CN201454412U - Calcium-spurting desulfurization equipment of circulating fluidized bed boiler - Google Patents

Calcium-spurting desulfurization equipment of circulating fluidized bed boiler Download PDF

Info

Publication number
CN201454412U
CN201454412U CN2009201000291U CN200920100029U CN201454412U CN 201454412 U CN201454412 U CN 201454412U CN 2009201000291 U CN2009201000291 U CN 2009201000291U CN 200920100029 U CN200920100029 U CN 200920100029U CN 201454412 U CN201454412 U CN 201454412U
Authority
CN
China
Prior art keywords
desulfurization
calcium
connects
spurting
fluidized bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201000291U
Other languages
Chinese (zh)
Inventor
钟祚群
于德亭
王玉忠
赵学斌
徐复成
徐丽丹
郭洪涛
关心
张冬梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Electric Engineering Co., Ltd.
Harbin Power System Engineering and Research Institute Co., Ltd. of CNEEC
Original Assignee
Harbin Power System Engineering & Research Institute Co Ltdof Cneec
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Power System Engineering & Research Institute Co Ltdof Cneec filed Critical Harbin Power System Engineering & Research Institute Co Ltdof Cneec
Priority to CN2009201000291U priority Critical patent/CN201454412U/en
Application granted granted Critical
Publication of CN201454412U publication Critical patent/CN201454412U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model discloses calcium-spurting desulfurization equipment of a circulating fluidized bed boiler. In a majority of traditional circulating fluidized bed boilers, a desulfurizing agent is simply mixed with coal directly, and the dry desulfurization measure in such a way has low calcium utilization ratio and low desulfuration efficiency due to poor continuity, large desulfurization agent particle size, uneven mixing and the like, therefore, requirements of atmosphere pollutant emission regulations on boilers and fossil-fired power plants are difficult to meet. The calcium-spurting desulfurization equipment comprises a cabin body (7); the lower part of the cabin body is connected with a power-driven airlock feeder (10); the lower part of the power-driven airlock feeder (10) is connected with a controllable rotating feeding valve (11); the lower part of the controllable rotating feeding valve (11) is connected with an ejector (12) which is connected with a high-voltage conveying fan (1) and a distributor (13); the front part of the distributor (13) is connected with a ejecting pipe (14) which is connected with a boiler hearth (16), and the tail part of the boiler furnace is provided with a steam feeding back device (15). The utility model is used for a calcium-spurting desulfurization system inside the circulating fluidized bed boiler.

Description

CFBB calcium injection and desulfurization equipment
Technical field:
The utility model relates to a kind of CFBB calcium injection and desulfurization equipment.
Background technology:
CFBB is with its superior environmental protection characteristic, fuel tolerance and good operation characteristic, and is widely used in power system and the central heating system.Most of CFBB directly mixes desulfurizing agent and coal simply, this dry desulfurization measure because operation poor continuity, desulfurizing agent granularity big, mix unequal, calcium utilization and desulfuration efficiency are very low, are difficult to satisfy the requirement of boiler and thermal power plant's Air Pollutant Emission rules.
Summary of the invention:
The purpose of this utility model be for CFBB provides a cover can safe and stable operation, desulfuration in furnace agent mixed characteristic is good, have than high desulfurization efficiency, conserve water resource, and the dry method in-furnace calcium spraying desulfurization that the initial stage drops into and operation and maintenance cost is lower equipment.
Above-mentioned purpose realizes by following technical scheme:
CFBB calcium injection and desulfurization equipment, its composition comprises: warehouse, described warehouse bottom connects electronic flapper, described electronic flapper bottom connects controlled rotatory feeder valve, described controlled rotatory feeder valve bottom connects injector, and described injector connects high-pressure delivery blower fan and distributor, the anterior playpipe that connects of described distributor, described playpipe connects boiler furnace, and described boiler furnace afterbody is provided with the steam feeding back device.
Described CFBB calcium injection and desulfurization equipment, described warehouse comprises feed pipe, deduster, the pressure limiting valve at top, the cone of described warehouse side lower part comprises and is attached to its outside gasification board and heater, described heater rear portion connects the gasification blower fan, and desulfurizing agent is equipped with in described warehouse inside.
The beneficial effects of the utility model:
1. the utility model is little than the wet desulphurization device floor space, and disposable input cost is low, and than other dry desulfurization device desulfuration efficiency height, desulfurization degree can reach more than 90% when the utility model normally moved.Can realize desulfurizing agent based on fuel sulfur content Synchronization Control, when guaranteeing desulfuration efficiency, save desulfurizing agent to greatest extent.
2. the steam feeding back device is as the means that further improve desulfuration efficiency, stoppage in transit does not influence the operation of whole desulfurization equipment separately, can be according to country to boiler and thermal power plant's atmosphere pollutants emission standards requirement, the input and the stoppage in transit of control steam feeding back device, the too high business economic benefit that influences of disposable input can be avoided, the desulphurization system operating cost can be further reduced again.
3. the utility model is applicable to all kinds CFBB, and desulfurizing agent uses the back to generate desulfurization product and discharges out of the furnace with the big slag of boiler, is the raw material of industry of other industries, can directly utilize, and does not cause secondary pollution, has higher promotion and use value.
Description of drawings:
Accompanying drawing 1 is the structural representation of this product.
The specific embodiment:
Embodiment 1:
CFBB calcium injection and desulfurization equipment, its composition comprises: warehouse 7, described warehouse bottom connects electronic flapper 10, described electronic flapper bottom connects controlled rotatory feeder valve 11, described controlled rotatory feeder valve bottom connects injector 12, and described injector connects high-pressure delivery blower fan 1 and distributor 13, the anterior playpipe 14 that connects of described distributor, described playpipe connects boiler furnace 16, and described boiler furnace afterbody is provided with steam feeding back device 15.
Embodiment 2:
Above-mentioned CFBB calcium injection and desulfurization equipment, described warehouse comprises feed pipe 4, deduster 5, the pressure limiting valve 6 at top, described warehouse side lower part cone is provided with gasification board 9, described gasification board rear portion is provided with heater 3, described heater rear portion is provided with gasification blower fan 2, and there is desulfurizing agent 8 described warehouse inside.Described desulfurizing agent is the spherical or lime stone powder in irregular shape by certain grain size distribution.The used steam of described steam feeding back device is the steam turbine exhaust steam.
Before the work, by feed pipe 4 warehouse 7 is filled with desulfurizing agent 8, start by sequence gasification blower fan 2 and heater 3, during work, start conveying fan 1 earlier, start electronic flapper 10 then, controlled rotatory feeder valve 11, mix with carrying wind at injector 12 places, after distributor 13 distributes, spray into burner hearth by playpipe 14, in stove, evenly mix with diffusion after, the sulfur dioxide that generates with coal combustion fully contacts the generation chemical reaction, generates solid-state desulfurization product and discharges out of the furnace, thereby realize the desulfurization purpose, and desulfurizing agent is in cyclic process, can pass through steam feeding back device 15, improve the activity of desulfurizing agent 8, and further improve system's desulfuration efficiency and sorbent utilization.The continuous free of discontinuities of sweetening process only consumes a small amount of steam turbine exhaust steam, non-secondary pollution, no industrial wastewater discharge when steam feeding back device 15 comes into operation.

