CN201475559U - Rapid assembling structure for faucet pipe fittings - Google Patents

Rapid assembling structure for faucet pipe fittings Download PDF

Info

Publication number
CN201475559U
CN201475559U CN2009201388269U CN200920138826U CN201475559U CN 201475559 U CN201475559 U CN 201475559U CN 2009201388269 U CN2009201388269 U CN 2009201388269U CN 200920138826 U CN200920138826 U CN 200920138826U CN 201475559 U CN201475559 U CN 201475559U
Authority
CN
China
Prior art keywords
valve body
transverse tube
threeway
water inlet
elastic card
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201388269U
Other languages
Chinese (zh)
Inventor
林锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Runner Industrial Corp
Original Assignee
Xiamen Runner Industrial Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Runner Industrial Corp filed Critical Xiamen Runner Industrial Corp
Priority to CN2009201388269U priority Critical patent/CN201475559U/en
Application granted granted Critical
Publication of CN201475559U publication Critical patent/CN201475559U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model relates to a rapid assembling structure for faucet pipe fittings, which comprises a three-way cross pipe and a three-way stand pipe. One or more elastic clamping pieces are arranged in the position where the water inlet valve bodies on the three-way cross pipe and the three-way stand pipe are matched; grooves for containing the elastic clamping pieces are respectively arranged on the water inlet valve body of the three-way stand pipe and the three-way cross pipe corresponding to the elastic clamping pieces; the elastic clamping pieces are clamped on the grooves of the three-way cross pipe and the water inlet valve body; a limiting budge is arranged at the end part of the water inlet valve body; a gear block is arranged in the water inlet valve body; a limiting block matched with the limiting budge and a bump matched with the gear block are arranged on the outer wall of the three-way cross pipe; and the bump on the three-way cross pipe is clamped in the position of the gear block of the water inlet valve body. By adopting the structure, the accurate matching, mounting and positioning of all pipelines are realized, the connection is rapid, the combination is firm, the pipelines are ensured not to leak, the rapid installation of the pipelines is realized, and simultaneously the structure is simple, therefore, the production cost is also greatly reduced.

