not qualified discharge.
At this situation, some desulfurization producers have also proposed some remodeling methods and measure at present, as existing desulfurizer is pushed over reconstruction, perhaps increase an auxiliary absorber flue gas is shunted etc., these measures or improvement expenses are huge, destructive serious to existing utility; Need bigger floor space, make on-the-spot place can not satisfy the transformation requirement.
The utility model content
The utility model is a kind of two-stage loop slurry device that is used for large-scale wet process of FGD, comprise absorption tower, agitator, slush pump, oxidation fan, mechanical demister and one-level spraying layer and secondary spraying layer, be provided with the venetian blind type pallet between one-level spraying layer and the secondary spraying layer, the lower end of venetian blind type pallet is furnished with pipeline and is connected to the outer slurries case of tower, the secondary spraying layer is connected to the bottom of the outer slurries case of tower by pipeline, one-level spraying layer loop slurry pH value is controlled at 4-5, and secondary spraying layer loop slurry pH value is controlled at 5.5-6.5.The outer slurries case of tower links to each other by the slurries pond of pipeline with the bottom, absorption tower, is provided with slush pump in the pipeline on the outer slurries case connection of tower absorption tower.
Two-stage loop slurry device of the present utility model, absorption tower one-level spraying layer is as the one-level slurries circulatory system in the absorption tower, and its slurry pH value generally is controlled at 4~5; Be provided with the slurries case outside the absorption tower, spraying layer and venetian blind type pallet are installed in the upper end on the absorption tower with the level spraying layer, and in the slurries case, as the secondary circulatory system on absorption tower, its slurry pH value generally is controlled at 5.5~6.5 to the slurry reflux of collection outside tower; In same absorption tower, realized the two-stage circulatory system of the two pH value controls of slurries like this.Boiler smoke passes the further purification of secondary loop slurry spray district that the venetian blind type pallet enters tower body top again after departmental level loop slurry spray is distinguished purification under the absorption tower, can qualified discharge behind the flue gas process two-stage loop slurry spray washing.
The utility model system and device is realized in the following way:
The utility model system and device is on existing tower prime cement liquid pool one-level circulatory system basis, increase two-layer at the tower body top or three layers of spraying layer as secondary slurries spraying layer, slurries case outside the tower is set near the absorption tower, the circulating pump of supporting secondary slurries, oxidation fan, agitator and connection pump constitute the outer slurries case secondary circulatory system of tower.Secondary loop slurry and demister flushing water are drawn the absorption tower after collecting by the venetian blind type pallet, are back to the outer slurries case of tower, thereby realize the separation of two-stage loop slurry.Slurries in the outer slurries case of tower are forced to deliver in the tower prime cement liquid pool by being communicated with pump, and the further again oxidation of desulfurization product forms gypsum slurries, delivers to gypsum dehydration system through the gypsum excavationg pump and handles.The utility model is realized the two-stage circulatory system of the two pH value controls of slurries in same absorption tower, improve desulfuration efficiency, guarantees SO 2Qualified discharge.The one-level loop slurry pH value of tower prime cement liquid pool is controlled at 4~5, and the pH value is low to help the dissolving of lime stone, the complete oxidation of calcium sulfite and the generation of gypsum, can be controlled at chloride ion corrosion more among a small circle in, and improve the utilization rate of lime stone; The secondary loop slurry pH value of the outer slurries case of tower is controlled at 5.5~6.5, and the pH value is higher to help obtaining higher desulfuration efficiency.Two-stage spraying layer intermediate arrangement has the venetian blind type pallet up and down, and flue gas even flow field behind venetian blind type pallet water conservancy diversion is steady, and flue gas resistance is low; Simultaneously pallet forms the multilayer cascade after collecting slurries, has increased the haptoreaction time with slurries when flue gas passes, and helps improving desulfuration efficiency.
The utility model is handled applicable to the high flue gas desulfurization of coal-fired sulfur content, have occupation of land less, reduced investment, advantage such as stable.
Description of drawings
Accompanying drawing is a kind of two-stage loop slurry schematic representation of apparatus that is used for large-scale wet process of FGD, wherein: 1 is slurries pond agitator, 2 is slurry circulating pump, and 3 is the absorption tower, and 4 is gas approach, 5 is one-level slurries spraying layers, 6 is the venetian blind type pallet, and 7 is secondary slurries spraying layers, and 8 is mechanical demister, 9 is exhanst gas outlet, 10 is the gypsum pump, and 11 is oxidation fan, and 12 is slurry circulating pump, 13 is the slurries box mixer, 14 is the slurries case, and 15 is slush pump, and 16 is oxidation fan, 17 is pipeline, and 18 is pipeline.
The specific embodiment
Provide a preferred forms of the present utility model below in conjunction with accompanying drawing.
Boiler smoke enters absorption tower 3 through gas approach 4, and the loop slurry with spray in the absorption tower contacts, and finishes sweetening process.The slurries circulatory system is made up of the one-level circulatory system and the secondary circulatory system, wherein the one-level circulatory system is finished in the following manner: the slurries that absorb in the Tata prime cement liquid pool are delivered to one-level slurries spraying layer 5 by slurry circulating pump 2, turn back in the tower prime cement liquid pool after finishing desulfurization; The secondary circulatory system is finished in the following manner: the slurries in the slurries case 14 are delivered to secondary slurries spraying layer 7 by slurry circulating pump 12, finish after the desulfurization to be collected by venetian blind type pallet 6 to turn back to slurries case 14 by pipeline 17.The outer slurries case of tower entoplasm liquid pool and tower is equipped with agitator 1 and 13 and oxidation fan 11 and 16 respectively, with precipitation that prevents slurries and the effective generation that guarantees the desulfurated plaster slurries.Slurries in the slurries case 14 are forced to deliver in the tower prime cement liquid pool by pipeline 18 by slush pump 15, when the slurries solid concentration in the tower prime cement liquid pool reaches 15% when above, send into the gypsum dehydration system processing through gypsum pump 10.Flue gas after the washing of two-stage slurries spraying layer is removed the drop that carries in the flue gas by mechanical demister 8, delivers to smoke stack emission through exhanst gas outlet 9 again.

