CN201406269Y - Three-unit crane lifting T-shaped sling - Google Patents

Three-unit crane lifting T-shaped sling Download PDF

Info

Publication number
CN201406269Y
CN201406269Y CN2009200856755U CN200920085675U CN201406269Y CN 201406269 Y CN201406269 Y CN 201406269Y CN 2009200856755 U CN2009200856755 U CN 2009200856755U CN 200920085675 U CN200920085675 U CN 200920085675U CN 201406269 Y CN201406269 Y CN 201406269Y
Authority
CN
China
Prior art keywords
girder
hanger
main beam
lift
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200856755U
Other languages
Chinese (zh)
Inventor
杨佳华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN2009200856755U priority Critical patent/CN201406269Y/en
Application granted granted Critical
Publication of CN201406269Y publication Critical patent/CN201406269Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a sling, in particular to a three-unit crane lifting T-shaped sling which comprises a first main beam, a second main beam and a lifting eye, wherein the first main beam and the second main beam are connected in included angle, a first main beam lifting eye is arranged at one side of the first main beam far from the second main frame, and two ends of the second main beam are both equipped with a second main beam lifting eye. The three-unit crane lifting T-shaped sling can be cooperated with a fluid pressure hydraulic crane and a plant inner bridge type hoister for operation, thereby being able to reduce the requirements for field beans in plants and filling up the defect that the hoisting can not be carried out because large-scale hoisting equipment can not be erected in the plants, the structure of the whole device is simple and practical, and the assembly is convenient.

