CN201473836U - Double-working edges integral abrasion-resistant guardrail for railway switch - Google Patents

Double-working edges integral abrasion-resistant guardrail for railway switch Download PDF

Info

Publication number
CN201473836U
CN201473836U CN2009201903931U CN200920190393U CN201473836U CN 201473836 U CN201473836 U CN 201473836U CN 2009201903931 U CN2009201903931 U CN 2009201903931U CN 200920190393 U CN200920190393 U CN 200920190393U CN 201473836 U CN201473836 U CN 201473836U
Authority
CN
China
Prior art keywords
guard rail
guardrail
working edge
edge
railway switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201903931U
Other languages
Chinese (zh)
Inventor
方建平
谢伟华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009201903931U priority Critical patent/CN201473836U/en
Application granted granted Critical
Publication of CN201473836U publication Critical patent/CN201473836U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The utility model relates to a guardrail of a railway switch, and aims at providing a double-working edges integral abrasion-resistant guardrail for the railway switch. The guardrail comprises two working edges of the guardrail and a web plate which is connected with the working edges, and the cross section of the guardrail has an upper-lower symmetrical structure: the guardrail is provided with an upper working edge and a lower working edge which are respectively arranged at the same side of the web plate; and correspondingly to each work edge, the upper edge and the lower edge of the other side of the web plate are respectively provided with a flange, and the transverse sizes of the flanges are equal and fixed. The guardrail has simple manufacture technology, reasonable design and good compatibility with the existing guardrail, can be interchanged with the existing guardrail, has high intensity and good abrasion resistance, has the double-working edges, can improve the work condition of the existing guardrail, and can prolong the service life more than one time, thereby the service efficiency and the driving safety of the guardrail are improved, and a large number of steel and maintenance cost are saved to meet the requirement of energy saving and emission reducing of China.

