CN201490626U - Asymmetrical towing plate for one-drag-three tension stringing - Google Patents

Asymmetrical towing plate for one-drag-three tension stringing Download PDF

Info

Publication number
CN201490626U
CN201490626U CN2009201729808U CN200920172980U CN201490626U CN 201490626 U CN201490626 U CN 201490626U CN 2009201729808 U CN2009201729808 U CN 2009201729808U CN 200920172980 U CN200920172980 U CN 200920172980U CN 201490626 U CN201490626 U CN 201490626U
Authority
CN
China
Prior art keywords
plate body
traction plate
guiding arm
tie
towing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201729808U
Other languages
Chinese (zh)
Inventor
缪谦
夏拥军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN2009201729808U priority Critical patent/CN201490626U/en
Application granted granted Critical
Publication of CN201490626U publication Critical patent/CN201490626U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model provides an asymmetrical towing plate capable of meeting the requirement of one-drag-three tension stringing construction, which comprises a towing plate body, an anti-twist device, a large guide pulling plate for connecting a main pulling rope, and small guide pulling plates for connecting conducting wires; the front end of the towing plate body is provided with the large guide pulling plate; the rear end of the towing plate body is provided with the small guide pulling plates and the anti-twist device; and the towing plate body adopts an asymmetrical structure, an axial wire of the anti-twist device is taken as a separation line, and one side of the towing plate body is provided with one small guide pulling plate, while the other side is provided with two small guide pulling plates. On the premise of ensuring construction safety, a one-drag-three tension stringing scheme is realized through the asymmetrical towing plate, and a requirement of a one-drag-three tension stringing construction process on stress reasonability of the towing plate is met, so that the construction efficiency is improved, the construction scheme is simplified, the construction cost is saved, the construction quality is ensured, and the asymmetrical towing plate has good economic and social benefits.

