CN201412173Y - Grouting device for anchor rod hole - Google Patents

Grouting device for anchor rod hole Download PDF

Info

Publication number
CN201412173Y
CN201412173Y CN2009201093385U CN200920109338U CN201412173Y CN 201412173 Y CN201412173 Y CN 201412173Y CN 2009201093385 U CN2009201093385 U CN 2009201093385U CN 200920109338 U CN200920109338 U CN 200920109338U CN 201412173 Y CN201412173 Y CN 201412173Y
Authority
CN
China
Prior art keywords
pipe
bolthole
grouting
mentioned
grouting pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201093385U
Other languages
Chinese (zh)
Inventor
刘冬至
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huaye Group Co Ltd
Original Assignee
MCC Huaye Resources Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Huaye Resources Development Co Ltd filed Critical MCC Huaye Resources Development Co Ltd
Priority to CN2009201093385U priority Critical patent/CN201412173Y/en
Application granted granted Critical
Publication of CN201412173Y publication Critical patent/CN201412173Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a grouting device for an anchor rod hole, which comprises a grouting pipe, an auxiliary pipe and a pore plug, wherein the pore plug takes a truncated cone shape, is provided with two through holes, a small-diameter part and a big-diameter part; the grouting pipe and the auxiliary pipe are respectively inserted into the two through holes of the pore plug for fixation; one end of the grouting pipe is positioned in the position slightly higher than the small-diameter part of the pore plug, and the other end of the grouting pipe is connected with a slurry delivery pipethrough a grouting pipe gate valve; and one end of the auxiliary pipe is positioned in the position higher than one end of the grouting pipe, and the other end of the auxiliary pipe is respectively connected with a water supply pipe and an exhaust port through a water supply valve and a water and air discharging valve. According to the grouting device for the anchor rod hole, the full mortar pouring can be realized in the anchor rod hole by using the auxiliary pipe.

