CN201317909Y - Temporary support saddle for bridge - Google Patents

Temporary support saddle for bridge Download PDF

Info

Publication number
CN201317909Y
CN201317909Y CNU2008201915578U CN200820191557U CN201317909Y CN 201317909 Y CN201317909 Y CN 201317909Y CN U2008201915578 U CNU2008201915578 U CN U2008201915578U CN 200820191557 U CN200820191557 U CN 200820191557U CN 201317909 Y CN201317909 Y CN 201317909Y
Authority
CN
China
Prior art keywords
hoop
ladle
bridge
temporary support
pressure block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201915578U
Other languages
Chinese (zh)
Inventor
邹永泉
胡汉忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CNU2008201915578U priority Critical patent/CN201317909Y/en
Application granted granted Critical
Publication of CN201317909Y publication Critical patent/CN201317909Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a temporary support saddle for a bridge, which is used for the converting of a continuous bridge system after being assembled simply. The temporary support saddle for a bridge consists of a pressure-bearing block, a ladle hoop and bagged sand grain, which is characterized in that the ladle hoop is not provided with a bottom; the bagged san grain and the pressure-bearing block which are arranged in the ladle hoop have a certain height; a corresponding clearance is left between the pressure-bearing block and the ladle hoop. When the bridge system is converted, the ladle hoop is lifted upwards, and the bagged sand grain is taken out completely, so that the pressure-bearing block is unloaded stably until the bridge body falls down to a permanent support saddle, thus finishing the system converting of the bridge. The utility model has the advantages of simple structure, convenient operation and saving the material, which can be used as a source of a reference for other similar engineering.

Description

A kind of bridge temporary support
Technical field
The utility model relates to bridge pad, especially relates to a kind of temporary support of bridge system conversion usefulness.
Background technology
Behind bridge elder generation freely-supported, reach in the system conversion process of other form continuously, all need to be provided with temporary support.At present, the setting of temporary support mainly contains following several mode:
1, the temporary support that utilizes support, steel member to form.Though this temporary support is reliable and stable, have following a few point defect: the one, make complexity, and can only disposablely use, to remove the waste steel behind the worker with the acetylene-oxygen thermal cutting; The 2nd, make the required precision height, the situation complicated and changeable with the scene is difficult to coincide, and the extremely difficult modification of mistake is arranged slightly; The 3rd, limited to by the place, need set up the higher operating platform of degree of safety, and the bearing space need satisfy the constructor burning torch is goed deep into cutting in the bearing, need big with the space.If permanent bearing is a rubber-type, distance is too near when cutting off, and also easy permanent bearing to rubber-type causes damage.
2, steel sand tube temporary support is set.This temporary support difficulty of processing is bigger, and inner/outer tube all will be processed, and also needs to be provided with to put the sand mouth, and its steel using amount is also relatively large.Owing to the quantity of the sand that needs usefulness is more relatively, the decrement of sand need be definite by testing, and space requirement must be between 10-50cm.Because the space is too big, steel cylinder requires just high, and steel cylinder is too high then unstable, if the space is too little, and the falling leeway of then not putting sand, steel cylinder is difficult for removing, and does not tear open not get off even.
3, the sulphur-bonded mortar bearing is set.In the middle of being typically provided to, this bearing accompanies the concrete precast block of sulphur-bonded mortar interlayer, pre-buried resistance wire in the sulphur interlayer, simultaneously the resistance wire of a plurality of bearings is cascaded, unloads the beam body by thawing that the sulphur-bonded mortar interlayer of a plurality of bearings is switched on synchronously during the system conversion.The deficiency of this bearing: the one, make inconvenient, sulphur-bonded mortar must be in the container of special use heat fused and stir moulding, and the top that overlays on the bottom prefabricated section with mould when needing while hot is pressed into resistance wire, also the top prefabricated section to be installed while hot, if the careless slightly waste product that just occurs easily in the operation, and protecting badly, personnel also poison easily; The 2nd, after temporary support loaded, through the placement of some months, the series connection between each resistance wire went wrong easily, influence reliability, sometimes even the situation that can cause whole bearings to switch on again and detect, and this heavy inspection must be operated by the professional, is very much trouble; The 3rd, bearing needs advanced pedestrian worker to cut if local damage arranged, and in addition reinforcement strengthens work difficulty then; The 4th, sulphur-bonded mortar is disposable material, and cost is higher, belongs to Ministry of State Security's gate control goods and materials again, and buying is difficulty relatively.
Summary of the invention
The purpose of this utility model provides a kind of simple in structure, and is reliable and stable, adjusts flexibly, and cost is low, the temporary support of making convenient disassembly and can realizing reusing.
The technical solution of the utility model is for this reason: a kind of bridge temporary support, form by pressure block, ladle hoop and packed sand grains, it is characterized in that: the ladle hoop is the no end, places packed sand grains and pressure block in the ladle hoop that corresponding height is arranged, and between pressure block and the ladle hoop piece corresponding slit is arranged, during the conversion of bridge system, up sled takes off the ladle hoop, draws clean packed sand grains, makes pressure block steadily unload, on the extremely permanent bearing of beam body drop, thereby the system of finishing bridge is changed.
Improvement to such scheme is: ladle hoop height of the described no end must be less than the height of pressure block, an opposite side in ladle hoop bottom is provided with corresponding little recess, and leave the slit of 2-4mm between ladle hoop and the pressure block, so that draw out sand grains and the ladle hoop that gets loose.
Further improvement of these options is: described pressure block is the concrete precast block of outsourcing one deck pvc pipe, matches at the bottom of its top and the beam, to guarantee that pressure-bearing surface is closely connected and the corner concrete pressure block is intact.
Further improving again of such scheme is: described packed sand grains, sand adopt clean dry medium coarse sand, and sack is the soft polybag that respective strengths is arranged.
The utility model has been saved steel using amount because pressure block adopts concrete prefabricatedly, and is cost-saved, and the steel sand tube adopts the ladle hoop at the no end to remove to put the sand mouth, and is easy to process; Sand grains adopts plastic bag packaging, can reduce the friction with the ladle hoop, help the ladle hoop smoothly sled take off; Ladle hoop and the pressure block that is complementary with it, shape can be made into cylindrical, square column type or other shape, quantity can be arranged to monolithic or polylith according to deck-siding, can suit measures to local conditions during use; During the construction of Liang Tifen connection, the ladle hoop and the pressure block of temporary support are reusable, improve the utilization rate of temporary support.Therefore, the utility model is compared with above-mentioned several temporary supports, has reduced many miscellaneous manufacturing procedures, has also exempted the drawback that easily goes out waste product, is worth other similar engineering that temporary support need be set to be used for reference.
Description of drawings
Fig. 1, elevational schematic view of the present utility model;
Schematic diagram is looked at Fig. 2, mansion of the present utility model;
The specific embodiment
As shown in Figure 1 and Figure 2,1 is pressure block, the 2nd among the figure, ladle hoop, the 3rd, shroud ring recess, the 4th, hoop piece slit, the 5th, packed sand grains, the 6th, beam body, the 7th, pier cap.
Because the stressed back of the ladle hoop of square column type or other shapes is yielding, good far away from cylindrical steel shroud ring force-bearing situation, therefore, do not having under the situation of specific (special) requirements, the concrete pressure block that should preferentially select columniform ladle hoop for use and be complementary with its shape, present embodiment are selected two columniform ladle hoops and pressure block for use.
Earlier ladle hoop 2 accurately is positioned over reposefully during enforcement on the temporary support position that Bridge Pier cap 7 configures, put into then through the measured packed sand grains 5 of tester, by hand that packed sand grains 5 arrangements are plain, its height in hoop is controlled at 2-4cm, again pressure block 1 is put into ladle hoop 2; The roughness control of whole temporary support is not less than 2mm with hoop piece slit 4 and is advisable; When beam body 6 needs converting systems by the time, utilize shroud ring recess 3 that sand grains is drawn pine earlier, ladle hoop 2 up can be prized with the power of putting slightly with crowbar again and be taken off, unwater clean packed sand grains 5 with little slotting skewer then, make pressure block 1 steadily unload, when beam body 6 places on the permanent bearing, promptly dismountable temporary support.

