CN201474288U - Fastener of steel pipe scaffold - Google Patents

Fastener of steel pipe scaffold Download PDF

Info

Publication number
CN201474288U
CN201474288U CN2009201870232U CN200920187023U CN201474288U CN 201474288 U CN201474288 U CN 201474288U CN 2009201870232 U CN2009201870232 U CN 2009201870232U CN 200920187023 U CN200920187023 U CN 200920187023U CN 201474288 U CN201474288 U CN 201474288U
Authority
CN
China
Prior art keywords
bolt
nut
hole
steel tube
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201870232U
Other languages
Chinese (zh)
Inventor
游兴荣
苏和
王海鱼
张庆斌
徐书龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN2009201870232U priority Critical patent/CN201474288U/en
Application granted granted Critical
Publication of CN201474288U publication Critical patent/CN201474288U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a fastener of a steel pipe scaffold, which comprises a main body, a fastening piece, a bolt and a nut. A vertical sleeve used for inserting a vertical steel pipe is arranged on the main body, the lower part of the main body is connected with the first end of the fastening piece by a rotating shaft, the fastening piece presents the shape of a circular arc, and a round hole used for inserting the bolt is arranged at the upper part of the main body; a bolt hole is arranged at the second end of the fastening piece, the head part of the bolt sequentially penetrates through the round hole and the bolt hole, and the end part is clamped on the round hole; the nut is screwed at the head part of the bolt, a fastening hole is milled at the head part of the bolt, and a blocking piece which stops the nut from falling off is connected with the fastening hole in a detachable manner. The fastening hole is milled at the head part of the bolt, and the blocking piece which stops the nut from falling off is connected with the fastening hole in a detachable manner, so as to prevent the nut and the bolt from losing, thereby saving the production cost and being convenient for a scaffolder to set up the scaffold. Moreover, the fastener of the steel pipe scaffold also has the characteristics of simple structure and easy installation.