Description

The bolthole grouting device
Technical field
The utility model relates to a kind of bolthole grouting device, by utilizing auxiliary tube, realizes that in bolthole full mortar injects.
Background technology
Current, in the construction of mine, construction work etc., be extensive use of the anchor pole technique for fixing, side slope, tunnel, dam body etc. are carried out active reinforce.Anchor pole is as the tensional element that gos deep into the stratum, and its end is connected with engineering structure, and the other end gos deep in the stratum fixing, thus the stabilization works structure.
Anchor pole is divided into prestressed anchor, self-feeding anchor pile, slip casting formula anchor pole etc. usually.Wherein, the exemplary configuration of slip casting formula anchor pole is shown in Fig. 1, and anchor pole 100 comprises anchor head 1, anchor bar body 2, stop grouting plug 3, backing plate 4 and nut 5.Wherein, on anchor head 1, be provided with hangnail, in the hole that anchor pole can be positioned to bore, and guarantee that the body of rod is well placed in the middle; Anchor bar body 2 is most important parts in the anchor pole 100, is made of screw-thread steel usually, plays a major role in anchoring and supporting; Stop grouting plug 3 is used for keeping grouting pressure in the slip casting process, makes slurries fully be filled into the country rock slit; Backing plate 4 is used to bear bigger surrouding rock stress; Nut 5 backing plate 4 that is used to be tightened makes surrouding rock stress focus on this backing plate 4.
Fig. 2 shows the existing bolthole grouting device that is used for injecting to the bolthole of slip casting formula anchor pole mortar.As shown in the drawing, the bolthole grouting device has the Grouting Pipe 201 of diameter less than bolthole 10, one end of Grouting Pipe 201 is inserted in the bolthole 10, the other end of Grouting Pipe 201 is connecting the feed pipe for mortar 202 of carrying mortar by Grouting Pipe gate valve 203, the end away from Grouting Pipe 201 at feed pipe for mortar 202 is connecting slip casting jar 204 and airduct 205, slip casting jar 204 is used for providing the mortar that injects usefulness to Grouting Pipe 202, and airduct 205 is used to provide the wind-force that transports mortar.When slip casting, one end of Grouting Pipe 201 is deep into bolthole 10 interior positions apart from hole end 50-100mm, open slip casting gate valve 203, air-supply by airduct 205 is injected into mortar in the bolthole 10, and,, slowly and evenly Grouting Pipe 201 is extracted from bolthole 10 along with the injection of mortar, after filling with, Grouting Pipe 201 is extracted fully from the anchor pole aperture.
But, using aforesaid existing bolthole grouting device, in the upwards bolthole in engineerings such as inclined shaft, ramp, footrill, gallery, chamber during slip casting, it is full to guarantee that sometimes mortar in the bolthole injects, and can cause the constant intensity deficiency of anchor pole; And whether qualified inspection utilizes the selective examination of anchor pole drawing meter to carry out to anchor pole, belongs to a kind of check afterwards.
Therefore, press for and a kind ofly just can guarantee that in work progress the slip casting in the bolthole is full, the very high technology of qualification rate when anchor pole is checked and accepted.
The utility model content
The utility model is to make in order to solve above-mentioned problems of the prior art, and its purpose is to provide a kind of bolthole grouting device, by auxiliary tube is set, can guarantee that the slip casting in the anchor pole is full.
To achieve these goals, the bolthole grouting device that the utility model relates to comprises Grouting Pipe, auxiliary tube, stopple, and above-mentioned stopple has truncated conical shape and offers 2 through holes, and this stopple has minor diameter and large-diameter portion; Above-mentioned Grouting Pipe and auxiliary tube insert in 2 through holes of above-mentioned stopple fixing respectively; One end of above-mentioned Grouting Pipe is positioned at the position higher slightly than the minor diameter of above-mentioned stopple, and the other end connects with feed pipe for mortar by the Grouting Pipe gate valve; One end of above-mentioned auxiliary tube is positioned at the position higher than an end of above-mentioned Grouting Pipe, and the other end of above-mentioned auxiliary tube connects with feed pipe and outlet opening respectively by the feed water valve and the vent valve that discharges water.
In addition, preferably be connected with airduct at the end away from stopple of above-mentioned Grouting Pipe.
In addition, preferred above-mentioned auxiliary tube is steel pipe or pvc pipe.
According to such scheme, owing to be provided with auxiliary tube separately, not only can carry out preceding cleaning of slip casting of bolthole, can also carry out mortar injection from bottom to top by the water and air in this auxiliary tube discharge bolthole.And, when occurring returning slurry, show that the mortar injection in the bolthole is full, therefore, can realize reliable and full slip casting.
Description of drawings
Fig. 1 is the schematic diagram of the exemplary configuration of the common slip casting formula anchor pole of expression.
Fig. 2 is the schematic diagram of the existing bolthole grouting device of expression.
Fig. 3 is the schematic diagram of the bolthole grouting device that relates to of expression the utility model.
The specific embodiment
Below, with reference to the accompanying drawing that can implement specific implementations of the present utility model, describe the utility model in detail.At this, understand these embodiments described later in detail, make those of ordinary skills can implement the utility model fully.The same embodiment of given shape, structure and characteristic in this record is associated, but under the prerequisite that does not break away from technological thought of the present utility model and category thereof, can show as another embodiment.In addition, the position or the configuration of the indivedual inscapes in each embodiment disclosed herein can be understood as under the prerequisite that does not break away from technological thought of the present utility model and category thereof and can change.Therefore, detailed description described later is not to be used to limit the utility model, and protection domain of the present utility model is by the technical scheme of claims record and the technical scheme decision that is equal to it.
Fig. 3 is the schematic diagram that expression is used in bolthole injecting the bolthole grouting device that the utility model of mortar relates to.As shown in the drawing, the bolthole grouting device that the utility model relates to have diameter less than bolthole 10 so that insert Grouting Pipe 301 in the bolthole 10, one end of Grouting Pipe 301 is inserted in the bolthole 10, the other end of Grouting Pipe 301 is connecting the feed pipe for mortar 302 of carrying mortar by Grouting Pipe gate valve 303, the end away from Grouting Pipe 301 at feed pipe for mortar 302 is connecting slip casting jar 304 and airduct 305, slip casting jar 304 is used for providing the mortar that injects usefulness to Grouting Pipe 301, and airduct 305 is used to provide the wind-force that transports mortar.