Claims (2)

1. two-stage loop slurry device that is used for large-scale wet process of FGD, comprise absorption tower, agitator, slush pump, oxidation fan, mechanical demister and one-level spraying layer and secondary spraying layer, it is characterized in that being provided with the venetian blind type pallet between one-level spraying layer and the secondary spraying layer, the lower end of venetian blind type pallet is furnished with pipeline and is connected to the outer slurries case of tower, and the secondary spraying layer is connected to the bottom of the outer slurries case of tower by pipeline.
2. a kind of two-stage loop slurry device that is used for large-scale wet process of FGD according to claim 1 is characterized in that the outer slurries case of tower links to each other by the slurries pond of pipeline with the bottom, absorption tower, is provided with slush pump in the pipeline on the outer slurries case connection of tower absorption tower.
CN2009203191772U 2009-12-30 2009-12-30 Two-stage slurry circulation device for large-scale wet flue gas desulfurization Expired - Lifetime CN201586478U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203191772U CN201586478U (en) 2009-12-30 2009-12-30 Two-stage slurry circulation device for large-scale wet flue gas desulfurization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203191772U CN201586478U (en) 2009-12-30 2009-12-30 Two-stage slurry circulation device for large-scale wet flue gas desulfurization

Publications (1)

Publication Number Publication Date
CN201586478U true CN201586478U (en) 2010-09-22

Family

ID=42746245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203191772U Expired - Lifetime CN201586478U (en) 2009-12-30 2009-12-30 Two-stage slurry circulation device for large-scale wet flue gas desulfurization

Country Status (1)

