CN201411704Y - Reinforced concrete foundation or pile cap - Google Patents

Reinforced concrete foundation or pile cap Download PDF

Info

Publication number
CN201411704Y
CN201411704Y CN2009200329530U CN200920032953U CN201411704Y CN 201411704 Y CN201411704 Y CN 201411704Y CN 2009200329530 U CN2009200329530 U CN 2009200329530U CN 200920032953 U CN200920032953 U CN 200920032953U CN 201411704 Y CN201411704 Y CN 201411704Y
Authority
CN
China
Prior art keywords
reinforced concrete
foundation
pile
pile cap
concrete foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009200329530U
Other languages
Chinese (zh)
Inventor
石波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NORTHWEST HYDRO CONSULTING ENGINEERS CHECC
PowerChina Northwest Engineering Corp Ltd
Original Assignee
NORTHWEST HYDRO CONSULTING ENGINEERS CHECC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NORTHWEST HYDRO CONSULTING ENGINEERS CHECC filed Critical NORTHWEST HYDRO CONSULTING ENGINEERS CHECC
Priority to CN2009200329530U priority Critical patent/CN201411704Y/en
Application granted granted Critical
Publication of CN201411704Y publication Critical patent/CN201411704Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The utility model relates to the field of high-rise buildings, in particular to a reinforced concrete foundation or pile cap, which adopts a prestressed structure in the vertical direction and comprises an upper structure and a natural foundation or pile foundation. The utility model is characterized in that prestressed reinforcement (2) is inlaid in the reinforced concrete foundation (1) or reinforced concrete pile cap (5) connected with the lower end of the upper structure (4). The utility model has the advantages that the force applied on the foundation or the pile cap is more reasonable, and the crack resistance and the stability of the foundation or the pile cap are better.