Description

Three machines lift T shape suspender
Technical field
The utility model relates to a kind of suspender, relates in particular to a kind of hydraulic pressure that is suitable for and hangs and cooperate three machines that crane in bridge type is installed and used in the factory building to lift T shape suspender.
Background technology
Usually use large lifting equipment that overweight equipment is installed, but not enough or important actor is more or be subjected to other site condition restriction when running into factory building height, in factory building, use large lifting equipment just unrealistic.For this reason, use the interior crane in bridge type of the less factory building of hoisting capacity to replace large lifting equipment usually, when needs increase the lifting ability, also can use two hydraulic pressure to hang and cooperate the interior crane in bridge type of factory building to lift together, this lifting mode generally needs special hanger.
Summary of the invention
The purpose of this utility model provides a kind of three machines simple and practical, that cooperate crane in bridge type and hydraulic pressure to lift overweight equipment and lifts T shape suspender.
In order to achieve the above object, the utility model is taked following technical scheme: three machines lift T shape suspender, its difference is: it includes first girder, second girder, hanger, first girder is angle with second girder and is connected, first girder is provided with the first girder hanger away from a side of second girder, and the second girder two ends are provided with the second girder hanger.
Described first girder is connected with the second girder axis normal, and the head end of first girder is connected on the middle part of second girder.
Described first girder and the second girder junction are provided with girder reinforcement by connection device, and girder reinforcement by connection device is the inverted U shape, and breach is stuck on second girder, and the both sides of girder reinforcement by connection device are connected with second girder.
Described first girder, second girder are the H-girder both sides and add steel plate formation frame girder construction.
Described first girder, the equal spacing reinforcement by connection of second girder plate.
The described first girder hanger is the template hanger, and hanger is provided with through hole, and first girder penetrates through hole and is connected with hanger, and connects the hanger reinforced plate in the junction, and the hanger reinforced plate connects the both ends of the surface up and down of first girder and the two sides of hanger.
The beneficial effect that the utility model possesses: hang with hydraulic pressure, crane in bridge type coordinating operation in the factory building, can reduce requirement, remedy the defective that can't lift because of the large lifting equipment of can't standing in the factory building to place in the factory building; Whole apparatus structure is simple and practical, easy for installation.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the birds-eye view of the utility model embodiment;
Fig. 3 be among the utility model embodiment first girder at the structural representation of hanger reinforced plate junction;
Fig. 4 is the second girder cross sectional drawing among the utility model embodiment;
Fig. 5 is the second girder Lifting Lug Structure scheme drawing among the utility model embodiment;
Among the figure: 1-first girder, 2-first girder is reinforced transverse slat, the 3-first girder hanger, 4-hanger reinforced plate, 5-second girder, 6-girder reinforcement by connection device, 7-second girder is reinforced transverse slat, the 8-second girder hanger, 9-first girder is reinforced side plate, and 10-second girder is reinforced side plate.
The specific embodiment
In order to understand the utility model better, below in conjunction with embodiment and accompanying drawing the technical solution of the utility model is described further, referring to Fig. 1 to Fig. 5:
Three machines of implementing by the utility model lift T shape suspender, include first girder 1, second girder 5, the first girder hanger 3, the second girder hanger 8, first girder 1 is angle with second girder 5 and is connected, in the present embodiment, first girder 1 and second girder, 5 axis normal are connected to form T type shape, and the head end of first girder 1 is connected on the middle part of second girder 5.More firm for the connection between girder, be provided with girder reinforcement by connection device 6 in the junction, girder reinforcement by connection device 6 is the inverted U shape, and breach is stuck on second girder 5, and the both sides of girder reinforcement by connection device 6 are connected with second girder 5.First girder 1 is provided with the first girder hanger, 3, the second girders, 5 two ends away from a side of second girder 5 and is provided with the second girder hanger 8.The first girder hanger 3 is the template hanger, and hanger is provided with through hole, and first girder 1 penetrates through hole and is connected with hanger 3, and connects hanger reinforced plate 4 in the junction, and hanger reinforced plate 4 connects the both ends of the surface up and down of first girder 1 and the two sides of hanger 3.First girder 1, second girder 5 are H-girder and spacing reinforcement by connection plates all.Reinforced plate is divided into to be reinforced transverse slat and reinforces side plate, first girder is reinforced transverse slat 2, first girder is reinforced side plate 9 and is connected on the sidewall of first girder, 1 cross-sectional plane and first girder 1, second girder is reinforced transverse slat 7, second girder is reinforced side plate 10 and is connected on the sidewall of second girder, 5 cross-sectional planes and second girder 5, enough bears bigger moment of flexure and shearing when reinforced plate can guarantee main cable and girder.
Use of the present utility model is: first kind of scheme is that the first girder hanger, 3 sides are penetrated device interior neutral to be lifted, crane in bridge type penetrates the first girder hanger 3 with suspension hook in the factory building, and other two hydraulic cranes use steel rope and snap ring to connect the second girder hanger 8 respectively and get final product.Second kind of scheme is to place three machines to lift under the T shape suspender equipment to be lifted, crane in bridge type penetrates the first girder hanger 3 with suspension hook in the factory building, other two hydraulic cranes use steel rope and snap ring to connect the second girder hanger 8 respectively, use steel rope to pass through first girder, 1 fixing equipment to be lifted in addition and get final product.
Above disclosed only is preferred embodiment of the present utility model, can not limit the interest field of the utility model certainly with this, and therefore the equivalence of being done according to the utility model claim changes, and still belongs to protection domain of the present utility model.

Claims (6)

1, a kind of three machines lift T shape suspender, it is characterized in that: it includes first girder, second girder, hanger, first girder is angle with second girder and is connected, and first girder is provided with the first girder hanger away from a side of second girder, and the second girder two ends are provided with the second girder hanger.
2, three machines according to claim 1 lift T shape suspender, it is characterized in that: described first girder is connected with the second girder axis normal, and the head end of first girder is connected on the middle part of second girder.
3, three machines according to claim 1 lift T shape suspender, it is characterized in that: described first girder and the second girder junction are provided with girder reinforcement by connection device, girder reinforcement by connection device is the inverted U shape, breach is stuck on second girder, and the both sides of girder reinforcement by connection device are connected with second girder.
4, three machines according to claim 1 lift T shape suspender, it is characterized in that: described first girder, second girder are the H-girder both sides and add steel plate formation frame girder construction.
5, three machines according to claim 4 lift T shape suspender, it is characterized in that: described first girder, the equal spacing reinforcement by connection of second girder plate.
6, lift T shape suspender according to claim 1 or 4 described three machines, it is characterized in that; The described first girder hanger is the template hanger, and hanger is provided with through hole, and first girder penetrates through hole and is connected with hanger, and connects the hanger reinforced plate in the junction, and the hanger reinforced plate connects the both ends of the surface up and down of first girder and the two sides of hanger.
CN2009200856755U 2009-05-12 2009-05-12 Three-unit crane lifting T-shaped sling Expired - Fee Related CN201406269Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200856755U CN201406269Y (en) 2009-05-12 2009-05-12 Three-unit crane lifting T-shaped sling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200856755U CN201406269Y (en) 2009-05-12 2009-05-12 Three-unit crane lifting T-shaped sling

