CN201474318U - Wall building vertical reference device - Google Patents
Wall building vertical reference device Download PDFInfo
- Publication number
- CN201474318U CN201474318U CN2009201864710U CN200920186471U CN201474318U CN 201474318 U CN201474318 U CN 201474318U CN 2009201864710 U CN2009201864710 U CN 2009201864710U CN 200920186471 U CN200920186471 U CN 200920186471U CN 201474318 U CN201474318 U CN 201474318U
- Authority
- CN
- China
- Prior art keywords
- pillar
- reference line
- fixed
- wall
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a wall building vertical reference device. Support frames are respectively fixed on both ends of a struts, a reference line is connected between both ends of the struts, is supported and tightened by the two support frames, and is parallel to the struts, and a level instrument is arranged on the struts. The utility model has the advantages of simple and reasonable structure and convenient use, and can greatly improve the construction efficiency.
Description
Technical field
The utility model relates to a kind of bricklayer apparatus, specifically a kind of when building a wall as the vertical reference utensil.
Background technology
Whether bricklayer at present is perpendicular to the ground for determining body of wall when building a wall, the line that the utensil that is adopted is made up of a messenger wire and a weight hangs down and rod, which floor just need check once with rod with line is vertical every block, as seen, in the process of building a wall, hang down and rod inspection body of wall with line, need frequent inspection, the speed that causes building a wall is slowed down, and efficiency of construction is not high.
The utility model content
The purpose of this utility model is to provide a kind of and builds a wall vertically with reference to device, and when building a wall, it can be used as the reference standard of verticality.
For achieving the above object, the utility model adopts following scheme: build a wall vertically with reference to device, the two ends of a pillar are fixed with support respectively, are connected with reference line between the pillar two ends, reference line is supported, is tightened by two stands and be parallel with pillar, and level gauge is housed on pillar.
By such scheme as seen, when building a wall, after building out earlier wall high about six layers of brick and hanging it vertically, then the utility model is fixed on the metope with the reinforcing bar clip, after proofreading and correct its reference line vertically, can continue up to lay bricks according to reference line, behind upper end, again this be moved up with reference to device near reference line up to brick, and again its reference line is proofreaied and correct vertical, can up lay bricks again, so constantly repeat, promptly be built into the wall of desired height.
The utility model is simple and reasonable for structure, and it is easy to use, and can improve efficiency of construction greatly.
Description of drawings
The structure chart of Fig. 1 the utility model one embodiment and user mode figure;
The left view of Fig. 2 Fig. 1;
The A of Fig. 3 Fig. 1 is to view;
The B of Fig. 4 Fig. 1 is to view.
The specific embodiment
Further specify the utility model below in conjunction with embodiment and accompanying drawing.
Referring to Fig. 1, Fig. 2
The utility model provides, and build a wall the vertically two ends of the pillar 1 that has with reference to utensil are fixed with support 7 respectively, are connected with reference line 8 between pillar 1 two ends, and reference line 8 is supported, tightened by two stands 7 and be parallel with pillar 1, and level gauge 2 is housed on pillar 1.
Referring to Fig. 1, Fig. 2, Fig. 3
Referring to Fig. 1
Be fixed with a bearing 9 in the bottom of pillar 1, be connected with a bolt 13 on the bearing 9, be fixed with driving lever 12 on the bolt 13, a nut 11 is housed on bolt 13, nut 11 outsides are fixed with driving lever 10.In addition, on pillar 1, be provided with scale 3.
Referring to Fig. 1, Fig. 3, Fig. 4
Be fixed with cap 4 at the two ends of pillar 1, the both sides of cap 4 have the groove 4a parallel with reference line 8, and cap 4 upper ends that are in the top are fixed with a pole 5.
As seen from Figure 1, when building a wall, build out earlier the high wall 14 of six layers of brick and with its hang vertical after, then the utility model is fixed on the metope with reinforcing bar clip 15, by adjust with metope against bolt 9, and judge by level gauge 2 whether pillar 1 and reference line 8 be perpendicular to the ground, can proofread and correct reference line 8 and pillar 1 perpendicular to the ground.Reference line 8 is proofreaied and correct perpendicular to the ground after, can continue up lay bricks according to reference line, up to brick behind upper end near reference line, again this is moved up with reference to device, and again its reference line is proofreaied and correct vertically, can up lay bricks, so constantly repeat, promptly be built into the wall of desired height.When laying bricks, the thickness of the slurry therewith of laying bricks can be judged according to scale 3.
In addition, this vertically also can hang down to being used with reference to device and carry out vertical correction with line, in conjunction with Fig. 1, Fig. 3 as seen, when carrying out vertical correction with line is vertical, this vertically is fixed on the metope with reference to device, line is overhang hang on the pole 5 adjustment pillar 1, when the vertical messenger wire of line is parallel with the groove 4a on the upper and lower cap 4, show that promptly reference line 8 is perpendicular to the ground.