Description

A kind of " one leads three " tension stringing asymmetric traction plate
Technical field
The utility model belongs to overhead transmission line tension stringing construction equipment field, is specifically related to a kind of " one leads three " tension stringing asymmetric traction plate.
Background technology
Tension stringing is meant construction equipment and facility spreading conducting wires such as using hauling machine, tensioner, releasing pulley, towing plate, lead is let slip in exhibition had certain force of strain in the journey, be put into a kind of payingoff construction method on each basic shaft tower in the unwrapping wire section thereby liftoff, the across obstacle of soaring is built on stilts state exhibition.At present, tension stringing has become the main form of construction work that domestic and international general overhead transmission line conductor sets up, compares artificial unwrapping wire, its have the lead wearing and tearing little, save manpower, improve clear superiorities such as work efficiency.
The connection situation of various device, facility, line, rope as shown in Figure 1 in the tension stringing: guiding rope 1 front end links to each other with hauling machine, tail end links to each other with main pull rope 2; The tail end of main pull rope 2 uses steel wire rope to link to each other with towing plate 4 with rotary connector 3; Towing plate 4 afterbodys link to each other with quilt exhibition lead 6 with rotary connector 5 by lead; Lead 6 tail ends are then reeled and are connected on the tensioner.Tension stringing divides following step to carry out: at first use artificial or alternate manner spreading guiding rope (being generally the composite fibre rope), utilize guiding rope traction exhibition to put main pull rope (being generally steel wire rope) again, at last with main pull rope traction spreading conducting wire.The length of general unwrapping wire section has how basic transmission tower therebetween in 8 kilometers, need hang releasing pulley on every basic shaft tower during unwrapping wire, so that provide support and passage is put in exhibition for lead.Therefore, towing plate and releasing pulley are the indispensable facility of tension stringing, have important function to finishing wire erection, guardwire, raising payingoff construction efficient.
Current widely used towing plate and releasing pulley structurally all are symmetric forms, as: one leads two towing plates, leads four towing plates, and leads six towing plates and and lead eight towing plates, and releasing pulley correspondingly is respectively three wheel line tackles, five wheel line tackles, seven-wheel line tackle and nine wheel line tackles.The exhibition that above-mentioned towing plate and the corresponding supporting use of releasing pulley can be satisfied two bundle conductors, conductors on quad bundled, six-multiple conductor and eight bundle conductors is respectively put needs and (single conductor is only used the single-wheel releasing pulley, need not towing plate, main pull rope directly is connected with lead).Fig. 2 leads two symmetric form towing plates for tradition one, mainly is made up of big guiding arm-tie 11, traction plate body 12, little guiding arm-tie 13 and anti-twister 14.Traction plate body 12 is a symmetrical structure, and the big guiding arm-tie 11 that is connected with main pull rope is positioned at the front end center position of traction plate body 12; Anti-twister 14 is positioned at the tail end center position of traction plate body 12; Two little guiding arm-ties 13 that link to each other with lead are positioned at the tail end of traction plate body 12, relatively towing plate center symmetric arrangement.In the unfolding conductor process, when there are the small number of bad different time in the degree of lengthening of exhibition of two leads, overhang etc., anti-twister 14 can prevent the upset of towing plate.Figure 3 shows that three wheel line tackles that match with Fig. 2, it mainly is made up of link plate 23, support 24, bolster 26, a wire rope pulley 25 and two lead pulleys 27 etc.Wherein wire rope pulley is positioned at the coaster center, in order to restrict and main pull rope by guiding; Two relative wire rope pulley symmetric arrangement of lead pulley are in order to pass through lead; Using the suppending hole 22 of connector 21 such as steel wire rope by link plate that releasing pulley is hanging on the transmission tower or directly is suspended on the insulator string.
Along with improving constantly of China's overhead transmission line electric pressure, the sectional dimension of transmission pressure correspondingly and weight are also in continuous increase, and the load that unwrapping wire equipment such as hauling machine, tensioner are born also increases thereupon.When multiple fission conductor is put in exhibition, require its each root lead to open up synchronously and put, to reduce the influence that creep causes lead.But for heavy in section, multiple fission conductor, because its weight is bigger, existing both at home and abroad separate unit pulling equipment can't satisfy the needs that all leads are put in disposable exhibition simultaneously.As six division large-section leads, an existing hauling machine can't once all be opened up its six conductors and put, restricted by existing towing plate and releasing pulley, can only open up and put by adopting six groups " one leads one ", three groups " one leads two " or " one the leads two "+mode of " leads four ", to satisfy construction requirement.Cause thus that simultaneously used device is many, construction is complicated, efficient is low, synchronism is difficult for assurance.Therefore, for make full use of existing open the equipment that leads, to greatest extent performance existing open lead capacity of equipment, minimizing equipment drops into, improves efficiency of construction, adopting two groups of " one leads three " modes to open up to put six division large-section leads is a kind of more economic, construction plan efficiently.If will have now one lead four towing plates be used for " one leads three " construction, because the lead radical difference that the towing plate both sides connect, it will produce moment of torsion to towing plate, and anti-twister can't overcome so big moment of torsion, thereby cause the towing plate upset and construction is put in the exhibition that can't realize.
The utility model content
For overcoming above-mentioned defective, the purpose of this utility model is to provide a kind of existing tensioner, hauling machine of making full use of, for simplifying six division large-section lead unfolding process, improve payingoff construction efficient, ensureing the payingoff construction quality, provide a kind of and satisfy the asymmetric traction plate that " one leads three " unfolding conductor construction plan requires.
For this reason, the utility model is taked following technical scheme: a kind of " one leads three " tension stringing asymmetric traction plate, comprise traction plate body, anti-twister, be used to connect the big guiding arm-tie and the little guiding arm-tie that is used to be connected lead of main pull rope, the front end of described traction plate body is provided with big guiding arm-tie, the rear end of traction plate body is provided with little guiding arm-tie and anti-twister, described towing plate adopts unsymmetric structure, is provided with a little guiding arm-tie in case the axis of twister is a separator bar in a side of traction plate body, opposite side in traction plate body is provided with two little guiding arm-ties.
Wherein, the axis of described anti-twister coincides with the axis of big guiding arm-tie.
Wherein, the rear end of described traction plate body is provided with a contiguous block, and anti-twister is connected with this contiguous block by bearing pin, and the axis of described anti-twister and the axis of contiguous block coincide.