Description

Reinforced concrete foundation or pile cap
Technical field
The utility model relates to high-rise structures structure field, particularly a kind of reinforced concrete foundation or pile cap.
Background technology
In recent years, the wind power tower basis that China is newly-built, be generally two kinds of forms of direct foundation and pile foundation, but also have following subject matter: 1, basis or pile cap bear bigger vertical tension, and basis or pile cap adopt more plain bars for this power of opposing is general; 2, to calculate the crack under tension bigger because basis or pile cap bear bigger vertical tension.How solving above these contradictions, reach the problem that overcomes above-mentioned existence, do not influence speed of application again simultaneously, is problem to be solved in the utility model.
Summary of the invention
The purpose of this utility model provides a kind of novel foundation or pile cap, and when not influencing speed of application, the deficiency that overcomes the known technology existence makes tangible more reinforced concrete foundation of economic benefit or pile cap adopt prestressing force in vertical direction.
The technical solution of the utility model is, design a kind of reinforced concrete foundation or pile cap, it comprises superstructure and direct foundation or pile foundation, it is characterized in that: be inlaid with prestressed reinforcement in basis or the reinforced concrete pile caps on the reinforced concrete that connects under superstructure.
Described reinforced concrete foundation is a hollow structure from round platform, and the even vertical distribution of prestressed reinforcement is on the interior cylinder of hollow structure.
Pile cap top is the cylindrical structural of hollow on the described reinforced concrete, and the cylindrical bottom of hollow is an enclosed planar, is connected with several stakes under enclosed planar; The even vertical distribution of prestressed reinforcement is in the interior cylinder of hollow.
This structure adopts prestressed reinforcement to replace plain bars, and the intensity of prestressed reinforcement is 3~5 times of plain bars, and steel using amount reduces relatively, in addition the corresponding minimizing of crack developing width or do not produce the crack.
Characteristics of the present utility model are: the crack for fear of reinforced concrete foundation or pile cap occurs too early, make full use of high strength cast iron and strong concrete, manage before concrete structure or member bear service load, concrete to the tensile region imposes compressive pre-stress in advance, concrete compressive stress vanishing stress or very little tensile stress when work, far away little and conventional way reinforced concrete foundation or pile cap.
The utility model adopts compressive pre-stress to reduce or offsets the caused concrete pulling stress of load, thereby the tensile stress of structural element is controlled at more among a small circle, even be in pressured state, with the appearance of postponing distress in concrete with carry out, thereby improve the cracking resistance and the rigidity of member.
Characteristics of the present utility model are: do not need reserving hole channel, also needn't grouting, easy construction, fast, cost is lower, be easy to apply.
Its advantage is: 1, crack resistance is good, and rigidity is big.Because member is applied prestressing force, postponed the appearance in crack greatly, under the service load effect, the crack can not appear in member, or makes the crack postpone appearance, so improved the rigidity of member, has increased durability of structures.
2, save material, reduce deadweight.Therefore its structure can reduce amount of reinforcement and member section size owing to must adopt high-strength material, saves steel and concrete, reduces dead load, and large span and heavy load structure are had obvious superiority.
3, improve the shear resistance of member.Test shows that the longitudinal prestressing reinforcing bar plays a part crab-bolt, the appearance that hampers the member diagonal crack with carry out.
4, improve Stability of Compressional Member.When the compressed member slenderness ratio is big, just be bent easily behind the fixed pressure being subjected to, so that forfeiture is stable and destroy.If reinforced concrete post is applied prestressing force, it is very tight that the longitudinal stress reinforced bar stretching is got, and not only prestressed reinforcement itself is not easy to bend, and the concrete around can helping improves the ability that opposing is bent.
5, improve the fatigue performance of member.Because have powerful prestressed reinforcing bar, less relatively because of loading or the caused STRESS VARIATION amplitude of off-load in operational phase, so can improve fatigue resistance, this is very favourable to the structure of bearing dynamic load.
Reinforced concrete foundation or pile cap adopt prestressing force in vertical direction, make full use of the characteristic of prestressed reinforcement, and basis or pile cap increased basis or pile cap cracking resistance and anti-inclining property not increasing steel using amount or reduce under the situation of steel using amount, makes that simultaneously the stability of superstructure is better.
Description of drawings
Below in conjunction with the embodiment accompanying drawing the utility model is described further.
Fig. 1 is that the prestressing force floor map is adopted in vertical direction in embodiment 1 direct foundation;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is that embodiment 2 pile foundations adopt the prestressing force floor map in vertical direction;
Fig. 4 is the B-B sectional view of Fig. 3.
Among the figure: 1, reinforced concrete foundation; 2, prestressed reinforcement; 3, ground; 4, superstructure; 5, reinforced concrete pile caps; 6, stake.
The specific embodiment
Embodiment 1 structure as shown in Figure 1 and Figure 2, it is the prestressed structure schematic diagram that reinforced concrete foundation 1 adopts in vertical direction, it comprises superstructure 4 and reinforced concrete foundation 1, is inlaid with prestressed reinforcement 2 in the reinforced concrete foundation 1 that superstructure connects for 4 times.Reinforced concrete foundation 1 upper end is the round platform hollow structure, and prestressed reinforcement 2 even vertical distribution are on the interior cylinder of hollow structure.Embodiment 2 structures as shown in Figure 3, Figure 4, it is the prestressed structure schematic diagram that reinforced concrete pile caps 5 adopts in vertical direction, it comprises superstructure 4 and reinforced concrete pile caps 5, is inlaid with prestressed reinforcement 2 in the reinforced concrete pile caps 5 that superstructure connects for 4 times.Reinforced concrete pile caps 5 is the cylindrical structural of hollow, and the cylindrical bottom of hollow is an enclosed planar, is connected with several stakes 6 under enclosed planar; Prestressed reinforcement 2 even vertical distribution are on the interior cylinder of hollow.Press the basis of construction shown in the figure in use, reinforced concrete foundation 1 or reinforced concrete pile caps 5 are different with conventional basis or pile cap in stressed vertical forces, owing in reinforced concrete foundation 1 that connects for 4 times in superstructure or reinforced concrete pile caps 5, be inlaid with prestressed reinforcement 2, so that the basic stress of tall and slender structure is more reasonable, its crack resistance is good, and rigidity is big.The shear resistance of member improves, Stability of Compressional Member fatigue performance higher, member is better.

Claims (3)

1, reinforced concrete foundation or pile cap, it comprises superstructure and direct foundation, bottom or pile foundation, it is characterized in that: be inlaid with prestressed reinforcement (2) in reinforced concrete spread foundation (1) that connects under superstructure (4) or the reinforced concrete pile caps (5).
2, according to described reinforced concrete foundation of claim 1 or pile cap, it is characterized in that: described reinforced concrete foundation (1) round platform upper end is hollow structure, and the even vertical distribution of prestressed reinforcement (2) is on the interior cylinder of hollow structure.
3, according to described reinforced concrete foundation of claim 1 or pile cap, it is characterized in that: described reinforced concrete pile caps (5) is the cylindrical structural of hollow, and the cylindrical bottom of hollow is an enclosed planar, is connected with several stakes (6) under enclosed planar; The even vertical distribution of prestressed reinforcement (2) is on the interior cylinder of hollow.
CN2009200329530U 2009-05-06 2009-05-06 Reinforced concrete foundation or pile cap Expired - Lifetime CN201411704Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200329530U CN201411704Y (en) 2009-05-06 2009-05-06 Reinforced concrete foundation or pile cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200329530U CN201411704Y (en) 2009-05-06 2009-05-06 Reinforced concrete foundation or pile cap