Description

Railway switch is with duplexing working edge integral type wear-resistant guard rail
Technical field
The utility model relates to a kind of railroad track, and more particularly, the utility model relates to a kind of novel railway track switch with duplexing working edge integral type wear-resistant guard rail.
Background technology
Guard rail is the important component part of fixed railway frog track switch.It is arranged on the railway frog both sides, is the traffic direction of control wheel, prevents that wheel from impacting or climb up actual point of frog at gap in the frog, guarantees the visual plant of traffic safety.A large amount of guard rails that use are formed by the machine after bending of common rail on the railway switch at present, are not special in guard rail designs, and its case hardness is not high, and is easy to wear.Particularly behind the train speed raising, the rate of wear of guard rail is faster, directly influences the application life and the traffic safety of guard rail.Be to solve the wear problem of guard rail, domestic have the welding alloy of use steel working edge to strengthen or rail carried out method such as surface peening, but all there are all deficiencies in present employed method, is difficult to promote the use of.
China utility model patent CN200949187Y discloses a kind of railroad frog with H type guard rail steel, adopts upper and lowerly to be common rail head of rail cross section and with respect to horizontal axis and the vertical axis H type cross section of symmetry respectively.The deficiency that this guard rail exists is: because the operating principle requirement of guard rail, its working edge is a, b, c, d, five sections broken lines compositions of e (seeing accompanying drawing 3), if directly process the guard rail working edge, the web that in the middle of a, e section must be cut to, connects, this is unallowed.Process bending earlier before the working edge for this reason, and also must be flat with the fitting face processing of guard rail fagging (with reference to the accompanying drawings 1) after the bending, the same with the technology that is processed as guard rail with original common rail, the processing technology complexity.China utility model patent CN200978372Y discloses a kind of railroad frog with C type guard rail steel, has the upper and lower end face of level and perpendicularly puts working edge and with respect to horizontal center line laterally zygomorphic " C " tee section.The deficiency that this guard rail exists is: the web of " C " shape guard rail is positioned at the opposite side of guard rail working edge, it is a flat face, with the guard rail fagging is that face contacts, and the mounting means of guard rail is to use bolt to link to each other with the guard rail fagging (with reference to the accompanying drawings 1) at web middle part, the stressed working edge of guard rail on top, from force analysis, requirement guard rail top must be sturdy with the guard rail fagging, could carry out the transmission of power well, stressed rationally, this just require guard rail and guard rail fagging machining accuracy very high, otherwise may there be the gap between guard rail top and the guard rail fagging, under the impact of train wheel, fatigue failure easily, even fracture.
Therefore, provide a kind of novel guard rail that can overcome above-mentioned all kinds of deficiency, seem very necessary for improving guard rail application life and traffic safety.
Summary of the invention
The purpose of this utility model is to overcome deficiency of the prior art, provides a kind of novel railway track switch with duplexing working edge integral type wear-resistant guard rail.
Guard rail in the utility model comprises the working edge of guard rail and connects the web of working edge that the cross section of guard rail is symmetrical structure up and down: guard rail has each working edge up and down that is positioned at web the same side; Corresponding to each working edge, the lower edge is respectively equipped with flange on the web opposite side, and the lateral dimension of flange is identical and fixing.
As a kind of improvement, the lateral dimension of described working edge is to be increased gradually to the center of guard rail by two terminations.
As a kind of improvement, described guard rail is the whole rolling guard rail that forms of high-strength wear-resistant alloy steel.
As a kind of improvement, the bolt hole of some slotted hole shapes also is set on the web, be used for guard rail is installed on the guard rail fagging.
Compared with prior art, the beneficial effects of the utility model are:
Novel railway track switch is adopted milling method with duplexing working edge integral type wear-resistant guard rail, is convenient to a large amount of productions.Guard rail is a symmetrical structure up and down, thereby has two working edges, on one side the turning use another side in wearing and tearing back, the life-span is than long one times of existing single working edge guard rail; There is flange at the back side of working edge, flange is the binding face of guard rail and guard rail fagging, there is gap (accompanying drawing 1) between web and the guard rail fagging, thereby guarantee fitting tightly of the working edge back side and guard rail fagging under normal circumstances, stressed reasonable, requirement on machining accuracy to guard rail and guard rail fagging is low, is convenient to processing; After guard rail is rolled into blank, only need the bolt hole of processing working edge and connection usefulness, all the other are not all processed, and reduce processing capacity; Guard rail adopts rolling the forming of high-strength wear-resistant alloy steel, compares with rail material, and the intensity height, anti-wear performance is good, and the life-span is longer.
This practical system fabrication technique is simple, reasonable in design, good with existing guard rail compatibility, can exchange, its intensity is high and anti-wear performance is good, have two working edges, can improve the condition of work of existing guard rail, the life-span prolongs more than one times, thereby improves the service efficiency and the traffic safety of guard rail, save great deal of steel and maintenance cost, meet the energy-saving and emission-reduction requirement of country.
Description of drawings
Fig. 1 is the scheme of installation of guard rail in the present embodiment;
Fig. 2 is a guard rail side structure schematic diagram;
Fig. 3 is that guard rail is at the level cross-sectionn longitudinally at web place figure;
Fig. 4 is the cross-sectional view of the K of guard rail among Fig. 3 to the end;
Fig. 5 is the cross-sectional view of the K of guard rail among Fig. 3 to A-A, D-D place;
Fig. 6 is the cross-sectional view of the K of guard rail among Fig. 3 to B-B, C-C place.
The specific embodiment
With reference to the accompanying drawings, will be described in detail the utility model below.
Railway switch in the present embodiment is whole rolling the forming of high-strength wear-resistant alloy steel with duplexing working edge integral type wear-resistant guard rail, its cross section is symmetrical structure up and down, guard rail has each working edge 1 up and down that is positioned at the same side, is connected by web 2 between the working edge 1.Corresponding to each working edge 1, the lower edge is provided with flange 3 respectively on web 2 opposite sides, the lateral dimension of flange 3 is identical and immobilize, and such design can guarantee that guard rail need not bending, also can not switch to web (referring to accompanying drawing 3) when processing guard rail working edge a, e section.Lateral dimension described here is meant the horizontal size of the outer of the outer of flange or working edge to web vertical direction center line.Such design makes that in the cross-sectional layout of whole guard rail two working edges 1 are positioned at the same side, and web 2 is partial to opposite side.At the longitudinal direction of web 2 upper edge guard rails the bolt hole of some slotted hole shapes is set, is used for guard rail and is connected with installation between the guard rail fagging 4.
The lateral dimension of the working edge of guard rail is not a fixed value, and it is (as shown in Figure 3) that is increased gradually to the center of guard rail by two terminations.In the specific implementation, the guard rail blank at first is rolled into identical maximum section configuration (B-B among Fig. 2, C-C section), then according to the designing requirement of different guard rails, adopt mach mode to process the shape and the bolt hole of the required working edge of guard rail 1, can obtain the guard rail finished product.
In the utility model, because the design of flange 3 is arranged, guard rail is resisted against on the guard rail fagging 4 with two flanges 3 when mounted, and this has just been avoided, and C type guard rail may cause firmly installing because of processing the improper web back face deformation that causes, stressed bad hidden danger takes place.Simultaneously,, guaranteed that two working edges have enough sizes of stretching out, also can not cause switching to web when processing a, e section, guaranteed the intensity of guard rail because of web is amesiality.
It is also to be noted that what more than enumerate only is specific embodiment of the utility model.Obviously, the utility model is not limited to above embodiment, and many distortion can also be arranged.All distortion that those of ordinary skill in the art can directly derive or associate from the disclosed content of the utility model all should be thought protection domain of the present utility model.

