CN201547759U - Conveying device for afterburning of fly ash of boiler - Google Patents

Conveying device for afterburning of fly ash of boiler Download PDF

Info

Publication number
CN201547759U
CN201547759U CN2009202593487U CN200920259348U CN201547759U CN 201547759 U CN201547759 U CN 201547759U CN 2009202593487 U CN2009202593487 U CN 2009202593487U CN 200920259348 U CN200920259348 U CN 200920259348U CN 201547759 U CN201547759 U CN 201547759U
Authority
CN
China
Prior art keywords
boiler
fly ash
links
conveying device
pull valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202593487U
Other languages
Chinese (zh)
Inventor
沈斌
曹军
李文杰
周志平
Original Assignee
沈斌
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 沈斌 filed Critical 沈斌
Priority to CN2009202593487U priority Critical patent/CN201547759U/en
Application granted granted Critical
Publication of CN201547759U publication Critical patent/CN201547759U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Gasification And Melting Of Waste (AREA)

Abstract

A conveying device for afterburning of fly ash of a boiler comprises a manual gate valve, a pneumatic gate valve, an electric feeding machine, a screw pump, a blower and a conveying pipeline, wherein, the feed end of the manual gate valve is connected with a feeding bin, and the discharge end thereof is connected with the feed end of the electric feeding machine after penetrating the pneumatic gate valve; the discharge end of the electric feeding machine is connected with the feed opening of the screw pump; the discharge opening of the screw pump is connected with the bottom of a boiler through the conveying pipeline; and the blower is connected with the air inlet of the electric feeding machine through a pipeline. The device provided by the utility model has the advantages of simple and compact structure, low cost, and good air locking performance, ensures that the conveying process is stable and continuous, realizes the afterburning of the fly ash of the boiler, and improves the heating efficiency of the boiler.

