CN201375996Y - Hoisting chain dislocation adjuster in steel pipe rolling production line - Google Patents

Hoisting chain dislocation adjuster in steel pipe rolling production line Download PDF

Info

Publication number
CN201375996Y
CN201375996Y CN200920067541U CN200920067541U CN201375996Y CN 201375996 Y CN201375996 Y CN 201375996Y CN 200920067541 U CN200920067541 U CN 200920067541U CN 200920067541 U CN200920067541 U CN 200920067541U CN 201375996 Y CN201375996 Y CN 201375996Y
Authority
CN
China
Prior art keywords
adjuster
dislocation
chain
filling block
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920067541U
Other languages
Chinese (zh)
Inventor
吴烈
杨华
孙玮杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baosteel Equipment Maintenance Co Ltd
Original Assignee
Shanghai Baosteel Equipment Maintenance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baosteel Equipment Maintenance Co Ltd filed Critical Shanghai Baosteel Equipment Maintenance Co Ltd
Priority to CN200920067541U priority Critical patent/CN201375996Y/en
Application granted granted Critical
Publication of CN201375996Y publication Critical patent/CN201375996Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a hoisting chain dislocation adjuster in a steel pipe rolling production line, which comprises a filling block, two locking plates, a locking bolt and a locking handle, wherein one surface of the filling block is a convex circular surface, the other surface of the filling block is a circular cambered surface, the two locking plates are respectively arranged on both sides of the filling block, a screw hole is formed at the lower end in the center of one of the two locking plates, the locking bolt is screwed in the screw hole, and the locking handle is arranged at one end of the locking bolt. The hoisting chain can be rapidly adjusted after dislocation by using the adjuster, therefore, the labor intensity is reduced, the rehabilitation efficiency is improved, and the potential safety hazard during the process of restoring the hoisting chain is avoided.

Description

Steel pipe rolling production line elevator chain chain dislocation adjuster
Technical field
The utility model relates to a kind of steel pipe rolling production line elevator chain chain dislocation adjuster.
Background technology
The pipe of steel pipe's production factory steel pipe rolling production line is promoted to rolling platform by elevator chain, it is one of equipment of the crux of steel pipe rolling production line, also be the throat of steel pipe's production factory owner production line, in case the dislocation fault takes place elevator chain, whole piece rolling line subsequent production will all stop production.The operation principle of elevator chain is: rotated forward by 7 driving gears by 7 chains, pipe is risen on the traversing chain of 5.3 meters platforms, it is rolling to finish pipe through next procedure.Existing elevator chain equipment does not have automatic dislocation regulatory function, in case the chain dislocation takes place, the maintainer need show up immediately and rush to repair.Operation sequence is: the chain that will misplace earlier disconnects, and manually with crow bar adjustments that reset, after chain to be misplaced is adjusted to the right place, carries out the chain connection again.Run into this type of fault and generally rush to repair and need about 2 hours time, drop into many, time-consuming, the cooperation of also will driving a vehicle in case of necessity of repairing personnel in the repairing process, labor intensity is big, and has potential safety hazard, and remediation efficiency is low.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of steel pipe rolling production line elevator chain chain dislocation adjuster, utilize this adjuster after the elevator chain dislocation, can be adjusted fast, reduced labour intensity, improved remediation efficiency, the elevator chain process safe hidden danger of having avoided resetting.
For solving the problems of the technologies described above, the utility model steel pipe rolling production line elevator chain chain dislocation adjuster comprises filling block, two latch, clamping screw and set levers, described filling block simultaneously is the dome face, another side is an arc surface, described two latch are located at described filling block both sides respectively, lower end, a described latch center is provided with screw, and described clamping screw is twisted in described screw, and described set lever is located at described clamping screw one end.
For ease of clamping drive sprocket, this adjuster also comprises locking nut, and described locking nut is twisted on described clamping screw and is positioned at the described latch outside.
Because the utility model steel pipe rolling production line elevator chain chain dislocation adjuster has adopted technique scheme, promptly making one side is the filling block of arc surface for dome face, another side, the filling block both sides are provided with latch, can there be screw the lower end, center of a latch, is screwed into the clamping screw of an end tight handle with lock in the screw; Utilize this adjuster after the elevator chain dislocation, can be adjusted fast, reduced labour intensity, improved remediation efficiency, the elevator chain process safe hidden danger of having avoided resetting.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and embodiments:
Fig. 1 is the front view of the utility model steel pipe rolling production line elevator chain chain dislocation adjuster,
Fig. 2 is the side view of the utility model steel pipe rolling production line elevator chain chain dislocation adjuster.
The specific embodiment
As depicted in figs. 1 and 2, the utility model steel pipe rolling production line elevator chain chain dislocation adjuster comprises filling block 1, two latch 2, clamping screw 3 and set levers 4, described filling block 1 one side is a dome face 11, another side is an arc surface 12, described two latch 2 are located at described filling block 1 both sides respectively, lower end, a described latch center is provided with screw, and described clamping screw 3 is twisted in described screw, and described set lever 4 is located at described clamping screw 3 one ends.
For ease of clamping drive sprocket, this adjuster also comprises locking nut 5, and described locking nut 5 is twisted on described clamping screw 3 and is positioned at described latch 2 outsides.
It is the filling block of arc surface for dome face, another side that the utility model steel pipe rolling production line elevator chain chain dislocation adjuster is made one side, the filling block both sides are provided with latch, can there be screw the lower end, center of a latch, is screwed into the clamping screw of an end tight handle with lock in the screw; When a certain chain of elevator chain and drive sprocket dislocation plurality of teeth, the dome face of this adjuster filling block is filled in two between cog of the drive sprocket of this chain, the latch of this adjuster is fixed on the drive sprocket by clamping screw, the chain of dislocation is positioned on the arc surface of this adjuster filling block, starting the elevator chain drive sprocket this moment rotates, the chain of dislocation is filled and led up the tooth of drive sprocket owing to this adjuster, therefore do not rotate with drive sprocket, remaining chain then rotates plurality of teeth, the chain that misplaces thus is adjusted to consistent with other chains, unscrew clamping screw, pull down this adjuster, elevator chain can normally move; Utilize this adjuster after the elevator chain dislocation, can be adjusted fast, reduced labour intensity, improved remediation efficiency, the elevator chain process safe hidden danger of having avoided resetting.