Wherein, equal the axis of two little guiding arm-ties of traction plate body opposite side to the vertical range sum of anti-twister axis in the axis of a little guiding arm-tie of traction plate body one side to the vertical range of anti-twister axis.
Wherein, be provided with balancing weight being provided with lightening hole on the side of the traction plate body that is provided with a little guiding arm-tie or being provided with on the side of traction plate body of two little guiding arm-ties.
The beneficial effects of the utility model are: asymmetric traction plate of the present utility model has realized " one leads three " tension stringing scheme under the prerequisite that guarantees construction safety, satisfied of the stressed requirement of reasonableness of " one leads three " tension stringing construction technology to towing plate, thereby improved efficiency of construction, simplified construction plan, saved construction cost, ensured construction quality, had good economic and social benefit.
Description of drawings
The connection diagram of the various facility that Fig. 1 uses for traditional symmetric form towing plate and tension stringing, line, rope;
Fig. 2 is put the structural representation that one of two bundle conductors lead two symmetric form towing plates for the tradition exhibition;
Fig. 3 for Fig. 2 in the structural representation of three wheel line tackles that adapt of symmetric form towing plate, wherein Fig. 3 a is the front view of three wheel line tackles, Fig. 3 b is the end view of three wheel line tackles;
Fig. 4 is the structural representation of asymmetric traction plate of the present utility model;
The schematic diagram that the asymmetric releasing pulley that Fig. 5 adapts with it for asymmetric traction plate of the present utility model is used.
Embodiment
Below in conjunction with accompanying drawing asymmetric traction plate of the present utility model is described in further detail.
As shown in Figure 4, asymmetric traction plate of the present utility model mainly comprises big guiding arm-tie 31, traction plate body 32, little guiding arm-tie 33 and anti-twister 34, the front end of described traction plate body 32 is welded with a big guiding arm-tie 31, be welded with a contiguous block 37 in the rear end of traction plate body 32, this contiguous block 37 and anti-twister 34 are connected by bearing pin, and described big guiding arm-tie 31, contiguous block 37 and anti-twister 34 are positioned on the same axis.Described traction plate body 32 adopts unsymmetric structure, be welded with little guiding arm-tie 33 respectively in the both sides of traction plate body 32, (axis of promptly big guiding the arm-tie 31 and axis of contiguous block 37) is welded with a little guiding arm-tie 33 for separator bar, is used to be connected a lead, is connected to two little guiding arm-ties 33, is used to connect two leads at the face down bonding of traction plate body 32 in the left side of traction plate body 32 in case the axis of twister 34.As shown in Figure 5, following requirement should be satisfied in the position of little guiding arm-tie 33: the axis of two little guiding arm-ties 33 on described traction plate body 32 right sides to anti-twister 34 axis apart from sum (S1+S2) equal traction plate body 32 left sides a little guiding arm-tie 33 the axis to anti-twister 34 axis apart from S3, be S1+S2=S3, at this moment, the both sides lead is a balance to the moment of the big relatively guiding arm-tie axis (promptly main pull rope direction) of towing plate generation.
(being traction plate body left side among Fig. 4) is provided with a lightening hole 35 on the traction plate body 32 that can connect lead one side, perhaps (being traction plate body right side among Fig. 4) is provided with a balancing weight 36 on the traction plate body 32 that can connect two lead one sides, the setting of lightening hole 35 or balancing weight 36, the center of gravity of traction plate body (containing little guiding arm-tie) is positioned on the central axis of big guiding arm-tie and anti-twister, also is balance under the deadweight effect thereby make traction plate body.By adopting the said structure scheme and being equipped with anti-twister, guaranteed that towing plate can not overturn in the unwrapping wire process.
As shown in Figure 5, asymmetric traction plate of the present utility model needs to be used the tension stringing of finishing " one leads three " with asymmetric releasing pulley in use.Asymmetric releasing pulley mainly comprises link plate 43, support 44, wire rope pulley 45, bolster 46 and lead pulley 47, described wire rope pulley 45 is positioned at the coaster middle part, described wire rope pulley 45 1 sides are installed a lead pulley 47, described wire rope pulley 45 opposite sides are installed two lead pulleys 47, and described wire rope pulley 45 and lead pulley 47 all can freely rotate around described bolster 46.Described bolster 46 is bearing on the described support 44, and the support top connects described link plate 43.Described link plate 43 is provided with two or three suppending holes.Install two lead pulley one sides two lead pulleys the race center line of race center line to the race center line that equals another lead pulley apart from sum (S1+S2) of the race center line of wire rope pulley to wire rope pulley apart from S3, i.e. S1+S2=S3.The position of position and the relative wire rope pulley of lead pulley of asymmetric releasing pulley that also is the big relatively guiding arm-tie of little guiding arm-tie of asymmetric traction plate is one to one.One side of a lead pulley of installation of asymmetric releasing pulley can be installed 1~3 equalizer pulley 48, in order to the asymmetry that balance or the deadweight of partial equilibrium coaster are caused, makes the whole center of gravity of releasing pulley near coaster central authorities.The center in the side-by-side mounting hole 42 on the link plate 43 of asymmetric releasing pulley is corresponding with the axial centre of outermost two the lead pulleys in two ends respectively, or about these two lead pulley axial centre each pulley spindle in width range.Use two connectors 41 that releasing pulley is hung on the transmission tower.Asymmetric releasing pulley suffered asymmtric load in guiding rope, pull rope and unfolding conductor process is delivered on the transmission tower by connector 41, thereby has guaranteed the stable of releasing pulley work.
When using asymmetric traction plate of the present utility model to carry out " one leads three " tension stringing, as shown in Figure 1, asymmetric traction plate is identical with traditional symmetric form towing plate with the connection of other facility, line, rope.At first use two connectors it to be suspended on the transmission tower by two suppending holes outside the asymmetric releasing pulley link plate as shown in Figure 5, to guide rope with artificial or alternate manner then opens up on the wire rope pulley that is put into all asymmetric releasing pulleys in the unwrapping wire section in turn, use hauling machine tractive guiding rope at last, and then tractive master pull rope, thereby the pulling asymmetric traction plate is passed through each asymmetric releasing pulley successively, can with unfolding conductor to the lead pulley of each asymmetric releasing pulley, when arriving unwrapping wire section terminal point, finish towing plate unfolding conductor.Asymmetric traction plate of the present utility model has satisfied the stressed requirement of reasonableness of " one leads three " tension stringing construction technology to towing plate and releasing pulley, and efficient improves, saves cost, quality assurance, simplifies the operation.
The utility model is described according to specific exemplary embodiment herein.To carry out suitable replacement under the scope of the present utility model or revise will be conspicuous not breaking away to one skilled in the art.Exemplary embodiment only is illustrative, rather than to the restriction of scope of the present utility model, scope of the present utility model is by appended claim definition.