In addition, this bolthole grouting device also comprises the have certain-length stopple 307 of truncated conical shape of (for example 50mm), the diameter of the smaller diameter end of this stopple 307 is slightly less than the diameter of bolthole 10, for example than the little 4mm of diameter of bolthole, the slightly larger in diameter of the larger diameter end of this stopple 307 is in the diameter of bolthole 10, for example, like this, utilize this stopple 307 can in the slip casting process, stop up bolthole 10 than the big 4mm of injected hole diameter of anchor pole.Offer 2 through holes on this stopple 307, the diameter of one of them through hole is equivalent to the external diameter of Grouting Pipe 301, and Grouting Pipe 301 is therefrom passed, and another through hole is used to pass auxiliary tube 306.The diameter of this auxiliary tube 306 is less than the diameter of bolthole 10, and it can be steel pipe, pvc pipe etc., and it has the length of the Kongzui inboard that is enough to be deep into bolthole 10.One end of this auxiliary tube 306 passes after the through hole of above-mentioned stopple 301, is inserted in the bolthole 10, and is deep near the bolthole end, for example apart from the position of the inboard 50mm of the Kongzui of bolthole 10.Grouting Pipe 301 and auxiliary tube 306 pass above-mentioned stopple 307, and fixedly connected with this stopple 307 by dismountable mode.
In addition, the other end at this auxiliary tube 306 is connecting the feed pipe 311 and the gas vent 309 that discharges water, between the above-mentioned other end of this auxiliary tube 306 and feed pipe 311, be provided with the feed water valve 310 that control is supplied water, control the blow off valve 308 that discharges water and exit with discharging water to be provided with between the gas vent 309 at the above-mentioned other end of this auxiliary tube 306.When opening feed water valve 310, when closing blow off valve 308 simultaneously, supplying water in bolthole 10 by auxiliary tube 306, can require to clean the inside of bolthole 10 thus according to construction reference from feed pipe 311.When closing feed water valve 310, when opening blow off valve 308 simultaneously, can discharging the water and air in the bolthole 10.
Below, utilize aforesaid bolthole grouting device to realize the step of full bolthole mortar depositing construction in conjunction with Fig. 3 explanation.
At first, based on the length dimension and the diameter of anchor pole, for example getting out corresponding bolthole 10 in the lithosphere.
Secondly, with reference to the degree of depth of bolthole 10, Grouting Pipe 301 and auxiliary tube 306 are passed two through holes being located on the stopple 307.Grout outlet one end that makes Grouting Pipe 301 is 307 nearer from stopple, for example apart from the position of 30mm, make auxiliary tube 306 can be deep near position bolthole 10 the most inboard, for example apart from the position of the most inboard 50-100mm of bolthole 10.Afterwards, Grouting Pipe 301 and auxiliary tube 306 are fixed on the stopple 307, and are inserted in the bolthole 10, block bolthole 10 by stopple 307 simultaneously.
Then, under the state of closing its valve 309 that discharges water, open feed water valve 310 and supply water to auxiliary tube 306, water can flow in the bolthole 10, and bolthole 10 is cleaned.Clean after the end, close feed water valve 310, open the vent valve that discharges water, open Grouting Pipe gate valve 303 then and carry out the mortar injection.When carrying out slip casting, mortar injects bolthole 10 from the Grouting Pipe 301 that is positioned at lower, and progressively rises, so the water and air in the bolthole 10 is squeezed and rising synchronously, finally flow in the auxiliary tube 306, is discharged from from outlet opening 308.At last, when occurring returning slurry, show that mortar is injected in the bolthole 10 fully, slip casting is full, so close Grouting Pipe gate valve 303, finishes the slip casting operation.
Finish from bolthole 10, slowly and evenly to extract Grouting Pipe 301 and auxiliary tube 306 after the slip casting, and then slowly and evenly insert predetermined anchor pole, can finish the construction of total length adhesion type anchor pole.The grouting device of extracting can continue on for the slip casting operation of next bolthole.
By using aforesaid bolthole grouting device, owing to be provided with auxiliary tube separately, not only can carry out preceding cleaning of slip casting of bolthole, can also carry out mortar injection from bottom to top by the water and air in this auxiliary tube discharge bolthole.And, when occurring returning slurry, show that the mortar injection in the bolthole is full, therefore, can realize reliable and full slip casting.
In addition, because the diameter of auxiliary tube less than bolt diameter, can guarantee that also the mortar in the bolthole is full after inserting anchor pole.So just can guarantee that the mortar injection in the bolthole is full, can when grouting rock bolt is checked and accepted, obtain very high qualification rate, make because of identifying that afterwards the defective processing of carrying out of doing over again becomes the quality of prior control grouting rock bolt.
" embodiment " spoken of in this manual, " another embodiment ", " embodiment ", etc., refer to concrete feature, structure or the characteristics described in conjunction with this embodiment and be included at least one embodiment that the application's generality describes.Occurring this statement in manual Anywhere is not to establish a capital to refer to this same embodiment.Further, when describing a concrete feature, structure or characteristics in conjunction with arbitrary embodiment, what advocate is to realize this feature, structure or characteristics in conjunction with other embodiments, drops in those skilled in the art's the scope.
Although the utility model is described with reference to a plurality of explanatory embodiments of the present utility model, but, should be appreciated that, those skilled in the art can design a lot of other modification and embodiments, and these are revised and embodiment will drop within the disclosed principle scope and spirit of the application.More particularly, in the scope of, accompanying drawing open and claim, can carry out multiple modification and improvement to the building block and/or the layout of subject combination layout in the application.Except modification that building block and/or layout are carried out with improving, to those skilled in the art, other purposes also will be tangible.