Country Link
CN (1) CN201586478U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103341315A (en) * 2013-07-01 2013-10-09 中电投远达环保工程有限公司 Absorption tower with inlet water screen
CN104857828A (en) * 2015-04-22 2015-08-26 烟台创元热能科技有限公司 Liquid receiving tray
CN105536494A (en) * 2015-12-30 2016-05-04 廖厚伍 Single-tower pH double-region double-circulation desulfurization process
CN105593195A (en) * 2013-11-22 2016-05-18 Lg化学株式会社 Method for recovering absorption solvent in process for preparing butadiene through oxidative dehydrogenation
CN105664703A (en) * 2016-02-15 2016-06-15 大唐环境产业集团股份有限公司 Absorption tower two-stage stirrer device
CN106000066A (en) * 2016-07-01 2016-10-12 大唐环境产业集团股份有限公司 Absorbing tower with air introducing device
CN108144431A (en) * 2018-01-04 2018-06-12 台鹰环境工程有限公司 High efficient gas and liquid cut-off equipment
CN110124501A (en) * 2019-05-17 2019-08-16 中国神华能源股份有限公司 Flue gas purification system and method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103341315A (en) * 2013-07-01 2013-10-09 中电投远达环保工程有限公司 Absorption tower with inlet water screen
CN103341315B (en) * 2013-07-01 2015-02-25 中电投远达环保工程有限公司 Absorption tower with inlet water screen
CN105593195A (en) * 2013-11-22 2016-05-18 Lg化学株式会社 Method for recovering absorption solvent in process for preparing butadiene through oxidative dehydrogenation
US9919260B2 (en) 2013-11-22 2018-03-20 Lg Chem, Ltd. Method of recovering absorption solvent in butadiene production process by oxidative dehydrogenation
CN105593195B (en) * 2013-11-22 2018-08-28 Lg化学株式会社 The method that lyosoption is recycled in the butadiene production by oxidative dehydrogenation
CN104857828A (en) * 2015-04-22 2015-08-26 烟台创元热能科技有限公司 Liquid receiving tray
CN105536494A (en) * 2015-12-30 2016-05-04 廖厚伍 Single-tower pH double-region double-circulation desulfurization process
CN105664703A (en) * 2016-02-15 2016-06-15 大唐环境产业集团股份有限公司 Absorption tower two-stage stirrer device
CN106000066A (en) * 2016-07-01 2016-10-12 大唐环境产业集团股份有限公司 Absorbing tower with air introducing device
CN108144431A (en) * 2018-01-04 2018-06-12 台鹰环境工程有限公司 High efficient gas and liquid cut-off equipment
CN110124501A (en) * 2019-05-17 2019-08-16 中国神华能源股份有限公司 Flue gas purification system and method

Similar Documents

Publication Publication Date Title
CN201586478U (en) Two-stage slurry circulation device for large-scale wet flue gas desulfurization
CN2775496Y (en) Low cost high efficiency dust removing desulfurizing device
CN102755827B (en) Flue gas desulfurization process and device adopting acetylene sludge-gypsum method
CN204911218U (en) Single-tower double-area circulating absorption desulfurization system
CN201912887U (en) Horizontal type desulfurization tower
CN103480260B (en) Wet flue gas desulphurization technology by utilization of ethylene waste lye
CN104190223A (en) Liquid phase oxidation flue gas desulfurization, denitration and absorption technology and device
CN209287031U (en) A kind of sulfur dioxide minimum discharge desulfurizer being bubbled combination tower based on spray
CN204338011U (en) Moisture film desulfuration spray tower
CN103691294B (en) Wet type double alkali method desulfurizing dust arrester and technique
CN205886585U (en) Desulfidation dedusting system
CN102210967A (en) Two-stage treatment wet desulphurization method for high-sulfur coal-fired flue gas
CN202751947U (en) Flue gas desulfurization (FGD) device using carbide slag-gypsum method
CN102716659A (en) Oxidation ditch tandem arranged desulfurization tower and desulfurization system using desulfurization tower
CN102824825B (en) Multi-effect U-shaped tube type dedusting and desulfurization integrated device of coal-fired boiler and dedusting and desulfurization method thereof
CN202478813U (en) Wet flue gas desulphurization system used for coal-fired power plant boiler
CN201760226U (en) Wet flue gas dust-removal desulphurization device
CN202143816U (en) Accident discharge system of flue gas desulfurization device
CN204952642U (en) Efficiency of desulfurization is improved single tower dual cycle desulfurization system
CN204193580U (en) A kind of heat supply sewage circular treatment equipment
CN107185383A (en) One kind utilizes CO in grey slurry removing power-plant flue gas2Apparatus and method
CN203436992U (en) Rice hull ash recovering system in rice hull burning boiler
CN209791251U (en) Water optimization system for wet flue gas desulfurization device for efficient dust removal in thermal power plant
CN203763917U (en) Siphon slurry processor
CN202427355U (en) Flue gas desulfurization device of sintering machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20100922

CX01 Expiry of patent term