Description

The quick assembly structure of a kind of leading pipe fitting
Technical field
The utility model is the linkage structure of relevant a kind of water channel of outlet water unit, is meant a kind of quick assembly structure of leading pipe fitting that hot and cold water mixes water-bound that has especially.
Background technique
The water tap of household use now has hot water or cold water's intake pipe more and is split into the water tap that mixes the water water outlet, and its inner core tube is to be made of two vertical tubes and a transverse tube that is communicated with two vertical tubes, and this transverse tube middle part is for blending the mouth of a river with the fit adjustment valve.Present inner core tube mostly is the metallic copper integrally casting and forms, and metal has the requirement of strength that advantages of high strength can adapt to installation, but present resource comparatively lacks, and holding at high price of metal causes the cost of material of inner core tube higher.In addition, this inner core tube is the structure that is formed by three part three-way pipes, comparatively difficult when once-through, adopt to decompose partly and be welded again after the moulding, but two deficiencys can appear, the one, need to guarantee that two vertical tubes be arranged in parallel in same plane, two vertical tubes guarantee and the angle of inclination of transverse tube upper water-out mouth again simultaneously, hold than difficult during secondary operations; The 2nd, mostly each welding position that partly engages is the stress concentrated position, promptly when water tap is installed on the washbasin, the application of force direction of lock-connecting piece can make between vertical tube and the transverse tube and produce warping force, or in use, operation application of force direction on the tap, also can cause between vertical tube and the transverse tube and produce warping force, the existence of two kinds of factors very easily makes leading inner core tube fracture take place and the working life of influence tap in the welding position.
Therefore; cooperate Figure 10; shown in 11; the designer of this case has designed a kind of carriage A of inner core tube; it can be placed on the vertical tube B1 of leading inner core tube B and the junction point of transverse tube B2; this carriage A can have the effect of a location reinforcement to the relative position of two vertical tube B1 and transverse tube B2; when tap is installed; when the application of force direction of lock-connecting piece or operation outlet water control valve; be subjected to the restriction of carriage A; can prevent to produce warping force between vertical tube B1 and the transverse tube B2; with this effect that reaches protection inner core tube B, avoid occurring the phenomenon that fracture takes place the inner core tube junction point, the working life of further improving leading inner core tube B.
Setting based on this carriage, then inner core tube can adopt the plastic cement material moulding, utilize the quilt of carriage can realize the function of metal inner core tube by force equally, but, be subjected to the restriction of this tap inner core tube special shape, plastic cement material can't be realized one-body molded, still need resolve into three and partly carry out secondary and be connected and fixed, how making the pipeline of this tap inner core tube connect quick, the accurate and firm connection of realization, is the reason that this case produces.
The model utility content
The purpose of this utility model provides the quick assembly structure of a kind of leading pipe fitting, and the cooperation of each pipeline is installed have accurate positioning, to connect fast, in conjunction with firm structure.
The following structure of this novel employing realizes above-mentioned purpose: the quick assembly structure of a kind of leading pipe fitting, comprise: the threeway transverse tube, the threeway vertical tube, be provided with one or more elastic cards at the threeway transverse tube with the water inlet valve body place of matching on the threeway vertical tube, on the water inlet valve body of the threeway vertical tube of each elastic card corresponding section and threeway transverse tube, be respectively equipped with the groove of ccontaining this elastic card, and elastic card fastens on the groove of the groove of threeway transverse tube and water inlet valve body, end on the water inlet valve body is provided with spacing preiection, in the water inlet valve body, be provided with the gear piece, on threeway transverse tube outer wall, be provided with the limiting stopper that matches with spacing preiection, with the projection that matches with the gear piece, the projection on the threeway transverse tube is stuck in the into gear piece place of water valve body.
Elastic card is two.
On the threeway transverse tube groove of ccontaining elastic card, be provided with and be easy to the recess hole that elastic card fixes.
Elastic card and threeway transverse tube are one-body molded, and at the one-body molded elastic card of the groove of threeway transverse tube, the groove two ends of the two ends of elastic card and threeway transverse tube are one.
Elastic card is a metal material.
In the water inlet valve body, be provided with and be easy to the oblique surface that elastic card passes through.
Be provided with the seal groove of placing seal ring on the threeway transverse tube, the threeway transverse tube places into and places seal ring on the water valve body.
Adopt the leading inner core tube structure of said structure, the cooperation installation that has realized each pipeline has accurate positioning, connect fast, in conjunction with firm structure, owing to used the elastic card structure, make the threeway transverse tube pack into and can not produce axial rotation behind the water inlet valve body on the threeway vertical tube, limited the axial displacement of threeway transverse tube, cooperate the gear piece on the threeway transverse tube to cooperate again with the projection of water inlet on the valve body, guaranteed that the threeway transverse tube does not produce radial displacement on the water inlet valve body, thereby guaranteed that the threeway transverse tube well is fixed on the water inlet valve body of threeway vertical tube, simultaneously because the use of seal ring, guarantee the threeway transverse tube be fixed on into do not produce radial and axial displacement on the water valve body in, also strengthened the sealing of threeway transverse tube and threeway vertical tube, guaranteed the non-leakage of pipeline, realize the quick mounting of pipeline, because this is simple in structure, also greatly reduced cost of production simultaneously.
Description of drawings
Fig. 1 is a three-dimensional exploded view of the present utility model;
Fig. 2 is an assembling schematic representation of the present utility model;
Fig. 3 is the plan view of Fig. 2;
Fig. 4 is the A-A direction sectional view of Fig. 3;
Fig. 5 is the B-B direction sectional view of Fig. 2;
Fig. 6 is the C-C direction sectional view of Fig. 2;
Fig. 7 is the N-N direction sectional view of Fig. 6;
Fig. 8 is practical this novel another embodiment's a three-dimensional exploded view;
Fig. 9 is the sectional view of Fig. 8 along the water outlet direction;
Figure 10 is the partial sectional view of Fig. 1;
Figure 11 is the schematic perspective view of prior art;
Figure 12 is the combination schematic representation of prior art.
Embodiment
As shown in Figure 1, the quick assembly structure of a kind of leading pipe fitting, comprise: threeway transverse tube 4, threeway vertical tube 1, be provided with one or more elastic cards 3 at threeway transverse tube 4 with water inlet valve body 11 places of matching on the threeway vertical tube 1, elastic card 3 is two groups in this new embodiment, on the water inlet valve body 11 of the threeway vertical tube 1 of each elastic card 3 corresponding section and threeway transverse tube 4, be respectively equipped with the groove 114 of ccontaining this elastic card 3,43 (with reference to shown in Figure 10), and elastic card 3 fastens on the groove 114 of the groove 43 of threeway transverse tube 1 and water inlet valve body 11, end on water inlet valve body 11 is provided with spacing preiection 111, in water inlet valve body 11, be provided with gear piece 112, on threeway transverse tube 4 outer walls, be provided with the limiting stopper 41 that matches with spacing preiection 111, the projection 42 that matches with gear piece 112.After the assembling, as shown in Figure 4, the limiting stopper 41 on the threeway transverse tube 4 is stuck in into gear piece 112 places of water valve body 11, makes threeway transverse tube 4 displacement vertically.Elastic card 3 is a metal material in this new embodiment, and 45 is water outlet.
Referring to shown in Figure 10, be provided with in the valve body 11 in water inlet and be easy to the oblique surface 113 that elastic card 3 passes through, when this oblique surface 113 can make things convenient for threeway transverse tube 4 to enter into water valve body 11, elastic card 3 was easy to enter into in the water valve body 11.
On threeway transverse tube 4, be provided with the seal groove 44 of placing seal ring 2, be convenient to threeway transverse tube 4 and place in the water valve body 11, be sealed and matched with it.
On threeway transverse tube 4 grooves 43 of ccontaining elastic card 3, be provided with and be easy to the recess hole 46 that elastic card 3 fixes.
As Fig. 2-shown in Figure 7, during assembling, earlier elastic card 3 is inserted on the groove 43 of threeway transverse tube 4, the two ends of elastic card 3 are inserted in the recess hole 46 of groove 43, seal ring 2 is nested with on the seal groove 44 of threeway transverse tube 4, again threeway transverse tube 4 is inserted in the water inlet valve body 11 of threeway vertical tube 1, during insertion, limiting stopper 41 on the threeway transverse tube 4 inserts with gear piece 112 dislocation on the water inlet valve body 11, the swivel tee transverse tube 4 then, make limiting stopper 41 be stuck in gear piece 112 back (position as shown in Figure 4) on the water valve body 11 into, the spacing preiection 111 that intake on the valve body this moment also fastens on the projection 42 of threeway transverse tube 4, place the elastic card 3 of threeway transverse tube 4 grooves 43 also to be screwed in the groove 114 in the water valve body 11 simultaneously, because elasticity makes elastic card 3 fasten on groove 114 positions of the groove 43 of threeway transverse tube 4 and the valve body 11 of intaking (position as shown in Figure 7), Fig. 7 is the N--N sectional view of Fig. 6, also is the sectional view along water outlet 45 directions.
Fig. 8 and Fig. 9 are this another novel embodiment, in this embodiment, and the structure that elastic card 3 and threeway transverse tube 4 are formed in one.At the one-body molded elastic card 3 in groove 43 places of threeway transverse tube 4; Elastic card 3 can adopt with threeway transverse tube 4 one once injection molded, makes elastic card 3 be positioned at groove 43 places, and the two ends of the two ends of elastic card 3 and groove 43 are one.