Claims (3)

1. a bolthole grouting device is characterized in that, comprises Grouting Pipe, auxiliary tube, stopple,
Above-mentioned stopple has truncated conical shape and offers 2 through holes, and this stopple has minor diameter and large-diameter portion;
Above-mentioned Grouting Pipe and auxiliary tube insert in 2 through holes of above-mentioned stopple fixing respectively;
One end of above-mentioned Grouting Pipe is positioned at the position higher slightly than the minor diameter of above-mentioned stopple, and the other end connects with feed pipe for mortar by the Grouting Pipe gate valve;
One end of above-mentioned auxiliary tube is positioned at the position higher than an end of above-mentioned Grouting Pipe, and the other end of above-mentioned auxiliary tube connects with feed pipe and outlet opening respectively by the feed water valve and the vent valve that discharges water.
2. bolthole grouting device as claimed in claim 1 is characterized in that,
The end away from stopple in above-mentioned Grouting Pipe is connected with airduct.
3. bolthole grouting device as claimed in claim 1 is characterized in that,
Above-mentioned auxiliary tube is steel pipe or pvc pipe.
CN2009201093385U 2009-06-25 2009-06-25 Grouting device for anchor rod hole Expired - Lifetime CN201412173Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201093385U CN201412173Y (en) 2009-06-25 2009-06-25 Grouting device for anchor rod hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201093385U CN201412173Y (en) 2009-06-25 2009-06-25 Grouting device for anchor rod hole

Publications (1)

Publication Number Publication Date
CN201412173Y true CN201412173Y (en) 2010-02-24

Family

ID=41714059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201093385U Expired - Lifetime CN201412173Y (en) 2009-06-25 2009-06-25 Grouting device for anchor rod hole

Country Status (1)

