CN201395944Y - Split water-stop wall-through bolt - Google Patents

Split water-stop wall-through bolt Download PDF

Info

Publication number
CN201395944Y
CN201395944Y CN2009201025015U CN200920102501U CN201395944Y CN 201395944 Y CN201395944 Y CN 201395944Y CN 2009201025015 U CN2009201025015 U CN 2009201025015U CN 200920102501 U CN200920102501 U CN 200920102501U CN 201395944 Y CN201395944 Y CN 201395944Y
Authority
CN
China
Prior art keywords
screw rod
bolt
utility
model
periphery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201025015U
Other languages
Chinese (zh)
Inventor
郭群录
张振国
李占武
赵新田
尹虹哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction Group Corp Ltd
Original Assignee
Hebei Construction Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Construction Group Corp Ltd filed Critical Hebei Construction Group Corp Ltd
Priority to CN2009201025015U priority Critical patent/CN201395944Y/en
Application granted granted Critical
Publication of CN201395944Y publication Critical patent/CN201395944Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a split water-stop wall-through bolt, wherein the structure thereof includes a screw rod and fixing nuts at two ends, a water-stop piece and a position-limiting piece are welded in the middle section of the screw rod, and a columnar rubber filling block is connected to the screw rod at the external end of the position-limiting piece. Due to the adoption of the utility model, a cavity which has the same size and shape as the rubber filling block is formed at the periphery of the screw rod after the concrete pouring is completed, a templates is removed, and the rubberfilling block is taken off, so that the screw rod cutting and removing tool cam extend into the cavity to cut and remove the screw rod. Therefore, the procedures of removing concretes on the periphery of the screw rod are saved; and since the reserved holes on the concrete surface have the same size, the subsequent technique of processing the concrete surface is simplified, and the whole viewingeffect after the repair is improved.

Description

A kind of to drawing the sealing through-wall bolt
Technical field
The utility model relates to a kind of building engineering construction apparatus, and is specifically a kind of to drawing the sealing through-wall bolt.
Background technology
In the existing mine dam body construction, need be by to drawing the sealing bolt to come the template of fastening concreting.At present, be made up of the set bolt at screw rod and two ends drawing the sealing through-wall bolt, screw rod partly is made up of the screw portion through walls at middle part and the standing screw at two ends, is welded with sealing sheet and banking stop at screw portion through walls.Build finish after, the template of dismantling, again with the standing screw at two ends part from the root excision, only with threaded shank fractionation through walls in body of wall.Excision is during standing screw, needs earlier just that the concrete of screw rod periphery removes, and carries out the screw rod excision again, uses the mortar of removing stone with the label concrete to carry out concrete surface at last and handles.It is not only time-consuming that follow-up needs cut concrete process, and the repairing quality index is low, influences whole impression effect.
The utility model content
It is a kind of to drawing the sealing through-wall bolt, with screw rod excision and the concrete surface renovation technique behind the simplification stripping that the purpose of this utility model will provide exactly.
The utility model is achieved in that this comprises the hold-down nut at screw rod and two ends to drawing the sealing through-wall bolt, is welded with sealing sheet and banking stop in the screw rod stage casing, and cross-under has the column rubber cushion blocks on the screw rod of banking stop outer end.
The utility model adopts this structure, installs template outside rubber cushion blocks, and the outer pad of template is gone up the lumps of wood and steel pipe, and by the hold-down nut that screws two ends template is compressed, and carries out pouring construction.After concreting finished, stripping took off rubber cushion blocks and promptly forms and the rubber cushion blocks equal and opposite in direction at the periphery of screw rod, and the hole of shape unanimity so can stretch into the screw rod resecting tool this hole easily and carry out screw rod excision operation.Like this, the concrete that has not only saved the screw rod periphery removes operation, and because concrete surface preformed hole size is consistent, also makes the concrete surface treatment process of postorder simplify, and the whole impression effect after the reparation also is improved.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further.
Shown in Figure 1, this comprises the hold-down nut 8 at screw rod 3 and two ends to drawing the sealing through-wall bolt, is shaped on screw thread at the screw rod two ends.Be welded with sealing sheet 4 and two banking stops 2 in the stage casing of screw rod, cross-under has rubber cushion blocks 1 on the screw rod of banking stop 2 outer ends.Rubber cushion blocks 1 can be cylindric, prism-shaped or suitable shape such as round table-like.
When the utility model uses, install template 5 in rubber cushion blocks 1 outside, the outer pad of template is gone up the lumps of wood 6 and steel pipe 7, and the hold-down nut 8 that screws two ends again compresses template 5, carries out pouring construction.

