CN201358576Y - Novel fast-assembled aluminium alloy scaffolding structure - Google Patents

Novel fast-assembled aluminium alloy scaffolding structure Download PDF

Info

Publication number
CN201358576Y
CN201358576Y CNU2008201571946U CN200820157194U CN201358576Y CN 201358576 Y CN201358576 Y CN 201358576Y CN U2008201571946 U CNU2008201571946 U CN U2008201571946U CN 200820157194 U CN200820157194 U CN 200820157194U CN 201358576 Y CN201358576 Y CN 201358576Y
Authority
CN
China
Prior art keywords
framework
adjustable support
shaped part
model
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201571946U
Other languages
Chinese (zh)
Inventor
李福全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008201571946U priority Critical patent/CN201358576Y/en
Application granted granted Critical
Publication of CN201358576Y publication Critical patent/CN201358576Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a novel fast-assembled aluminium alloy scaffolding structure, which belongs to the field of construction equipment, and comprises upright posts, a frame, adjustable support legs and the like. The frame cross connection is adopted, and the frame adopts prefabricated modules, during the assembly, the rotary pin-type assembling method is adopted, the worker pushes the pin forwards, makes a T-shaped part be vertical, and then inserts the T-shaped part into the slot of the upright post, rotates the Z-shaped slot of the pin by 90 degrees and knocks tightly the Y-shaped part with a hammer, therefore the whole assembling process is finished, and the disassembling process is converse. Compared with the prior art, the utility model has the advantages of safe and reliable use, convenient assembly and disassembly, simple structure, strong adaptability and the like.

Description

The structure of novel aluminum alloy fast-assembling scaffold
Technical field:
The utility model relates to a kind of structure of scaffold, refers more particularly to a kind of structure of novel aluminum alloy fast-assembling scaffold, belongs to the construction equipment field.
Background technology:
China is as the developing country of a high speed development, builing industry is just experiencing the vigorous growth stage, no matter be that vast esidential building building or public mega project are all at unprecedented upsurge in construction of experience, scaffold is as one of builing industry most important equipment, in state-owned huge demand.
Existing scaffold, the locks that screw togather of screw or threaded sleeve that adopt are fixed more, realize that the number body of rod overlaps the purpose of combination mutually, but these scaffold buildings are in the open, because of after being subjected to wind or people and making it to rock above standing in, being easy to cause screw or sleeve to move back buckles, and make between each body of rod connection loosing or get loose, directly influence constructor's personal safety, simultaneously, when assembling or dismounting scaffold, must be with instruments such as spanners with screw means or spiral shell pine, assembling or dismounting are very inconvenient during scaffold in actual use, thereby a kind of structure of novel aluminum alloy fast-assembling scaffold is arisen at the historic moment.
The utility model content:
In order to solve deficiency of the prior art, this purpose of the utility model provides a kind of structure of novel aluminum alloy fast-assembling scaffold, it have good anti-inclination performance, safe and reliable, make things convenient for advantages such as installing/dismounting, member be with low cost, reusable.
The structure of novel aluminum alloy fast-assembling scaffold, its primary structure comprises: adjustable support leg (1) can directly insert in the pipe of column (2), and regulate the height of column (2) by the nut (6) on the adjustable support leg (1), connect with framework (3) between two root posts (2), framework is divided into 1.2 meters, 1.5 rice, 1.8 rice, 2.4 rice, 3.0 different lengths such as rice, the two ends of framework (3) are provided with draw-in groove (5), framework (3) can pass through direct and column (2) clamping of draw-in groove (5), each framework (3) all is equipped with 4 latches that are rotatably connected (4), be rotatably connected have in the latch (4) one can 90 degree rotations and before and after movable T head dummy parts, when T head dummy parts are in plumbness, the head of T head dummy parts can be inserted any one of last 8 grooves of column (2), to rotate T head dummy parts then revolves and turn 90 degrees, make the head of T head dummy parts be buckled in the both sides of the groove of column (2), again the whippletree on the T head dummy parts pin is inserted, fix T head dummy parts, all is furnished with an adjustable support leg (1) under every upright (2) post, adjustable support leg (1) can be adjusted according to the concavo-convex of ground, tunes nut (7) but the length of turn screw thread (6) change adjustable support leg (1).
The purpose of this utility model is to realize by following technical scheme:
The structure of described novel aluminum alloy fast-assembling scaffold, adopt frame type laterally to connect, all frameworks adopt Prefabricated block, mounting method with the rotation bolt-type, whole scaffold need not a bolt in installation process, only need a hammer just can finish, reduce workman's installation, thereby improved efficiency of construction.
The structure of described novel aluminum alloy fast-assembling scaffold, in installation process, the workman need be with latch toward sinciput, T head dummy parts are in plumbness, then T head dummy parts are stretched in the trough of column, latch Z type groove is revolved turn 90 degrees, strike tightly with hammer, just finished whole erection this moment, on the contrary unloading process.
The structure of described novel aluminum alloy fast-assembling scaffold because this scaffold all parts after assembling process are fixed together, so in use, can be carried out integral body as required and move, and can reduce the installation that repeats of part like this, reduces work hours.
The structure of described novel aluminum alloy fast-assembling scaffold all is furnished with a threaded rod under the every pillar, this threaded rod can be adjusted according to the concavo-convex of ground, and realizes at short notice regulating.
The structure of described novel aluminum alloy fast-assembling scaffold, crossbeam adopt aluminium wood embedding structure mutually, and module is placed directly on the crossbeam, and adopt nail to fix.
Owing to adopted above technical scheme, the utlity model has following beneficial effect:
1. good anti-inclination performance, security performance height;
2. make things convenient for installing/dismounting, prevent to get rusty;
3. member is with low cost, reusable;
4. bearing capacity is big, compliance strong, economize on resources etc.
Description of drawings:
Fig. 1 is the utility model structural representation;
Fig. 2 is the structural representation of the framework in the utility model;
Fig. 3 is the structural representation of adjustable support leg in the utility model.
Wherein: 1 adjustable support leg, 2 columns, 3 frameworks, 4 be rotatably connected latch, 5 draw-in grooves, 6 screw threads, 7 nuts.
The specific embodiment:
Below in conjunction with accompanying drawing the utility model is described in further detail: with reference to accompanying drawing 1,2,3, its primary structure comprises: adjustable support leg (1) can directly insert in the pipe of column (2), and regulate the height of column (2) by the nut (6) on the adjustable support leg (1), connect with framework (3) between two root posts (2), framework is divided into 1.2 meters, 1.5 rice, 1.8 rice, 2.4 rice, 3.0 different lengths such as rice, the two ends of framework (3) are provided with draw-in groove (5), framework (3) can pass through direct and column (2) clamping of draw-in groove (5), each framework (3) all is equipped with 4 latches that are rotatably connected (4), be rotatably connected have in the latch (4) one can 90 degree rotations and before and after movable T head dummy parts, when T head dummy parts are in plumbness, the head of T head dummy parts can be inserted any one of last 8 grooves of column (2), to rotate T head dummy parts then revolves and turn 90 degrees, make the head of T head dummy parts be buckled in the both sides of the groove of column (2), again the whippletree on the T head dummy parts pin is inserted, fix T head dummy parts, all is furnished with an adjustable support leg (1) under every root post (2), adjustable support leg (1) can be adjusted according to the concavo-convex of ground, tunes nut (7) but the length of turn screw thread (6) change adjustable support leg (1).
Because this scaffold all parts after assembling process are fixed together, so in use, can carry out integral body as required and move, can reduce the installation that repeats of part like this, reduce work hours.
The framework of the structure of described novel aluminum alloy fast-assembling scaffold adopts aluminium wood embedding structure mutually, and module is placed directly on the framework, and adopts nail to fix.