Country Link
CN (1) CN201412173Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182480A (en) * 2011-05-04 2011-09-14 中铁三局集团有限公司 Mortar anchor constructing method
CN104632260A (en) * 2015-03-19 2015-05-20 中国长江三峡集团公司 High-compactness anchor rod grouting method
CN109706935A (en) * 2019-01-18 2019-05-03 山东建勘集团有限公司 Anchor hole grouting for water blocking device and its working method in a kind of artesian water stratum
CN111677550A (en) * 2020-06-18 2020-09-18 陕西延长石油巴拉素煤业有限公司 Water prevention and control protection method for safe tunneling of rock roadway through water-rich coal seam section

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182480A (en) * 2011-05-04 2011-09-14 中铁三局集团有限公司 Mortar anchor constructing method
CN102182480B (en) * 2011-05-04 2013-03-13 中铁三局集团有限公司 Mortar anchor constructing method
CN104632260A (en) * 2015-03-19 2015-05-20 中国长江三峡集团公司 High-compactness anchor rod grouting method
CN109706935A (en) * 2019-01-18 2019-05-03 山东建勘集团有限公司 Anchor hole grouting for water blocking device and its working method in a kind of artesian water stratum
CN109706935B (en) * 2019-01-18 2023-10-17 山东建勘集团有限公司 Anchor hole grouting water plugging device in pressure-bearing water stratum and working method thereof
CN111677550A (en) * 2020-06-18 2020-09-18 陕西延长石油巴拉素煤业有限公司 Water prevention and control protection method for safe tunneling of rock roadway through water-rich coal seam section

Similar Documents

Publication Publication Date Title
CN201412173Y (en) Grouting device for anchor rod hole
CN108252726B (en) Device for preventing tunnel secondary lining vault from emptying and construction method thereof
CN102561992A (en) Deformation water stopper and grouting plugging process adopting same
CN203756203U (en) Self-drilling type full-thread bolt grouting anchor rod
CN104747216B (en) Ultra-soft cracked coal and rock mass drill and grouting integrated fractional grouting method
CN104948133B (en) The slip casting plugging device and its technique of a kind of suitable high-pressure high-flow drilling water burst
CN210917345U (en) Grouting bag type enlarged end anchor rod
CN203271766U (en) Grouting pipe and grouting device of pipe shed advanced support
CN103470212B (en) Active drilling and hole sealing device and method
CN107288671A (en) Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note and its construction method
CN104653827A (en) Grout sealing device
CN112012749A (en) Tunnel advanced grouting small conduit and construction method
CN208441096U (en) Soil nailing port closing device
CN107165410B (en) Construction formwork for slope concrete and construction method thereof
CN201448488U (en) Back valve and steel tube equipped with the same
CN206928526U (en) A kind of half grout sleeve of bar connecting
CN110453672B (en) Loose shallow earth covering double-liquid grouting reinforcement method
CN201068747Y (en) Hollow grouting anchoring-bolt
CN203834969U (en) Reinforced concrete anti-seep high-pressure grouting device
CN102606178B (en) Special sprayer for long anchor cable support in underground mine and rapid support method
CN203584445U (en) Staged controllable anchor rod grouting support surrounding rock consolidation integrated system
CN105909286B (en) A kind of bolt-grouting support method for inhibiting principle based on cracking
CN210395862U (en) Grouting sleeve with detection pipe
CN204004445U (en) Anti-plugging coal slurry laying-off valve
CN201433781Y (en) High strength grouting anchorage bar

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA HUAYE GROUP COMPANY LIMITED

Free format text: FORMER OWNER: MCC HUAYE RESOURCES DEVELOPMENT CO., LTD.

Effective date: 20101208

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100176 TOWER B2, NO.1, KANGDING STREET, BEIJING ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE, BEIJING TO: 100176 TOWER B2, NO.1, KANGDING STREET, ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20101208

Address after: 100176 block B2, 1 Kangding street, Beijing economic and Technological Development Zone

Patentee after: China Huaye Technology and Industry Group Co., Ltd.

Address before: 100176, No. 1, Kangding street, Beijing economic and Technological Development Zone, Beijing, B2

Patentee before: MCC Huaye Resources Development Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20100224

CX01 Expiry of patent term