CN201351754Y - Porcelain enamel discharge valve body - Google Patents

Porcelain enamel discharge valve body Download PDF

Info

Publication number
CN201351754Y
CN201351754Y CNU2009200370056U CN200920037005U CN201351754Y CN 201351754 Y CN201351754 Y CN 201351754Y CN U2009200370056 U CNU2009200370056 U CN U2009200370056U CN 200920037005 U CN200920037005 U CN 200920037005U CN 201351754 Y CN201351754 Y CN 201351754Y
Authority
CN
China
Prior art keywords
valve body
valve
connecting tube
enamel
porcelain enamel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2009200370056U
Other languages
Chinese (zh)
Inventor
周建国
时荣兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI XILING CHEMICAL EQUIPMENT FACTORY
Original Assignee
WUXI XILING CHEMICAL EQUIPMENT FACTORY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI XILING CHEMICAL EQUIPMENT FACTORY filed Critical WUXI XILING CHEMICAL EQUIPMENT FACTORY
Priority to CNU2009200370056U priority Critical patent/CN201351754Y/en
Application granted granted Critical
Publication of CN201351754Y publication Critical patent/CN201351754Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Check Valves (AREA)
  • Lift Valve (AREA)

Abstract

The utility model discloses a porcelain enamel discharge valve body used in chemical industry. The valve body comprises a valve shell, a valve shell flange, a bracket connecting tube and a discharge tube, which are welded and assembled together. The valve shell, the valve shell flange, the bracket connecting tube and the discharge tube are made of carbon steel plates and seamless steel pipes. The porcelain enamel discharge valve body has the characteristics of short tempering time and high porcelain enamel yield, thereby reducing manufacturing cost.

Description

Enamel discharging valve valve body
Technical field
The utility model relates to the parts of enamel discharging valve, specifically a kind of enamel discharging valve valve body.
Background technique
The discharging valve of using on the chemical industry reactor should have certain corrosion resistance, so its valve interior surface need carry out enamel processing.At present, the valve body of discharging valve all is that casting forms, because its material is a cast iron, the carbon content height causes one to be decarburization temper time long (generally needing about 12 hours), influences manufacturing efficiency; The 2nd, the enamel difficulty is bigger, and yield rate is low, causes cost of production to rise.
Summary of the invention
In order to solve the problem that the enamel discharging valve valve body production time is long, yield rate is low, the utility model provides a kind of assembled valve body, the short but also enamel easy processing of the not only decarburization temper time of manufacturing of this valve body, yield rate height.
The technological scheme that the utility model provides: valve body is decomposed into several sections such as valve casing, support connecting tube, vomit pipe, flange.Valve casing carbon steel board impact briquetting on the mould of special use, and on valve casing, process support connection pore and vomit pipe attachment hole, make valve casing flange and and valve casing welding assembly with carbon steel board.Go out vomit pipe and support connecting tube according to required with the seamless steel pipe cutting process, process vomit pipe and support connecting tube flange with carbon steel board, and respectively with vomit pipe and support connecting tube welding assembly, dress up valve body with being welded with the vomit pipe of flange and support connecting tube and valve casing soldering group.Valve body, carries out internal surface enamel and fires processing about 15 minutes in tempering in the electric furnace after natural cooling, surface treatment, its enamel up-to-standard rate can reach more than 98%.Effect of the present utility model is that the temper time of valve body is short, enamel up-to-standard rate height, thus reduced the manufacture cost of valve body.
Description of drawings
Fig. 1 is the structural drawing of enamel discharging valve, and 1 is valve body among the figure.
Fig. 2 is the valve body sectional plan view.
Fig. 3 is the plan view of valve body.
Embodiment
With reference to Fig. 1, valve body 5 is connected with reactor by flange, on the handwheel 1 nut is arranged, and rotates handwheel 1, and then the 2 drive spools 6 of the screw mandrel on the support 3 move up and down, and open the hole on the orifice plate 7 when spool 6 moves upward, and emit the material in the reactor; When spool moves downward, then block the tapping hole stop blowing on the orifice plate 7.
See Fig. 2 and Fig. 3, valve body 5 is formed through welding assembly by valve casing 9 and valve casing flange 8, vomit pipe 12 and support connecting tube 10, and flange 13 is housed on the blowing mouth of pipe, and flange 11 is installed on the support connecting tube.Concrete manufacture process is: Q 235 carbon steel board are processed into disk, put into specialized mould and be pressed into valve casing 5.On valve casing 5, stamp out support and connect pore and blowing pore.Be processed into valve casing flange 8 with Q 235 carbon steel board, and and valve casing assembling welding.With seamless steel pipe cutting and process vomit pipe 12 and support connecting tube 10, with cutting of Q235 carbon steel board and Vehicle Processing adpting flange 13 and 11, and respectively with vomit pipe 12, support connecting tube 10 welding assemblies.Vomit pipe 12 and support are taken over 10 to be connect with the blowing pore of valve casing 9 and the eyelet welding of support connecting tube respectively and is assembled into valve body.Valve body carries out surface treatment after the tempering in 15 minutes of 950 degree electric furnace back warps, then valve body 5 internal surfaces are carried out enamel and fire.

