CN201507030U - Joint of concrete filled steel tubular column and reinforced concrete beam - Google Patents

Joint of concrete filled steel tubular column and reinforced concrete beam Download PDF

Info

Publication number
CN201507030U
CN201507030U CN2009201079176U CN200920107917U CN201507030U CN 201507030 U CN201507030 U CN 201507030U CN 2009201079176 U CN2009201079176 U CN 2009201079176U CN 200920107917 U CN200920107917 U CN 200920107917U CN 201507030 U CN201507030 U CN 201507030U
Authority
CN
China
Prior art keywords
joint
steel
concrete
filled steel
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201079176U
Other languages
Chinese (zh)
Inventor
王冬雁
林冰
杭英
胡凤琴
耿冬青
宋富渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN2009201079176U priority Critical patent/CN201507030U/en
Application granted granted Critical
Publication of CN201507030U publication Critical patent/CN201507030U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

A joint of a concrete filled steel tubular column and a reinforced concrete beam belongs to the field of building structures, and comprises the concrete filled steel tubular column (1) and the cast-in-situ reinforced concrete beam (2). The joint is characterized in that a longitudinal bar (3) in the beam is connected with the concrete filled steel tubular column (1) through a straight-through pull rod (4), steel sleeves (6) are sleeved at two ends of the straight-through pull rod and threaded with the longitudinal beam (3) in the beam, and hooped reinforcements (5) with 50-80mm space between each other are densely arranged in the joint area of the beam. When the joint serves as a side-column joint, one end of the straight-through pull rod (4) is welded on a ring plate (7). The joint does not require the field welding process, solves the difficulty in connection of reinforced concrete structure and concrete-filled steel structure, realizes simple construction and has the advantages of wide application in the building structure field and wide application prospect.

Description

Steel core concrete column and steel concrete girder connection
Technical field
Steel core concrete column and steel concrete girder connection are a kind of node connected modes, belong to the building structure technology field.
Background technology
In civil construction project, use the history in existing more than 80 year of steel core concrete column, China is from nineteen fifty-nine the begin one's study performance and the application of steel core concrete column, steel core concrete column has characteristics such as high strength, superior performance, easy construction, the advantage of traditional member structure system is further brought into play, especially high-rise, stride greatly, in the building of heavy duty and antidetonation, can satisfy a series of requirements of design and construction preferably, in the high level of building field and super highrise building, be extensive use of at present.
The validity that steel core concrete column is connected with members such as beam, plates is the integrally-built rigidity of influence, stable and supporting capacity directly, also has influence on site operation difficulty and construction speed.Owing to the be connected complexity of steel core concrete column with beam, force path is unintelligible, and difficulty of construction is big, and our country does not also have perfect design of node and the theory of construction of a cover so far, the node connected mode of existing steel core concrete column and reinforced concrete beam is comparatively complicated, and field Welding technology is more.
The utility model content
Under the prerequisite that guarantees node power transmission validity, we have improved steel core concrete column and steel concrete girder connection connected mode by research, have reduced difficulty of construction.The utility model can provide a kind of field Welding technology few, and power transmission is clear and definite, the connected mode of convenient construction, and the side column node that this node connected mode both can be used for structure also can be used for king post joint, can be widely used in the antidetonation area.
Structure of the present utility model connects as shown in Figure 1, 2, comprises steel core concrete column 1 and cast-in-situ steel reinforced concrete beam 2; It is characterized in that: vertical muscle 3 links together by punching pull bar 4 and steel core concrete column 1 in the beam, and steel sleeve 6 is connected node area layout stirrup 5 in the beam after being enclosed within the two ends of punching pull bar 4 with vertical muscle 3 in the beam;
When node is the side column node, adopt ring flat-plate 7, punching pull bar 4 one ends are welded on the ring flat-plate in the side column end.
Vertical muscle 3 and punching pull bar 4 adopt and are threaded in steel sleeve 6 and the beam, and steel sleeve length is greater than 100mm; To satisfy the anchoring requirement.
Punching pull bar 4 adopts notched bars, and in order to increase and concrete adhesive property, reach is greater than 100mmm on it, and vertical muscle is equal in its diameter and the beam.
Stirrup 5 spacings are that 50-80mm gathers, to increase the node area shear behavior.
Adopt this node not need field Welding technology, easy construction.This node can make node shearing and moment of flexure effectively be delivered in the steel pipe column by the punching pull bar, and power transmission is clear and definite.This node has been simplified work progress greatly owing to adopted the sleeve pipe connection, has accelerated construction speed, can be widely used in building structure field, has broad application prospects.
Description of drawings
Fig. 1 is the king post joint elevation
Fig. 2 is a side column node elevation
Fig. 3 is the sectional view of Fig. 1 along A-A
Fig. 4 is the sectional view of Fig. 2 along B-B;
Among the figure: 1 steel core concrete column, 2 cast-in-situ steel reinforced concrete beams, vertical muscle in 3 beams, 4 punching pull bars, 5 stirrups, 6 steel sleeves, 7 ring flat-plates.
The specific embodiment
Steel core concrete column and steel concrete girder connection comprise steel core concrete column 1 and cast-in-situ steel reinforced concrete beam 2; It is characterized in that: vertical muscle 3 links together by punching pull bar 4 and steel core concrete column 1 in the beam, and steel sleeve 6 is connected node area layout stirrup 5 in the beam after being enclosed within the two ends of punching pull bar 4 with vertical muscle 3 in the beam.
Embodiment 1
Steel core concrete column and steel concrete girder connection be as shown in Figure 1: the steel pipe in the steel core concrete column 1 carries out perforate in steel work processing factory handles, punching pull bar 4 and steel sleeve 6 are carried out the processing of screw thread mantle fiber in advance, and thread bush filament length degree is greater than 100mm in the punching pull bar 4.Punching pull bar 4 is passed hole on the steel core concrete column 1, two ends put steel sleeve 6, after steel pipe is located in the steel core concrete column 1, vertical muscle 3 is threaded with steel sleeve 6 in the beam, carry out the colligation of stirrup 5 afterwards, spacing is 50-80mm, and reinforcing bar binding finishes in the back cast steel pipe and concrete in the beam in beam.
Embodiment 2
See Fig. 2 when for the side column node, other measures are just adopted ring flat-plate 7 with embodiment 1 in the side column end, punching pull bar 4 one ends are welded on the ring flat-plate, to increase anchoring property.