Claims (4)
1. build a wall vertically with reference to device, it is characterized in that: the two ends of a pillar are fixed with support respectively, are connected with reference line between the pillar two ends, and reference line is supported, tightened by two stands and be parallel with pillar, and level gauge is housed on pillar.
2. according to claim 1 building a wall vertically with reference to device, it is characterized in that: the two ends at pillar respectively are fixed with a cross bar, and the two ends of reference line are connected with cross bar, and reference line is two.
3. according to claim 1 building a wall vertically with reference to device is characterized in that: be fixed with a bearing in the bottom of pillar, be connected with a bolt on the bearing, be fixed with driving lever on the bolt, a nut is housed on bolt, the nut outside is fixed with driving lever.
4. according to claim 1 building a wall vertically with reference to device, it is characterized in that: the two ends at pillar are fixed with cap, and the both sides of cap have the groove parallel with reference line, and the cap upper end that is in the top is fixed with a pole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201864710U CN201474318U (en) | 2009-07-17 | 2009-07-17 | Wall building vertical reference device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201864710U CN201474318U (en) | 2009-07-17 | 2009-07-17 | Wall building vertical reference device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201474318U true CN201474318U (en) | 2010-05-19 |
Family
ID=42410564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201864710U Expired - Fee Related CN201474318U (en) | 2009-07-17 | 2009-07-17 | Wall building vertical reference device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201474318U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102061809A (en) * | 2010-12-29 | 2011-05-18 | 王道利 | Anti-deviation device for building wall |
CN102561713A (en) * | 2012-02-23 | 2012-07-11 | 中国十七冶集团有限公司 | Method for controlling building quality of concrete frame structure walls |
CN103940312A (en) * | 2013-11-15 | 2014-07-23 | 中铁十五局集团有限公司 | Measuring instrument for measuring corrugated pipe of precast beam or cast-in-place beam and measuring method thereof |
-
2009
- 2009-07-17 CN CN2009201864710U patent/CN201474318U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102061809A (en) * | 2010-12-29 | 2011-05-18 | 王道利 | Anti-deviation device for building wall |
CN102061809B (en) * | 2010-12-29 | 2012-10-24 | 王道利 | Anti-deviation device for building wall |
CN102561713A (en) * | 2012-02-23 | 2012-07-11 | 中国十七冶集团有限公司 | Method for controlling building quality of concrete frame structure walls |
CN102561713B (en) * | 2012-02-23 | 2014-03-19 | 中国十七冶集团有限公司 | Method for controlling building quality of concrete frame structure walls |
CN103940312A (en) * | 2013-11-15 | 2014-07-23 | 中铁十五局集团有限公司 | Measuring instrument for measuring corrugated pipe of precast beam or cast-in-place beam and measuring method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202509404U (en) | High-pier single-column capping beam framework construction support system | |
CN201474318U (en) | Wall building vertical reference device | |
CN201787952U (en) | Plumb bob rack | |
CN201260050Y (en) | 220KV bracket for replacing bus bar column insulator | |
CN202689517U (en) | Suspension type electric hanging basket support frame | |
CN202465215U (en) | Hanging basket mounting support for outer facade of building with slope roof | |
CN202323772U (en) | Upside-down hanging construction device for steel stranded wires of bridge V-shaped support | |
CN205132955U (en) | Hoist and mount operation of electric power industry low latitude is with hoist and mount frame | |
CN204919360U (en) | Novel hold in palm on adjustable U type top | |
CN202012701U (en) | Novel theodolite rack | |
CN201915632U (en) | Adjustable supporting structure of beam template | |
CN207347885U (en) | One kind can turnover type moving track | |
CN204163356U (en) | A kind of equipment installing inner wall panel | |
CN203903635U (en) | Textile supporting frame | |
CN202194073U (en) | Large-volume long-cantilever capping beam construction device | |
CN207131092U (en) | Floor concrete casting operation platform is built in a kind of room | |
CN201843083U (en) | V-shaped support frame | |
CN202899388U (en) | Multi-point semi-suspended light emitting diode (LED) integrated ceiling | |
CN207110772U (en) | A kind of ruggedized construction of sliding door track | |
CN201671060U (en) | Sliding device for prestress tensioning jack | |
CN203905308U (en) | Recyclable bracket used for controlling thickness of reinforced concrete floor and position of negative bending moment rib | |
CN104612059A (en) | Mass concrete block hoisting and chiseling device and method | |
CN205294593U (en) | Construction is with bearing device | |
CN202081647U (en) | Template hanging device of stair step template | |
CN203961278U (en) | Building operations roof beam structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100519 Termination date: 20130717 |