Claims (2)

1. a CFBB calcium injection and desulfurization is equipped, its composition comprises: warehouse, it is characterized in that: described warehouse bottom connects electronic flapper, described electronic flapper bottom connects controlled rotatory feeder valve, described controlled rotatory feeder valve bottom connects injector, and described injector connects high-pressure delivery blower fan and distributor, the anterior playpipe that connects of described distributor, described playpipe connects boiler furnace, and described boiler furnace afterbody is provided with the steam feeding back device.
2. CFBB calcium injection and desulfurization equipment according to claim 1, it is characterized in that: described warehouse comprises feed pipe, deduster, the pressure limiting valve at top, the cone of described warehouse side lower part comprises and is attached to its outside gasification board and heater, described heater rear portion connects the gasification blower fan, and desulfurizing agent is equipped with in described warehouse inside.
CN2009201000291U 2009-06-04 2009-06-04 Calcium-spurting desulfurization equipment of circulating fluidized bed boiler Expired - Lifetime CN201454412U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201000291U CN201454412U (en) 2009-06-04 2009-06-04 Calcium-spurting desulfurization equipment of circulating fluidized bed boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201000291U CN201454412U (en) 2009-06-04 2009-06-04 Calcium-spurting desulfurization equipment of circulating fluidized bed boiler

Publications (1)

Publication Number Publication Date
CN201454412U true CN201454412U (en) 2010-05-12

Family

ID=42381756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201000291U Expired - Lifetime CN201454412U (en) 2009-06-04 2009-06-04 Calcium-spurting desulfurization equipment of circulating fluidized bed boiler

Country Status (1)

Country Link
CN (1) CN201454412U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102716661A (en) * 2012-07-10 2012-10-10 中电投远达环保工程有限公司 Conveyor dry powder direct-feeding desulphurization system
CN102716662A (en) * 2012-07-10 2012-10-10 中电投远达环保工程有限公司 Dry powder pneumatic-conveying and direct-feeding desulphurization system
CN103830995A (en) * 2013-12-19 2014-06-04 枣庄矿业(集团)付村矸石热电有限公司 Dry desulfurization spray nozzle
CN106196023A (en) * 2016-07-25 2016-12-07 泉州恒兴能源节能技术有限公司 A kind of cleaning burning coal CFBB

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102716661A (en) * 2012-07-10 2012-10-10 中电投远达环保工程有限公司 Conveyor dry powder direct-feeding desulphurization system
CN102716662A (en) * 2012-07-10 2012-10-10 中电投远达环保工程有限公司 Dry powder pneumatic-conveying and direct-feeding desulphurization system
CN103830995A (en) * 2013-12-19 2014-06-04 枣庄矿业(集团)付村矸石热电有限公司 Dry desulfurization spray nozzle
CN106196023A (en) * 2016-07-25 2016-12-07 泉州恒兴能源节能技术有限公司 A kind of cleaning burning coal CFBB
CN106196023B (en) * 2016-07-25 2018-01-02 泉州恒兴能源节能技术有限公司 One kind cleaning burning coal CFBB