Claims (5)

1. " one leads three " tension stringing asymmetric traction plate, it is characterized in that: this towing plate comprises traction plate body (32), anti-twister (34), be used to connect the big guiding arm-tie (31) and the little guiding arm-tie (33) that is used to be connected lead of main pull rope, the front end of described traction plate body (32) is provided with big guiding arm-tie (31), the rear end of traction plate body (32) is provided with little guiding arm-tie (33) and anti-twister (34), described towing plate adopts unsymmetric structure, is provided with a little guiding arm-tie (33) in case the axis of twister (34) is a separator bar in a side of traction plate body (32), opposite side in traction plate body (32) is provided with two little guiding arm-ties (33).
2. asymmetric traction plate according to claim 1 is characterized in that: the axis of described anti-twister (34) coincides with the axis of big guiding arm-tie (31).
3. asymmetric traction plate according to claim 1 and 2, it is characterized in that: the rear end of described traction plate body (32) is provided with a contiguous block (37), anti-twister (34) is connected with this contiguous block (37) by bearing pin, and the axis of the axis of described anti-twister (34) and contiguous block (37) coincides.
4. asymmetric traction plate according to claim 1 is characterized in that: equal the axis of two little guiding arm-ties (33) of traction plate body (32) opposite side to the vertical range sum of anti-twister (34) axis in the axis of the little guiding arm-tie (33) of traction plate body (32) one sides to the vertical range of anti-twister (34) axis.
5. according to claim 1 or 4 described asymmetric traction plate, it is characterized in that: be provided with balancing weight (36) being provided with lightening hole (35) on the side of the traction plate body (32) that is provided with a little guiding arm-tie (33) or being provided with on the side of traction plate body (32) of two little guiding arm-ties (33).
CN2009201729808U 2009-08-21 2009-08-21 Asymmetrical towing plate for one-drag-three tension stringing Expired - Lifetime CN201490626U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201729808U CN201490626U (en) 2009-08-21 2009-08-21 Asymmetrical towing plate for one-drag-three tension stringing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201729808U CN201490626U (en) 2009-08-21 2009-08-21 Asymmetrical towing plate for one-drag-three tension stringing