Claims (2)

1, a kind of steel pipe rolling production line elevator chain chain dislocation adjuster, it is characterized in that: this adjuster comprises filling block, two latch, clamping screw and set levers, described filling block simultaneously is the dome face, another side is an arc surface, described two latch are located at described filling block both sides respectively, lower end, a described latch center is provided with screw, and described clamping screw is twisted in described screw, and described set lever is located at described clamping screw one end.
2, steel pipe rolling production line elevator chain chain dislocation adjuster according to claim 1 is characterized in that: also comprise locking nut, described locking nut is twisted on described clamping screw and is positioned at the described latch outside.
CN200920067541U 2009-02-06 2009-02-06 Hoisting chain dislocation adjuster in steel pipe rolling production line Expired - Fee Related CN201375996Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920067541U CN201375996Y (en) 2009-02-06 2009-02-06 Hoisting chain dislocation adjuster in steel pipe rolling production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920067541U CN201375996Y (en) 2009-02-06 2009-02-06 Hoisting chain dislocation adjuster in steel pipe rolling production line

Publications (1)

Publication Number Publication Date
CN201375996Y true CN201375996Y (en) 2010-01-06

Family

ID=41516090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920067541U Expired - Fee Related CN201375996Y (en) 2009-02-06 2009-02-06 Hoisting chain dislocation adjuster in steel pipe rolling production line

Country Status (1)

Country Link
CN (1) CN201375996Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103203584A (en) * 2013-04-16 2013-07-17 江苏龙源振华海洋工程有限公司 Misaligned processing method for offshore wind plant large-diameter tower barrel flange bolt holes

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103203584A (en) * 2013-04-16 2013-07-17 江苏龙源振华海洋工程有限公司 Misaligned processing method for offshore wind plant large-diameter tower barrel flange bolt holes
CN103203584B (en) * 2013-04-16 2015-10-21 江苏龙源振华海洋工程有限公司 A kind of marine wind electric field major diameter tower drum flange bolt hole dislocation processing method

Similar Documents

Publication Publication Date Title
CN201375996Y (en) Hoisting chain dislocation adjuster in steel pipe rolling production line
CN204030433U (en) Wire operation driving
CN104264544A (en) Pre-tensioning jack for pre-tensioned track board and method for tensioning pre-stressed twisted steel of track board by use of pre-tensioning jack
CN202898570U (en) Automatic plate arranging device for electrolytic lead anode plates
CN204588443U (en) The special tool of dismounting side dump wagon side board
CN205218474U (en) Piston servomotor shifts out device
CN210710434U (en) Manhole cover lifting device
CN201924941U (en) Hoisting device for reinforced concrete pipe segment
CN205265145U (en) Slide -wire driving safeties
CN209177825U (en) Lock rope device for mine multi-rope friction type the steel wire rope tune rope operation
CN201964024U (en) Socket type pipeline withstanding device
CN205740072U (en) A kind of escalator repair and maintenance utensil
CN201455639U (en) Automatic bolting device for emergency of oil-gas well
CN204675746U (en) Conveyor chain carries chain device
CN201309732Y (en) Unhooking-proof transport hook
CN201125069Y (en) Chain ring hook component
CN205127185U (en) Anti -theft net is broken ware of tearing open fast
CN201980749U (en) Abrasion-proof belt-conveyer funnel
CN219906737U (en) Auxiliary device for lifting submersible sewage pump of bridge crane
CN203918880U (en) Action bars box socket set
CN105364465A (en) Piston type servomotor shifting-out method and shifting-out device thereof
CN218134777U (en) Chain tensioner
CN203756226U (en) Slag blocking device for ore drawing machine
CN203295072U (en) Rotary suspension arm for pole-mounted transformer
CN203958170U (en) The automatic hook taking device of inclined shaft bunching

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100106

Termination date: 20120206