Description

A kind of steel tube scaffold clasp
Technical field
The utility model relates to a kind of steel tube scaffold clasp.
Background technology
Fastener type steel pipe scaffold is that present China uses the most general scaffold kind.The most unremarkable turnover device during this fastener is used as engineering, but playing crucial effects aspect quality, the safety in production.But same, we can not ignore fastener damage, the influence of problem to construction costs, cost such as lose.
In the prior art, as Fig. 1, steel tube scaffold clasp comprises body 1, body 1 is provided with vertical sleeve 3, this sleeve 3 is used to insert vertical steel pipe, bottom at body 1 is connected with first end of buckling piece 4 by rotating shaft 7, buckling piece 4 is a convex structure, be provided with the circular hole that is used for inserting bolt 5 on the top of body 1, second end of buckling piece 4 is provided with bolt hole, and the head of this bolt 5 passes circular hole and bolt hole successively, and the end is stuck on the circular hole, form the sleeve 2 of a level like this between buckling piece 4 and bolt 5 and body 1, this sleeve 2 is used for the steel pipe of insertion level; At the head of bolt 5 nut 6 of screwing on,, buckling piece 4 is fixedlyed connected with the horizontal steel tube that inserts by fastening nut 6.By steel tube scaffold clasp the steel pipe of level is fixed together with vertical steel pipe like this.
When the scaffolder sets up scaffold, in the process of using fastener, nut 6 is usually come off because twist excessive, and (scaffolder is when setting up scaffold, majority are being with gloves, possible feel is bad), after nut 6 came off, bolt 5 also can pass bolt hole and circular hole and come off, and whole like this fastener just loses function of use.Because nut 6 and bolt 5 come off, also need corresponding workman and go to pick up on the ground, to have wasted cost of labor, and when using next time, also needed to go for producer and remove to buy corresponding bolts 5 and nut 6, cost is just than higher, and cost of production also can improve accordingly.And generally, the scaffolder can will not have this class fastener of screw bolt and nut to lose on the ground, the fastener that is easy to lose is fallen into earth or other places that is difficult for finding, and also needs to buy whole fastener like this when using next time, and the cost of production that needs is just higher.
Summary of the invention
The utility model provides a kind of steel tube scaffold clasp, and its nut difficult drop-off can be saved cost of production.
The technical solution of the utility model is: a kind of steel tube scaffold clasp, and it comprises body, buckling piece, screw bolt and nut; Described body is provided with the sleeve that vertical steel pipe is inserted in vertical being used to, and is connected with first end of described buckling piece by rotating shaft in the bottom of described body, and this buckling piece is circular-arc, is provided with the circular hole that is used for inserting bolt in described upper part of body; Second end of described buckling piece is provided with bolt hole, and the head of described bolt passes described circular hole and bolt hole successively, and the end is stuck on the circular hole; Described nut is screwed in the head of described bolt;
Head at described bolt also is milled with button hole, and described button hole is removably connected with the block piece that stops that described nut comes off.
Steel tube scaffold clasp of the present utility model, head at described bolt is milled with button hole, this button hole is removably connected with the block piece that stops that nut comes off, so when using steel tube scaffold clasp of the present utility model, nut is after being screwed to bolt, head at nut is removably connected with block piece, can stop that nut comes off from bolt, prevent that nuts and bolt from losing, saved cost of production, also made things convenient for the scaffolder to set up scaffold, and steel tube scaffold clasp of the present utility model is simple in structure, installs easily.
Description of drawings
Fig. 1 is the structure chart of prior art steel tube scaffold clasp;
Fig. 2 is the utility model steel tube scaffold clasp structure chart in one embodiment;
Fig. 3 is the bolt lateral view in one embodiment of the utility model steel tube scaffold clasp;
Fig. 4 is the bolt lateral view in one embodiment of the utility model steel tube scaffold clasp;
Fig. 5 is the head enlarged drawing in one embodiment of the bolt of the utility model steel tube scaffold clasp;
Fig. 6 is the block piece structure chart in one embodiment of the utility model steel tube scaffold clasp.
The specific embodiment
Steel tube scaffold clasp of the present utility model, head at described bolt is milled with button hole, this button hole is removably connected with the block piece that stops that nut comes off, so when using steel tube scaffold clasp of the present utility model, nut is after being screwed to bolt, head at nut is removably connected with block piece, can stop that nut comes off from bolt, prevent that nuts and bolt from losing, saved cost of production, also made things convenient for the scaffolder to set up scaffold, and steel tube scaffold clasp of the present utility model is simple in structure, installs easily.
Below in conjunction with accompanying drawing the specific embodiment of the utility model steel tube scaffold clasp is done a detailed elaboration.
Steel tube scaffold clasp of the present utility model, as Fig. 2, it comprises body 11, buckling piece 41, bolt 51 and nut 61; Described body 11 is provided with the sleeve 31 that vertical steel pipe is inserted in vertical being used to, bottom at described body 11 is connected with first end of described buckling piece 41 by rotating shaft 71, this buckling piece 41 is circular-arc, is provided with the circular hole that is used for inserting bolt 51 on the top of described body 11; Second end of described buckling piece 41 is provided with bolt hole, and the head of described bolt 51 passes described circular hole and bolt hole successively, and the end is stuck on the circular hole; Described nut 61 is screwed in the head of described bolt 51; Between described bolt 51, described buckling piece 41 and described body 11, form the sleeve of a horizontal direction like this, this sleeve is used to insert the steel pipe of horizontal direction, when steel pipe is inserted into described sleeve the inside, by fastening nut 61, the steel pipe of fastener of the present utility model and insertion is fixedlyed connected.
As Fig. 3, Fig. 4 and shown in Figure 5, also be milled with button hole 8 at the head of described bolt 51, described button hole 8 is removably connected with the block piece 9 that stops that described nut 61 comes off.When nut 61 being screwed on described bolt 51, just can stop that by described block piece 9 described nut 61 comes off from described bolt 51 like this, prevent that nuts and bolt from losing, effectively save cost of production.
In a preferred embodiment, described block piece 9 is a steel wire, and this steel wire is wrapped on the described bolt 51, and one of described steel wire is inserted on the described button hole 8.In concrete the application, as Fig. 6, described wire shape is circular-arc, and its radius is less than the radius of described bolt head, and of steel wire is converted into curved can being inserted in the button hole.During installation, the head with steel wire is inserted in the described button hole 8 earlier, and then allows steel wire be wrapped in described bolt 51 heads.
In a preferred embodiment, described bolt 51 is shaped as T-shaped, and the end of promptly described bolt 51 is an in-line; The end of described in addition bolt 51 also can be circular or square etc., but will satisfy the diameter of the diameter of end greater than circular hole, so that the end can be stuck on the described circular hole.
In a preferred embodiment, the diameter of described button hole 8 is 2mm, and the degree of depth is 3mm.
In order to prevent that further nut 61 from coming off, can improve bolt 51 again, add the length of stay bolt 51, the long 57mm of bolt for 62mm, does not come off after being screwed to head with further assurance nut behind the 5mm that can extend usually.
In sum, steel tube scaffold clasp of the present utility model, head at described bolt is milled with button hole, this button hole is removably connected with the block piece that stops that nut comes off, so when using steel tube scaffold clasp of the present utility model, nut is after being screwed to bolt, head at nut is removably connected with block piece, can stop that nut comes off from bolt, prevent that nuts and bolt from losing, saved cost of production, also made things convenient for the scaffolder to set up scaffold, and steel tube scaffold clasp of the present utility model is simple in structure, installs easily.
Above-described the utility model embodiment does not constitute the qualification to the utility model protection domain.Any modification of within spirit of the present utility model and principle, being done, be equal to and replace and improvement etc., all should be included within the claim protection domain of the present utility model.