Publications (1)

Publication Number Publication Date
CN201411704Y true CN201411704Y (en) 2010-02-24

Family

ID=41713591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200329530U Expired - Lifetime CN201411704Y (en) 2009-05-06 2009-05-06 Reinforced concrete foundation or pile cap

Country Status (1)

Country Link
CN (1) CN201411704Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104975622A (en) * 2015-07-18 2015-10-14 兰州理工大学 Correction and reinforcement method for precast pile foundation of high-rise building
CN104988944A (en) * 2015-07-17 2015-10-21 中国能源建设集团云南省电力设计院有限公司 Prestressed anchor bolt type annular draught fan foundation
CN106120838A (en) * 2016-06-30 2016-11-16 河北省电力勘测设计研究院 A kind of basic constructional design method of the gravity type spread foundation of vertical shaft fan

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104988944A (en) * 2015-07-17 2015-10-21 中国能源建设集团云南省电力设计院有限公司 Prestressed anchor bolt type annular draught fan foundation
CN104975622A (en) * 2015-07-18 2015-10-14 兰州理工大学 Correction and reinforcement method for precast pile foundation of high-rise building
CN104975622B (en) * 2015-07-18 2017-01-11 兰州理工大学 Correction and reinforcement method for precast pile foundation of high-rise building
CN106120838A (en) * 2016-06-30 2016-11-16 河北省电力勘测设计研究院 A kind of basic constructional design method of the gravity type spread foundation of vertical shaft fan

Similar Documents

Publication Publication Date Title
CN101550703B (en) Method for designing reinforced concrete foundation or pile cap
CN101761089B (en) Fiber reinforced concrete uplift pile
CN207553438U (en) Tension prestress concrete composite beam altogether
CN2782763Y (en) Pretensioned type steel strand prestressed concrete pipe pile
CN201254768Y (en) Net bamboo reinforcement rammed earth wall
CN102345291A (en) Partially prestressed supporting cantilever pile
CN201265157Y (en) Post-tensioned unbounded prestressed concrete anti-floating pile
CN201411704Y (en) Reinforced concrete foundation or pile cap
CN102363957B (en) A kind of post-tensioned prestressing composite uplift pile
CN202323717U (en) Cantilever type pre-stress hoop and special tensioning device thereof
CN103485287A (en) Prestressed application method in concrete frame box culvert construction
CN201358468Y (en) Grillage-type bearing platform wind power generation tower pile foundation
CN201459717U (en) Prestressed concrete polygonal solid or hollow pile
CN202936804U (en) Prestressed pile based on post-tensioning method
CN2701914Y (en) Concrete prefabricated and assembled multipurpose tower crane foundation
CN203569597U (en) Counterforce traction device for single-pile static load test
CN203741830U (en) Concrete comprehensive acting pile
CN204940273U (en) A kind of Prestressed anchor rope with pressure dispersing construction equipment
CN201679001U (en) Fiber reinforced concrete uplift pile
CN212223643U (en) Single-column pier tension-compression combined anti-overturning structure
CN201794215U (en) Pretensioning method prestress reinforced concrete prefabricated beam
CN202416303U (en) End plate of prestressed concrete hollow square pile
CN203639900U (en) Hollow pile
CN209353332U (en) A kind of novel glass fiber reinforced plastic uplift pile
CN203531003U (en) Assembly type tower crane base of tower crane with capacity below 80 tons

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HYDROCHINA XIBEI ENGINEERING CORPORATION

Free format text: FORMER NAME: NORTHWEST HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER ENGINEERING CONSULTING

Owner name: CHINA ELECTRIC POWER CONSTRUCTION GROUP NORTHWEST

Free format text: FORMER NAME: HYDROCHINA XIBEI ENGINEERING CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18

Patentee after: POWERCHINA NORTHWEST ENGINEERING Co.,Ltd.

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18

Patentee before: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC

CP03 Change of name, title or address

Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18

Patentee after: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 general survey and Design Institute of the Northwest Office

Patentee before: Northwest Hydro Consulting Engineers, CHECC

CX01 Expiry of patent term

Granted publication date: 20100224

CX01 Expiry of patent term