Claims (2)

1. steel core concrete column and steel concrete girder connection comprise steel core concrete column (1) and cast-in-situ steel reinforced concrete beam (2); It is characterized in that: vertical muscle (3) links together by punching pull bar (4) and steel core concrete column (1) in the beam, and steel sleeve (6) is threaded node area layout stirrup (5) in the beam after being enclosed within the two ends of punching pull bar (4) with vertical muscle (3) in the beam;
When node is the side column node, adopt ring flat-plate (7), punching pull bar (4) one ends are welded on the ring flat-plate in the side column end.
2. steel core concrete column according to claim 1 and steel concrete girder connection is characterized in that, the spacing of described stirrup (5) is 50-80mm.
CN2009201079176U 2009-05-06 2009-05-06 Joint of concrete filled steel tubular column and reinforced concrete beam Expired - Fee Related CN201507030U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201079176U CN201507030U (en) 2009-05-06 2009-05-06 Joint of concrete filled steel tubular column and reinforced concrete beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201079176U CN201507030U (en) 2009-05-06 2009-05-06 Joint of concrete filled steel tubular column and reinforced concrete beam

Publications (1)

Publication Number Publication Date
CN201507030U true CN201507030U (en) 2010-06-16

Family

ID=42468159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201079176U Expired - Fee Related CN201507030U (en) 2009-05-06 2009-05-06 Joint of concrete filled steel tubular column and reinforced concrete beam

Country Status (1)

Country Link
CN (1) CN201507030U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541433A (en) * 2013-09-22 2014-01-29 沈阳建筑大学 Fabricated concrete hooking type joint
CN103993671A (en) * 2014-06-12 2014-08-20 中国建筑设计研究院 Joint of concrete-filled steel-tubular column and steel beam and architectural structure system
CN104863271A (en) * 2015-05-29 2015-08-26 重庆大学 Concrete-filled steel tube column-reinforced concrete beam joint connection method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541433A (en) * 2013-09-22 2014-01-29 沈阳建筑大学 Fabricated concrete hooking type joint
CN103541433B (en) * 2013-09-22 2015-12-09 沈阳建筑大学 Assembly concrete hook-hang type node
CN103993671A (en) * 2014-06-12 2014-08-20 中国建筑设计研究院 Joint of concrete-filled steel-tubular column and steel beam and architectural structure system
CN104863271A (en) * 2015-05-29 2015-08-26 重庆大学 Concrete-filled steel tube column-reinforced concrete beam joint connection method
CN104863271B (en) * 2015-05-29 2018-02-02 重庆大学 A kind of steel core concrete column reinforced beam joint connecting method

Similar Documents

Publication Publication Date Title
CN101550728B (en) The nodes and construction method for concrete filled steel tubular column and in-situ reinforced concrete beam
CN106894523B (en) Connecting joint of rectangular steel pipe concrete column and steel reinforced concrete beam
CN105888080B (en) Assembled steel pipe sleeve reinforced concrete combined node and mounting method
CN102650168B (en) Connecting method and connection joint for concrete-filled steel square tubular columns and steel beams
CN203174771U (en) Annular plate node of steel pipe concrete column and bonded prestress steel bar concrete beam
CN205777098U (en) A kind of detachable assembling type concrete-filled circular steel tube column
CN203096945U (en) Novel panel point of concrete-filled steel tubular column, reinforced concrete beam having bonding pre-stressing force and ring beam
CN104032864B (en) The web perforate H section steel connecting node that buckling-restrained steel plate wall is connected with concrete frame
CN2390933Y (en) Square steel pipe concrete beam and column jointing gusset
CN102071747A (en) Joint of square steel tube concrete column and reinforced concrete floor and production method thereof
CN201507030U (en) Joint of concrete filled steel tubular column and reinforced concrete beam
CN208023713U (en) A kind of prefabrication and assembly construction steel reinforced concrete beam column connection structure
CN101545283A (en) Steel reinforced concrete column and cast-in-site reinforced concrete girder connection and construction method thereof
CN113323135A (en) Assembly type steel pipe column and concrete beam connecting component
CN201416214Y (en) Joint of profile steel concrete column and reinforced concrete beam
CN101161955A (en) Bidirectional girder compound floor construction method
CN217537350U (en) Assembled type steel reinforced concrete beam column connecting node with inner and outer steel sleeves
CN106939643B (en) Special-shaped combined structure of assembled large cylinder-in-cylinder circular steel pipe column and installation method
CN202124938U (en) Stirrup stiffness barrel of beam column joint of frame structure
CN215406520U (en) Flange outer ring compound steel pipe concrete column-steel beam self-resetting energy dissipation node
CN214738848U (en) Connecting structure of suspension post and truss
CN214302387U (en) Steel pipe concrete bundle combined shear wall internally provided with composite pipe for restraining steel reinforced concrete column
CN202131678U (en) Connection node of energy-saving fireproof beam column
CN114000620A (en) Built-in trompil steel sheet compound shear wall
CN208533863U (en) A kind of prefabricated girder of armored concrete

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100616

Termination date: 20140506