Claims (5)

1. steel tube scaffold clasp, it comprises body, buckling piece, screw bolt and nut; Described body is provided with the sleeve that vertical steel pipe is inserted in vertical being used to, and is connected with first end of described buckling piece by rotating shaft in the bottom of described body, and this buckling piece is circular-arc, is provided with the circular hole that is used for inserting bolt in described upper part of body; Second end of described buckling piece is provided with bolt hole, and the head of described bolt passes described circular hole and bolt hole successively, and the end is stuck on the circular hole; Described nut is screwed in the head of described bolt;
It is characterized in that: the head at described bolt also is milled with button hole, and described button hole is removably connected with the block piece that stops that described nut comes off.
2. steel tube scaffold clasp according to claim 1 is characterized in that: described block piece is a steel wire, and this steel wire is wrapped on the described bolt, and one of described steel wire is inserted on the described button hole.
3. steel tube scaffold clasp according to claim 1 and 2 is characterized in that: described bolt shape is T-shaped.
4. steel tube scaffold clasp according to claim 1 and 2 is characterized in that: the diameter of described button hole is 2mm, and the degree of depth is 3mm.
5. steel tube scaffold clasp according to claim 2 is characterized in that: described wire shape is circular-arc, and its radius is less than the radius of described bolt head.
CN2009201870232U 2009-08-18 2009-08-18 Fastener of steel pipe scaffold Expired - Fee Related CN201474288U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201870232U CN201474288U (en) 2009-08-18 2009-08-18 Fastener of steel pipe scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201870232U CN201474288U (en) 2009-08-18 2009-08-18 Fastener of steel pipe scaffold

Publications (1)

Publication Number Publication Date
CN201474288U true CN201474288U (en) 2010-05-19

Family

ID=42410534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201870232U Expired - Fee Related CN201474288U (en) 2009-08-18 2009-08-18 Fastener of steel pipe scaffold

Country Status (1)

Country Link
CN (1) CN201474288U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503506A (en) * 2017-09-07 2017-12-22 安徽卓良新材料有限公司 One discharge plate buckle scaffold rotary movable fastener
GB2570264A (en) * 2017-02-23 2019-07-24 Enhance Property Experts Ltd Fastening means and apparatus
CN114541732A (en) * 2022-01-25 2022-05-27 北京城建十六建筑工程有限责任公司 Special-shaped rotating fastener

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2570264A (en) * 2017-02-23 2019-07-24 Enhance Property Experts Ltd Fastening means and apparatus
GB2570264B (en) * 2017-02-23 2022-04-13 Enhance Property Experts Ltd Fastening means and apparatus
CN107503506A (en) * 2017-09-07 2017-12-22 安徽卓良新材料有限公司 One discharge plate buckle scaffold rotary movable fastener
CN114541732A (en) * 2022-01-25 2022-05-27 北京城建十六建筑工程有限责任公司 Special-shaped rotating fastener

Similar Documents

Publication Publication Date Title
CN201474288U (en) Fastener of steel pipe scaffold
GB2496085A (en) A bolt
CN203613817U (en) Base device for steel-structured safety protection fence
CN204441498U (en) A kind of ground connection pricker easy to plug and special plug-pull tool thereof
CN204512120U (en) Connect bearing pin
CN104538752A (en) Grounded drill rod easy to insert and pull and special inserting and pulling tool
CN204551463U (en) The anchor pole of a kind of rotatable break-in and recovery
CN204186058U (en) A kind of multipurpose wall-connecting piece
CN2813709Y (en) Anchor block
CN205533617U (en) Fastener
CN203583475U (en) Prestress tensioning device for short anchor cables
CN105443532A (en) Expansion bolt convenient to use
CN206190698U (en) Panel connecting screw
CN204725381U (en) Electric power pylon bolt fixture
CN204349332U (en) A kind of suspension clamp for electric line fastened tools with moment Presentation Function
CN201711903U (en) Quick fastening spanner for anchor bolts of iron towers
CN203213107U (en) Foot fixing drill rod device
CN204476994U (en) A kind of internal thread secondary spiral shell head radial elastic bolt
CN204174934U (en) The quick attachment fastener of a kind of round bar through walls
CN204437018U (en) A kind of bolt occlusion fixed base
CN204212416U (en) A kind of sealing up screw is to drawing fastening devices
CN204387063U (en) One carries protection hat type nut
CN2893279Y (en) Anti-unthreading screw nut
CN211923024U (en) Replaceable channel embedded sleeve
CN204112261U (en) A kind of fence fastener

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100519

Termination date: 20120818