Publications (1)

Publication Number Publication Date
CN201490626U true CN201490626U (en) 2010-05-26

Family

ID=42429493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201729808U Expired - Lifetime CN201490626U (en) 2009-08-21 2009-08-21 Asymmetrical towing plate for one-drag-three tension stringing

Country Status (1)

Country Link
CN (1) CN201490626U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102403673A (en) * 2011-10-21 2012-04-04 安徽送变电工程公司 Novel 2* one-drag-three tension stringing construction process
CN105576552A (en) * 2014-11-05 2016-05-11 辽宁省送变电工程公司 Tension stringing self-balancing wire paying-out tackle and towing plate
CN107834435A (en) * 2017-11-03 2018-03-23 中国水利水电第四工程局有限公司 Self-balancing unfolding conductor limp

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102403673A (en) * 2011-10-21 2012-04-04 安徽送变电工程公司 Novel 2* one-drag-three tension stringing construction process
CN105576552A (en) * 2014-11-05 2016-05-11 辽宁省送变电工程公司 Tension stringing self-balancing wire paying-out tackle and towing plate
CN105576552B (en) * 2014-11-05 2018-02-02 辽宁省送变电工程公司 A kind of tension stringing self-balancing releasing pulley and towing plate
CN107834435A (en) * 2017-11-03 2018-03-23 中国水利水电第四工程局有限公司 Self-balancing unfolding conductor limp

Similar Documents

Publication Publication Date Title
CN101582572B (en) Method of extra-high voltage tension stringing
CN101651306B (en) Asymmetric traction plate and matching stringing pulley for one-pull-three tension stringing
CN100464474C (en) Live line replacing method high voltage transmission line strain insulator-string and device
CN102447242B (en) Combined structure of suspension insulator string and strain clamp and construction method thereof
CN201490626U (en) Asymmetrical towing plate for one-drag-three tension stringing
CN201260047Y (en) Asymmetric line discharging tackle
CN102403673A (en) Novel 2* one-drag-three tension stringing construction process
CN2821968Y (en) Balance wheel type walking plate anti-twist device
CN101582571A (en) Multi-supporting point self balancing paying-off tackle
CN101969184A (en) Pay-off tackle
CN102025119B (en) Paying-off system and method
CN2404241Y (en) Apparatus capable of changing strain insulator-chain electrical insulator
CN101877460A (en) Extreme high voltage combined paying off pulley
CN202353087U (en) Tension stringing pulley suspension device
CN102709856B (en) A kind of UHV transmission line cross yoke plate
CN101789568A (en) Symmetrical arrangement force balance type tackle for paying-off with a pull walking board and three wires and pull walking board
CN201038654Y (en) Power off wire- surpassing runaway
CN203411907U (en) Puller for cable releasing of suspension bridge
CN208316184U (en) One kind eight divides large-section lead tension stringing coaster hanger
CN206727535U (en) A kind of electric power cable trailing frog
CN202405723U (en) Combined structure for suspension insulator strings and strain clamps
CN204538561U (en) Unwrapping wire traction limp in a kind of electric power system
CN103500963B (en) A kind of suspension arrangement of " one leads four+one leads two " releasing pulley
CN207218127U (en) A kind of high intensity packway bar
CN206477182U (en) A kind of 9 special pre-formers of strand steel wire rope parallel twisting

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: CHINA ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20140307

Owner name: CHINA ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20140307

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100192 HAIDIAN, BEIJING TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20140307

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: China Electric Power Research Institute

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Patentee before: China Electric Power Research Institute

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20100526

CX01 Expiry of patent term