Claims (7)

1. quick assembly structure of leading pipe fitting, comprise: the threeway transverse tube, the threeway vertical tube, it is characterized in that: be provided with one or more elastic cards with the water inlet valve body place of matching on the threeway vertical tube at the threeway transverse tube, on the water inlet valve body of the threeway vertical tube of each elastic card corresponding section and threeway transverse tube, be respectively equipped with the groove of ccontaining this elastic card, and elastic card fastens on the groove of the groove of threeway transverse tube and water inlet valve body, end on the water inlet valve body is provided with spacing preiection, in the water inlet valve body, be provided with the gear piece, on threeway transverse tube outer wall, be provided with the limiting stopper that matches with spacing preiection, with the projection that matches with the gear piece, the projection on the threeway transverse tube is stuck in the into gear piece place of water valve body.
2. the quick assembly structure of a kind of leading pipe fitting according to claim 1, it is characterized in that: elastic card is two.
3. the quick assembly structure of a kind of leading pipe fitting according to claim 1 is characterized in that: on the threeway transverse tube groove of ccontaining elastic card, be provided with and be easy to the recess hole that elastic card fixes.
4. the quick assembly structure of a kind of leading pipe fitting according to claim 1, it is characterized in that: elastic card and threeway transverse tube are one-body molded, at the one-body molded elastic card of the groove of threeway transverse tube, the groove two ends of the two ends of elastic card and threeway transverse tube are one.
5. the quick assembly structure of a kind of leading pipe fitting according to claim 1, it is characterized in that: elastic card is a metal material.
6. the quick assembly structure of a kind of leading pipe fitting according to claim 1 is characterized in that: be provided with in the water inlet valve body and be easy to the oblique surface that elastic card passes through.
7. according to the quick assembly structure of each described a kind of leading pipe fitting of claim 1-6, it is characterized in that: be provided with the seal groove of placing seal ring on the threeway transverse tube, the threeway transverse tube places into and places seal ring on the water valve body.
CN2009201388269U 2009-06-02 2009-06-02 Rapid assembling structure for faucet pipe fittings Expired - Fee Related CN201475559U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201388269U CN201475559U (en) 2009-06-02 2009-06-02 Rapid assembling structure for faucet pipe fittings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201388269U CN201475559U (en) 2009-06-02 2009-06-02 Rapid assembling structure for faucet pipe fittings