Claims (1)

1, a kind of to drawing the sealing through-wall bolt, comprise the hold-down nut (8) at screw rod (3) and two ends being welded with sealing sheet (4) and banking stop (2) in the screw rod stage casing, it is characterized in that cross-under has rubber cushion blocks (1) on the screw rod of banking stop (2) outer end.
CN2009201025015U 2009-04-27 2009-04-27 Split water-stop wall-through bolt Expired - Fee Related CN201395944Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201025015U CN201395944Y (en) 2009-04-27 2009-04-27 Split water-stop wall-through bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201025015U CN201395944Y (en) 2009-04-27 2009-04-27 Split water-stop wall-through bolt

Publications (1)

Publication Number Publication Date
CN201395944Y true CN201395944Y (en) 2010-02-03

Family

ID=41618450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201025015U Expired - Fee Related CN201395944Y (en) 2009-04-27 2009-04-27 Split water-stop wall-through bolt

Country Status (1)

Country Link
CN (1) CN201395944Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938863A (en) * 2014-04-01 2014-07-23 中国建筑第六工程局有限公司 Processing method of formwork tie
CN105464369A (en) * 2015-12-31 2016-04-06 浙江省送变电工程公司 Concrete formwork supporting device with waterproof structure and using method thereof
CN105888244A (en) * 2015-01-25 2016-08-24 通州建总集团有限公司 Energy-saving sectional type water stop split screw rod device
CN108086678A (en) * 2017-11-30 2018-05-29 中国二十冶集团有限公司 Split bolt end portion treating method
CN108149926A (en) * 2017-11-28 2018-06-12 孔金河 Split bolt component and its application in water conservancy formwork for placing system
CN108166756A (en) * 2017-11-28 2018-06-15 孔金河 FRP tendons pulling plug component and its application in concrete-pouring template system
CN108589986A (en) * 2018-07-02 2018-09-28 西安建筑科技大学 One kind being based on bolted assembled composite wall structure and its construction method
CN110195513A (en) * 2019-06-25 2019-09-03 中铁一局集团第四工程有限公司 Water-stopping pull rod and waterproof construction method in subway work

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938863A (en) * 2014-04-01 2014-07-23 中国建筑第六工程局有限公司 Processing method of formwork tie
CN105888244A (en) * 2015-01-25 2016-08-24 通州建总集团有限公司 Energy-saving sectional type water stop split screw rod device
CN105464369A (en) * 2015-12-31 2016-04-06 浙江省送变电工程公司 Concrete formwork supporting device with waterproof structure and using method thereof
CN108149926A (en) * 2017-11-28 2018-06-12 孔金河 Split bolt component and its application in water conservancy formwork for placing system
CN108166756A (en) * 2017-11-28 2018-06-15 孔金河 FRP tendons pulling plug component and its application in concrete-pouring template system
CN108086678A (en) * 2017-11-30 2018-05-29 中国二十冶集团有限公司 Split bolt end portion treating method
CN108589986A (en) * 2018-07-02 2018-09-28 西安建筑科技大学 One kind being based on bolted assembled composite wall structure and its construction method
CN108589986B (en) * 2018-07-02 2023-04-25 西安建筑科技大学 Assembled composite wall structure based on bolt connection and construction method thereof
CN110195513A (en) * 2019-06-25 2019-09-03 中铁一局集团第四工程有限公司 Water-stopping pull rod and waterproof construction method in subway work
CN110195513B (en) * 2019-06-25 2024-05-07 中铁一局集团第四工程有限公司 Water stop pull rod in subway construction and waterproof construction method

Similar Documents

Publication Publication Date Title
CN201395944Y (en) Split water-stop wall-through bolt
CN203441100U (en) Formwork structure of constructional column
CN101832025B (en) Sealing up screw
CN204225493U (en) Construction formwork molding structure
CN102912977A (en) Mold used for pouring shaped stair
CN203305384U (en) Fixing device for hole forming in wall
CN201087553Y (en) Oppositely dragging screw for fixing concrete template
CN207268085U (en) Novel architecture through-wall bolt
CN201671338U (en) Water-stop screw rod
CN201714093U (en) Turn-around tie bolt used in construction of concrete wall form
CN104806014A (en) Novel detachable waterstop pull rod construction process
CN201512953U (en) Split-type water seal screw rod
CN204626973U (en) A kind of sealing up screw for building
CN203640284U (en) Split bolt capable of being repeatedly used
CN205062990U (en) Mould for inspection shaft
CN101240657A (en) Water stop screw rod
CN202039862U (en) Concrete curved surface shaping template
CN201162352Y (en) Water stop screw
CN201110001Y (en) Novel dismountable slide rod capable of controlling pouring thickness
CN103233580B (en) Bare concrete formwork and square timber connection structure
CN203257101U (en) Structure for connecting bare concrete formwork and square timber
CN204450352U (en) The special reinforcing spanner of split bolt
CN204899034U (en) Prefabricated wall post
CN204960328U (en) Movement joint is with supplementary form removal device
CN103615109B (en) A kind of Screw arbor with nut at both-ends

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100203

Termination date: 20180427