Description

Boiler fly ash resume combustion conveying device
Technical field
The utility model is mainly concerned with the pulverized coal friring apparatus field, refers in particular to a kind of device of carrying flyash.
Background technology
Present domestic coal-fired power station boiler, coal dust still has some unburned pulverized coal particles after burning in burner hearth, if with its direct discharging, not only pollute the environment nor economy, and through after repeating burning (also can repeatedly circulate), its combustible component will reduce greatly, can further improve economic benefit.
Boiler boiler fly ash resume combustion conveying device, the flying dust that mainly is a electric field that phosphorus content is the highest partly or entirely are delivered to second-time burning in the burner hearth concentrated phase area of the boiler left and right sides according to the boiler combustion operating mode.Flyash resume combustion technology can reduce the phosphorus content of boiler fly ash, improves boiler thermal output, and boiler output is increased.Owing to certain pressure is arranged in the burner hearth, the ash conveying device that existing part power plant adopts, air locking can be bad, causes conveying capacity not meet the demands and often cause plugging.Above the transport conveyor constructions of existing other form is roughly is rotary pocket feeder, is blender below, a supporting jet nozzle.In case the conveying of this form does not force to lock the pressure of function pipeline the inside of gas greater than the deadweight of ash, the air in the pipeline will upwards be gone here and there, and causes material to hold off, and finally causes conveying capacity too small, and this situation is particularly outstanding after the dispenser wearing and tearing.
The utility model content
The technical problems to be solved in the utility model just is: at the technical problem that prior art exists, the utility model provide a kind of simple and compact for structure, with low cost, air locking can be good, can guarantee the course of conveying steady and continuous, realize the boiler fly ash resume combustion, improve the boiler fly ash resume combustion conveying device of boiler thermal output.
For solving the problems of the technologies described above, the utility model by the following technical solutions.
A kind of boiler fly ash resume combustion conveying device, it is characterized in that: comprise manual push-pull valve, pneumatic push-pull valve, electronic batcher, helicoidal pump, air blast and conveyance conduit, the feed end of described manual push-pull valve links to each other with feeding warehouse, the discharge end of described manual push-pull valve links to each other with the feed end of electronic batcher behind pneumatic push-pull valve, the discharge end of described electronic batcher links to each other with the charging aperture of helicoidal pump, the discharging opening of described helicoidal pump links to each other with boiler bottom by conveyance conduit, and described air blast links to each other with the air inlet of electronic batcher by pipeline.
As further improvement of the utility model:
Described air blast adopts Roots blower.
Described electronic batcher is the electronic batcher of band frequency converter.
Described conveyance conduit links to each other with the concentrated phase area of boiler bottom.
Compared with prior art, advantage of the present utility model just is: boiler fly ash resume combustion conveying device of the present utility model, adopt the direct connection kind of drive, belong to and adopt the design of forcing lock gas dispenser, its project organization is three grades of depressed structures of lock: one-level is a varying pitch mechanical lock gas, secondary is adjustable stock column lock gas, and three grades is board-like non-return lock gas; The application sprayers principle makes helicoidal pump discharge end work climate be relative negative pressure state substantially, efficiently solves pipeline system pressure and changes the influence that discharging brings to helicoidal pump; Whole wearing piece adopts carbide alloy to make, and has effectively reduced the wearing and tearing of equipment, has prolonged the service life of equipment.Upwards string, the material situation of being unable to come down of gas of having determined that device of the present utility model is fully dissatisfied has realized that lock gas, blanking carry out synchronously.After flyash resume combustion technology, do not change the characteristic of ash, be convenient to comprehensive utilization and save great amount of water resources.Compared with the past, this mode conveying device has high social and economic benefit.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Marginal data
1, manual push-pull valve; 2, pneumatic push-pull valve; 3, electronic batcher; 4, helicoidal pump; 5, air blast; 6, conveyance conduit; 7, boiler; 8, feeding warehouse.
The specific embodiment
Below with reference to specific embodiment and Figure of description the utility model is described in further details.
As depicted in figs. 1 and 2, boiler fly ash resume combustion conveying device of the present utility model, comprise manual push-pull valve 1, pneumatic push-pull valve 2, electronic batcher 3, helicoidal pump 4, air blast 5 and conveyance conduit 6, manually the feed end of push-pull valve 1 links to each other with feeding warehouse 8, manually the discharge end of push-pull valve 1 links to each other with the feed end of electronic batcher 3 behind pneumatic push-pull valve 2, the discharge end of electronic batcher 3 links to each other with the charging aperture of helicoidal pump 4, the discharging opening of helicoidal pump 4 links to each other with boiler 7 bottoms by conveyance conduit 6, and air blast 5 links to each other by the air inlet of pipeline with electronic batcher 3.In the present embodiment, air blast 5 adopts Roots blower, and Roots blower provides power gas source, is transported to the burner hearth of boiler 7 by conveyance conduit 6.The conveying equipment wearing and tearing are little, and defeated grey amount can electrodelessly be regulated, and whole transportation process is continuous, stable, even, thereby realize the flyash resume combustion.Electronic batcher 3 is the electronic batcher of band frequency converter, and conveyance conduit 6 links to each other with the concentrated phase area of boiler 7 bottoms.This device is to adopt the direct connection kind of drive, belongs to the design of adopting pressure lock gas dispenser, and its project organization is three grades of depressed structures of lock: one-level is a varying pitch mechanical lock gas, and secondary is adjustable stock column lock gas, and three grades is board-like non-return lock gas; The application sprayers principle makes helicoidal pump 4 discharge end work climates be relative negative pressure state substantially, efficiently solves conveyance conduit 6 system pressures and changes the influence that 4 dischargings bring to helicoidal pump; Whole wearing piece adopts carbide alloy to make, and has effectively reduced the wearing and tearing of equipment, has prolonged the service life of equipment.Upwards string, the material situation of being unable to come down of gas of having determined that device of the present utility model is fully dissatisfied has realized that lock gas, blanking carry out synchronously.After flyash resume combustion technology, do not change the characteristic of ash, be convenient to comprehensive utilization and save great amount of water resources.Compared with the past, this mode conveying device has high social and economic benefit.
The above only is a preferred implementation of the present utility model, and protection domain of the present utility model also not only is confined to the foregoing description, and all technical schemes that belongs under the utility model thinking all belong to protection domain of the present utility model.Should be pointed out that for those skilled in the art in the some improvements and modifications that do not break away under the utility model principle prerequisite, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (5)