Similar Documents

Publication Publication Date Title
CN107213771A (en) The biomass direct-fired device that flue gas recirculation and SNCR are combined
CN201454412U (en) Calcium-spurting desulfurization equipment of circulating fluidized bed boiler
CN104214767B (en) A kind of method and device of biomass reduction coal-burned industrial boiler flue gas nitrogen oxide
CN102658026A (en) Denitration system capable of jetting biomass coke
CN106178907A (en) A kind of CFBB ultra-fine desulfurizer granule sulfur method
CN210662829U (en) Low-emission combined desulfurization system of circulating fluidized bed boiler
CN103706246B (en) Flue gas circulating fluidized bed combined desulfurization mercury removal device and method
CN107252624A (en) The semi-dry desulphurization system and technique of a kind of utilization flyash
CN111140865A (en) Composite reduction type low NOx emission device suitable for power station boiler
CN203790827U (en) Economic efficient desulfurizer for CFB (Circulating fluid bed) boiler
CN105987381B (en) A kind of method of the coal-fired calcium sulfur ratio balance desulphurization denitration of CFB boiler optimization
CN1327939C (en) High-efficient catalyzing smoke desulfurizing and denitrifying method and apparatus thereof
CN205340518U (en) Flue gas denitration device that low -nitrogen combustion and SNCR combined together
CN203309891U (en) Desulfurization system of circulating fluidized bed boiler
CN201493051U (en) Flue gas desulfurization and return device for circulating fluidized bed
CN209076420U (en) A kind of MPR equipment for denitrifying flue gas
CN113559692A (en) Double-tower double-circulation semi-dry desulfurization device, process and application
CN113280353A (en) Sludge treatment and coal-fired NOx emission reduction integrated device and method
CN202590616U (en) System for performing desulphurization combustion in thermal power plant by using calcium carbide slurry and coal slurry
CN202725022U (en) Flue gas desulfurization returning device of circulating fluidized bed
CN201969493U (en) Quick-lime-slaking and contaminant-absorbing device for waste-burning flue gas purifying system
CN201801463U (en) Device for preparing lime slurry
CN203370457U (en) Combined desulphurization and demercuration device of flue gas circulating fluidized bed
CN101732957A (en) Desulphurization system of circulating fluidized bed boiler
CN2579508Y (en) Bottom feeding circulation spray bed smoke desulfurizing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA NATIONAL ELECTRIC EQUIPMENT CORPORATION

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yu Deting

Inventor after: Zhong Zuoqun

Inventor after: Xu Fucheng

Inventor after: Guo Hongtao

Inventor after: Wang Yuzhong

Inventor after: Xu Lidan

Inventor after: Zhao Xuebin

Inventor after: Guan Xin

Inventor before: Zhong Zuoqun

Inventor before: Yu Deting

Inventor before: Wang Yuzhong

Inventor before: Zhao Xuebin

Inventor before: Xu Fucheng

Inventor before: Xu Lidan

Inventor before: Guo Hongtao

Inventor before: Guan Xin

Inventor before: Zhang Dongmei

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHONG ZUOQUN YU DETING WANG YUZHONG ZHAO XUEBIN XU FUCHENG XU LIDAN GUO HONGTAO GUAN XIN ZHANG DONGMEI TO: YU DETING ZHONG ZUOQUN XU FUCHENG GUO HONGTAO WANG YUZHONG XU LIDAN ZHAO XUEBIN GUAN XIN

TR01 Transfer of patent right

Effective date of registration: 20100927

Address after: 150000 No. 1 CXS street, Xiangfang District, Heilongjiang, Harbin

Co-patentee after: China National Electric Equipment Corp

Patentee after: Harbin Power System Engineering & Research Institute Co., Ltd.of CNEEC

Address before: 150000 No. 1 CXS street, Xiangfang District, Heilongjiang, Harbin

Patentee before: Harbin Power System Engineering & Research Institute Co., Ltd.of CNEEC

ASS Succession or assignment of patent right

Owner name: CHINA NATIONAL ELECTRIC ENGINEERING CO., LTD.

Free format text: FORMER OWNER: CHINA NATIONAL ELECTRIC EQUIPMENT CORPORATION

Effective date: 20120904

Owner name: HARBIN POWER SYSTEM ENGINEERING + RESEARCH INSTITU

Free format text: FORMER OWNER: HARBIN POWER SYSTEM ENGINEERING AND RESEARCH INSTITUTE

Effective date: 20120904

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120904

Address after: 150000 No. 1 CXS street, Xiangfang District, Heilongjiang, Harbin

Patentee after: Harbin Power System Engineering and Research Institute Co., Ltd. of CNEEC

Patentee after: China National Electric Engineering Co., Ltd.

Address before: 150000 No. 1 CXS street, Xiangfang District, Heilongjiang, Harbin

Patentee before: Harbin Power System Engineering & Research Institute Co., Ltd.of CNEEC

Patentee before: China National Electric Equipment Corp

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100512