Publications (1)

Publication Number Publication Date
CN201406269Y true CN201406269Y (en) 2010-02-17

Family

ID=41677200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200856755U Expired - Fee Related CN201406269Y (en) 2009-05-12 2009-05-12 Three-unit crane lifting T-shaped sling

Country Status (1)

Country Link
CN (1) CN201406269Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101927962A (en) * 2010-09-27 2010-12-29 中国葛洲坝集团机械船舶有限公司 Method for hoisting large-sized workpiece with double gantry cranes and lifting appliance
CN102491162A (en) * 2011-11-24 2012-06-13 北京金风科创风电设备有限公司 Hoisting equipment and hoisting method
CN103204427A (en) * 2013-03-18 2013-07-17 上海三一精机有限公司 Device for whole lifting of small machine tool
CN104692260A (en) * 2013-12-09 2015-06-10 烟台中集来福士海洋工程有限公司 Portal crane

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101927962A (en) * 2010-09-27 2010-12-29 中国葛洲坝集团机械船舶有限公司 Method for hoisting large-sized workpiece with double gantry cranes and lifting appliance
CN102491162A (en) * 2011-11-24 2012-06-13 北京金风科创风电设备有限公司 Hoisting equipment and hoisting method
CN102491162B (en) * 2011-11-24 2014-05-07 北京金风科创风电设备有限公司 Hoisting equipment and hoisting method
CN103204427A (en) * 2013-03-18 2013-07-17 上海三一精机有限公司 Device for whole lifting of small machine tool
CN104692260A (en) * 2013-12-09 2015-06-10 烟台中集来福士海洋工程有限公司 Portal crane

Similar Documents

Publication Publication Date Title
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN101537976B (en) Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN202465025U (en) Sling special for prefabricated panel
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN201406269Y (en) Three-unit crane lifting T-shaped sling
CN101549836A (en) Method for hoisting ultra-high overweight equipment in closed workshop and special sling
CN100567129C (en) A kind of hoisting device for loop wheel machine
CN202658590U (en) Integral assembled drilling platform
CN202030434U (en) Large-span whole-section hoisting sling for steel box girder
CN201176365Y (en) Light-duty adjustable hanger
CN209260578U (en) Longitudinal temporary connecting structure of suspension bridge concrete stiffening girder installation
CN201809032U (en) Self-adjusting stay device with combinable hanger
CN201132941Y (en) Self floating lower carrying pole beam of moveable formwork
CN205662256U (en) High rises pergola side and hangs a semi -portal bridge crane
CN201756401U (en) Snap for lifting
CN103738852A (en) Weight testing device of crane
CN201649667U (en) Reinforcement cage immersion guide frame
CN105317031B (en) A kind of ship lift main equipment room bridge main beam hanging method
CN204778268U (en) A special lifting device for hoist and mount of large -tonnage precast box girder
CN103058083B (en) Bolt sphere truss gig
CN202358822U (en) Hoisting structure for oil field skid block
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN105060124A (en) Intra-frame portal crane system and hoisting use method thereof
CN205243147U (en) Hoist that uses during special high -tension transmission iron tower of helicopter assemblage
CN205023729U (en) Gallows frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA FIRST METALLURGICAL CONSTRUCTION GROUP CORPO

Free format text: FORMER NAME: CHINA FIRST METALLURGICAL CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee after: China First Metallurgical Group Co., Ltd.

Address before: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee before: China First Metallurgical Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100217

Termination date: 20170512

CF01 Termination of patent right due to non-payment of annual fee