1. boiler fly ash resume combustion conveying device, it is characterized in that: comprise manual push-pull valve (1), pneumatic push-pull valve (2), electronic batcher (3), helicoidal pump (4), air blast (5) and conveyance conduit (6), the feed end of described manual push-pull valve (1) links to each other with feeding warehouse (8), the discharge end of described manual push-pull valve (1) links to each other with the feed end of electronic batcher (3) behind pneumatic push-pull valve (2), the discharge end of described electronic batcher (3) links to each other with the charging aperture of helicoidal pump (4), the discharging opening of described helicoidal pump (4) links to each other with boiler (7) bottom by conveyance conduit (6), and described air blast (5) links to each other by the air inlet of pipeline with electronic batcher (3).
2. boiler fly ash resume combustion conveying device according to claim 1 is characterized in that: described air blast (5) adopts Roots blower.
3. boiler fly ash resume combustion conveying device according to claim 1 and 2 is characterized in that: described electronic batcher (3) is the electronic batcher of band frequency converter.
4. boiler fly ash resume combustion conveying device according to claim 1 and 2 is characterized in that: described conveyance conduit (6) links to each other with the concentrated phase area of boiler (7) bottom.
5. boiler fly ash resume combustion conveying device according to claim 3 is characterized in that: described conveyance conduit (6) links to each other with the concentrated phase area of boiler (7) bottom.
CN2009202593487U 2009-11-24 2009-11-24 Conveying device for afterburning of fly ash of boiler Expired - Fee Related CN201547759U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202593487U CN201547759U (en) 2009-11-24 2009-11-24 Conveying device for afterburning of fly ash of boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202593487U CN201547759U (en) 2009-11-24 2009-11-24 Conveying device for afterburning of fly ash of boiler

Publications (1)

Publication Number Publication Date
CN201547759U true CN201547759U (en) 2010-08-11

Family

ID=42602934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202593487U Expired - Fee Related CN201547759U (en) 2009-11-24 2009-11-24 Conveying device for afterburning of fly ash of boiler

Country Status (1)

Country Link
CN (1) CN201547759U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102249090A (en) * 2011-04-29 2011-11-23 智胜化工股份有限公司 High-temperature fine ash energy-saving environment-friendly conveying device for three waste (waste gas, waste water and waste residues) fluidization mixed combustion furnace
CN104525347A (en) * 2014-11-26 2015-04-22 广西鱼峰水泥股份有限公司 Method for reducing number of times of material dropping failure of fly ash warehouse

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102249090A (en) * 2011-04-29 2011-11-23 智胜化工股份有限公司 High-temperature fine ash energy-saving environment-friendly conveying device for three waste (waste gas, waste water and waste residues) fluidization mixed combustion furnace
CN104525347A (en) * 2014-11-26 2015-04-22 广西鱼峰水泥股份有限公司 Method for reducing number of times of material dropping failure of fly ash warehouse
CN104525347B (en) * 2014-11-26 2017-12-19 广西鱼峰水泥股份有限公司 A kind of method for reducing the flyash storehouse blanking number of stoppages

Similar Documents

Publication Publication Date Title
CN201547759U (en) Conveying device for afterburning of fly ash of boiler
CN204675383U (en) A kind of adjustable air-transport system of exerting oneself
CN204777659U (en) Limestone flour addition system for desulfurization in circulating fluidized bed boiler stove
CN204433807U (en) A kind of economizer ash discharge transport path switches and control system
CN101402419A (en) High-efficiency powder conveyer tube and powder conveying apparatus
CN201526957U (en) Industrial furnace fuel pneumatic conveying and blowing burning device
CN202284789U (en) Furnace-front biomass fuel feeding device
CN202082939U (en) Fly ash conveying mechanism of boiler economizer
CN201100652Y (en) Boiler combustion feeding device
CN202253669U (en) Reed scrap combustion treatment device
CN201703873U (en) Material conveying device
CN112387108A (en) Double-stage dry deacidification complete device and method for sludge incineration flue gas
CN201706482U (en) Useful device for boiler to combust rice hulls
CN206456979U (en) Pebble coal positive pressure pneumatic conveying device
CN202590728U (en) Automatically-proportioning feeding device
CN201619819U (en) Self-adapting stone coal feed apparatus
CN105276591A (en) Boiler feeding system of paper mill sludge incineration boiler
CN205222084U (en) Two high -efficient continuous conveyor pumps
CN202175437U (en) Pneumatic ash-removing compressed-air delivery system
CN203203024U (en) Environment-friendly and energy-saving coal-injection combustion apparatus
CN209997333U (en) fly ash desulfurization system
CN201697110U (en) High-efficiency composite boiler
CN203082909U (en) High-mesh coal powder atomization device
CN210398958U (en) Pneumatic ash conveying system
CN205500288U (en) Strength material seals delivery pump

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100811

Termination date: 20131124