Publications (1)

Publication Number Publication Date
CN201475559U true CN201475559U (en) 2010-05-19

Family

ID=42411809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201388269U Expired - Fee Related CN201475559U (en) 2009-06-02 2009-06-02 Rapid assembling structure for faucet pipe fittings

Country Status (1)

Country Link
CN (1) CN201475559U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103732970A (en) * 2011-07-25 2014-04-16 埃尔比国际有限公司 Quick-connect system for connecting a tube to a receiving body, in particular for use in wall-mounted boilers and the like
CN104044628A (en) * 2014-06-30 2014-09-17 马鞍山纽泽科技服务有限公司 Connection steering component
CN106237468A (en) * 2016-08-29 2016-12-21 湖北益健堂科技股份有限公司 Laser oxygen therapy terminal
US9957698B2 (en) 2012-03-22 2018-05-01 As Ip Holdco, Llc Hybrid faucet assembly and water way for same

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103732970A (en) * 2011-07-25 2014-04-16 埃尔比国际有限公司 Quick-connect system for connecting a tube to a receiving body, in particular for use in wall-mounted boilers and the like
US9957698B2 (en) 2012-03-22 2018-05-01 As Ip Holdco, Llc Hybrid faucet assembly and water way for same
US10767352B2 (en) 2012-03-22 2020-09-08 As America, Inc. Hybrid faucet assembly and water way for same
CN104044628A (en) * 2014-06-30 2014-09-17 马鞍山纽泽科技服务有限公司 Connection steering component
CN106237468A (en) * 2016-08-29 2016-12-21 湖北益健堂科技股份有限公司 Laser oxygen therapy terminal
CN106237468B (en) * 2016-08-29 2018-09-07 湖北益健堂科技股份有限公司 Laser oxygen therapy terminal

Similar Documents

Publication Publication Date Title
CN201269379Y (en) Pipe connector with positioning function
CN201475559U (en) Rapid assembling structure for faucet pipe fittings
CN201007410Y (en) Pipe fitting with screw connection
CN201475461U (en) Injection molding structure of faucet inner core body
CN201487342U (en) Faucet injection structure
CN201526766U (en) Pipe fitting quickly-assembling structure
CN201420918Y (en) Quick assembling and fixing structure of faucet pipe fitting
CN105114652A (en) Steel-plastics ball valve structure
CN201420921Y (en) Quick assembling and fixing structure of faucet pipe fitting
CN102297613A (en) Header pressure-bearing heat exchanger
CN201391703Y (en) Conduit fast connecting device
CN201502819U (en) Pipe fitting fast assembling structure
CN201420926Y (en) Integrated assembly structure for pipeline
CN201420922Y (en) Quick connecting and fixing structure of faucet pipe fitting
CN202149866U (en) Plug structure for pressure resistance test of plastic tubes and pipes
CN202177324U (en) Header bearing type heat exchanger
CN209370550U (en) A kind of plastic tap main body
CN204628904U (en) A kind of water knockout drum
CN201818843U (en) Square sheep-horn faucet
CN202101577U (en) Heating radiator
CN205716170U (en) A kind of three way cock
CN201651607U (en) Copper plated internal thread straight joint
CN201462302U (en) Locating device for pipe connector
CN201241982Y (en) Sliding tightened type direct connecting valve for flexible tube
CN201475558U (en) Quick connecting structure of pipeline

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100519

Termination date: 20160602