Claims (2)

1, a kind of enamel discharging valve valve body is characterized in that, is welded with valve casing flange, vomit pipe and support connecting tube on valve casing, respectively is welded with adpting flange at vomit pipe and support connecting tube top, and valve interior surface has enamel coating.
2, enamel discharging valve valve body as claimed in claim 1 is characterized in that described valve casing and valve casing flange and adpting flange make with the Q235 carbon steel board, and vomit pipe and support connecting tube are made by seamless steel pipe.
CNU2009200370056U 2009-02-03 2009-02-03 Porcelain enamel discharge valve body Expired - Fee Related CN201351754Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009200370056U CN201351754Y (en) 2009-02-03 2009-02-03 Porcelain enamel discharge valve body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2009200370056U CN201351754Y (en) 2009-02-03 2009-02-03 Porcelain enamel discharge valve body

Publications (1)

Publication Number Publication Date
CN201351754Y true CN201351754Y (en) 2009-11-25

Family

ID=41375141

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009200370056U Expired - Fee Related CN201351754Y (en) 2009-02-03 2009-02-03 Porcelain enamel discharge valve body

Country Status (1)

Country Link
CN (1) CN201351754Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102588639A (en) * 2011-01-12 2012-07-18 Mt.H控制阀株式会社 Method for manufacturing valve body by using steel plate materials
CN106402453A (en) * 2016-11-13 2017-02-15 郑志伟 Novel enamel faucet and manufacturing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102588639A (en) * 2011-01-12 2012-07-18 Mt.H控制阀株式会社 Method for manufacturing valve body by using steel plate materials
CN106402453A (en) * 2016-11-13 2017-02-15 郑志伟 Novel enamel faucet and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN201351754Y (en) Porcelain enamel discharge valve body
CN101612659A (en) One Albatra metal-antigravity casting stalk
CN102128207A (en) Combination bearing for air condition compressor and manufacturing method thereof
CN101869920A (en) Dephosphorization device of continuous casting slab for wires and rods
CN104959728B (en) Healant for electric shock pits in aluminum absorbing pipe and repairing method thereof
CN101264506B (en) Method for processing pressure container forgeable piece
CN104962951B (en) It is a kind of to repair the method for inhaling aluminum pipe
CN101230860A (en) Exhaust tube for air-conditioner compressor as well as manufacturing and assembling method thereof
CN202671621U (en) Alkaline hydrolysis tank for rare earth production
CN202297621U (en) Slag casting device for metallurgical pre-melted slag production
CN204325452U (en) A kind of combined type fuming furnace tuyere cooler
CN201058879Y (en) Wrought-copper wrought-steel welding oxygen gun blow head
CN205781448U (en) It is easy to the business air conditioner outlet pipe branched pipe efficiently produced
CN103836968B (en) A kind of chassis with side plate
CN221208100U (en) Composite bearing plate
CN103464918A (en) Anti-splash welding rod
CN209855997U (en) Carbon dioxide compressor exhaust mechanism
CN2813179Y (en) Repair welding ferrosteel
CN203193099U (en) Collector ring for submerged arc furnace
CN220366060U (en) Connecting pipe applied between reaction kettle and chlorine pipeline
CN2846955Y (en) Flange
CN201362721Y (en) Blast furnace tuyere large sheath welded on blast furnace shell
CN114131296B (en) Processing technology of high-strength corrosion-resistant industrial product storage tank
CN202220910U (en) Flange connecting pipe
CN203116285U (en) Pressure-bearing water tank inner container

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091125

Termination date: 20180203