Claims (4)

1. a railway switch comprises the working edge of guard rail and the web of connection working edge with duplexing working edge integral type wear-resistant guard rail, and it is characterized in that the cross section of guard rail is symmetrical structure up and down: guard rail has each working edge up and down that is positioned at web the same side; Corresponding to each working edge, the lower edge is respectively equipped with flange on the web opposite side, and the lateral dimension of flange is identical and fixing.
2. railway switch according to claim 1 is characterized in that with duplexing working edge integral type wear-resistant guard rail, and the lateral dimension of described working edge is to be increased gradually to the center of guard rail by two terminations.
3. railway switch according to claim 1 is characterized in that with duplexing working edge integral type wear-resistant guard rail described guard rail is the whole rolling guard rail that forms of high-strength wear-resistant alloy steel.
4. railway switch according to claim 1 is characterized in that with duplexing working edge integral type wear-resistant guard rail, and the bolt hole of some slotted hole shapes also is set on the web, is used for guard rail is installed on the guard rail fagging.
CN2009201903931U 2009-08-03 2009-08-03 Double-working edges integral abrasion-resistant guardrail for railway switch Expired - Fee Related CN201473836U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201903931U CN201473836U (en) 2009-08-03 2009-08-03 Double-working edges integral abrasion-resistant guardrail for railway switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201903931U CN201473836U (en) 2009-08-03 2009-08-03 Double-working edges integral abrasion-resistant guardrail for railway switch

Publications (1)

Publication Number Publication Date
CN201473836U true CN201473836U (en) 2010-05-19

Family

ID=42410083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201903931U Expired - Fee Related CN201473836U (en) 2009-08-03 2009-08-03 Double-working edges integral abrasion-resistant guardrail for railway switch

Country Status (1)

Country Link
CN (1) CN201473836U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364295A (en) * 2020-04-13 2020-07-03 中国铁建重工集团股份有限公司 Switch structure and track system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364295A (en) * 2020-04-13 2020-07-03 中国铁建重工集团股份有限公司 Switch structure and track system

Similar Documents

Publication Publication Date Title
CN202294848U (en) A railway track car bogie frame
CN201473836U (en) Double-working edges integral abrasion-resistant guardrail for railway switch
CN101634125A (en) Double-working edge integral type wear-resistant guardrail for railway turnout
CN2863858Y (en) 43 kg/m rail switch point point-hiding switcher
CN201030314Y (en) Crusher hammer
CN201087315Y (en) Reinforced wing rail for railway combined frog
CN203034315U (en) Groove type wear-resistant guardrail used for railway turnout
CN201525989U (en) Turnout switch
CN217601098U (en) Single-opening turnout embedded wing rail type alloy steel combined frog
CN202284266U (en) Track frog structure
CN2534221Y (en) Adjustable gauge cut-out fastening
CN201443030U (en) Hot-rolling H-shaped sleeper used for track panel of middle and low speed maglev train
CN201099817Y (en) Abrasion-proof point rail for railway railroad switch combined frog
CN112726296A (en) Split type combination frog
CN206887634U (en) Using the railroad track obtuse frog of integral type heart rail
CN202213589U (en) Bogie device
CN213447888U (en) No. 6 intersection points of 60kg/m steel rail
CN200949187Y (en) H-shaped rail-guarding steel for railway rut fork
CN217104514U (en) No. 9 single switch alloy steel rail combined frog of 60kg/m steel rail
CN201099816Y (en) Abrasion-proof guard rail for railway railroad switch
CN211498295U (en) Improved I-shaped welded type wear-resistant guard rail for railway turnout
CN217203392U (en) Railway switch frog structure
CN2332751Y (en) Austenite forged steel frog centre
CN200978372Y (en) C-type guard rail steel for railway crossing
CN220767564U (en) Integral wing rail for movable point rail frog

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Zhejiang Bell Communication Group Co., Ltd.

Assignor: Fang Jianping

Contract record no.: 2011330000955

Denomination of utility model: Double-working edge integral type wear-resistant guardrail for railway turnout

Granted publication date: 20100519

License type: Exclusive License

Record date: 20110714

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100519

Termination date: 20120803