Claims (1)

1. the structure of novel aluminum alloy fast-assembling scaffold, primary structure comprises: column, framework, adjustable support leg parts, adjustable support leg (1) can directly insert in the pipe of column (2), connect with framework (3) between two root posts (2), the two ends of framework (3) are provided with draw-in groove (5), framework (3) can pass through direct and column (2) clamping of draw-in groove (5), all is furnished with an adjustable support leg (1) under every upright (2) post.
CNU2008201571946U 2008-12-16 2008-12-16 Novel fast-assembled aluminium alloy scaffolding structure Expired - Fee Related CN201358576Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201571946U CN201358576Y (en) 2008-12-16 2008-12-16 Novel fast-assembled aluminium alloy scaffolding structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201571946U CN201358576Y (en) 2008-12-16 2008-12-16 Novel fast-assembled aluminium alloy scaffolding structure

Publications (1)

Publication Number Publication Date
CN201358576Y true CN201358576Y (en) 2009-12-09

Family

ID=41424337

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201571946U Expired - Fee Related CN201358576Y (en) 2008-12-16 2008-12-16 Novel fast-assembled aluminium alloy scaffolding structure

Country Status (1)

Country Link
CN (1) CN201358576Y (en)

Similar Documents

Publication Publication Date Title
CN201358576Y (en) Novel fast-assembled aluminium alloy scaffolding structure
CN207131089U (en) A kind of aluminum dipping form board supporting structure
CN103541557B (en) For the easy device of vertical steel pipe
CN109202797B (en) Quick bolt dismounting component in limited space and fan blade bolt dismounting method
CN206956997U (en) A kind of adjustable Connecting claw applied to curtain wall installation
CN216403779U (en) Be used for hydraulic engineering pipeline lifting to build structure
CN101748883B (en) Novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points
CN215332980U (en) Evacuation platform support in circular tunnel interval
CN208884983U (en) A kind of aluminum alloy mould plate device being easily installed
CN203583900U (en) Simple device for erecting steel pipe
CN203977844U (en) A kind of for the fixing steel pipe iron wire fastener of building trade
CN208867066U (en) Wind-powered electricity generation studs fastening sleeve component
CN201129029Y (en) Elevating screw fine-adjustable bar
CN212336703U (en) Socket key groove type steel pipe bearing support structure
CN105178447A (en) Homocentric-square shaped wood hidden type energy dissipation connection piece
CN202964862U (en) Novel fastening clamp for concrete template
CN221031467U (en) Fastening and positioning integrated aluminum template cohesion device and template suite
CN218815056U (en) Temporary passing jumping frame for house building construction
CN221256171U (en) Novel reinforcing structure for connecting diagonal bracing with template
CN203175031U (en) Connecting piece for external frame diagonal bridging
CN219952923U (en) Fence convenient to install for water conservancy construction
CN219621941U (en) Fixing structure of steel member for steel structure factory building
CN215646707U (en) Photovoltaic frame aluminum profile convenient to disassemble
CN218970608U (en) Scaffold connecting piece for construction engineering construction
CN219622398U (en) Three-dimensional modeling preheater tower frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091209

Termination date: 20111216