Claims (4)

1, a kind of bridge temporary support is made up of pressure block, ladle hoop and packed sand grains, it is characterized in that: the ladle hoop is the no end, places packed sand grains and pressure block in the ladle hoop that corresponding height is arranged, and between pressure block and the ladle hoop corresponding slit is arranged.
2, a kind of bridge temporary support as claimed in claim 1, it is characterized in that: ladle hoop height of the described no end must be less than the height of pressure block, an opposite side in ladle hoop bottom is provided with corresponding little recess, and leaves the slit of 2-4mm between ladle hoop and the pressure block.
3, a kind of bridge temporary support as claimed in claim 1, it is characterized in that: described pressure block is the concrete precast block of outsourcing one deck pvc pipe, matches at the bottom of its top and the beam.
4, a kind of bridge temporary support as claimed in claim 1 is characterized in that: described packed sand grains, sand adopt clean dry medium coarse sand, and sack is the soft polybag that respective strengths is arranged.
CNU2008201915578U 2008-10-23 2008-10-23 Temporary support saddle for bridge Expired - Fee Related CN201317909Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201915578U CN201317909Y (en) 2008-10-23 2008-10-23 Temporary support saddle for bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201915578U CN201317909Y (en) 2008-10-23 2008-10-23 Temporary support saddle for bridge

Publications (1)

Publication Number Publication Date
CN201317909Y true CN201317909Y (en) 2009-09-30

Family

ID=41196675

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201915578U Expired - Fee Related CN201317909Y (en) 2008-10-23 2008-10-23 Temporary support saddle for bridge

Country Status (1)

Country Link
CN (1) CN201317909Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881002A (en) * 2010-07-09 2010-11-10 中冶建工有限公司 Temporary support seat for simply supporting bridge precast beam
CN101775783B (en) * 2010-01-15 2012-05-23 中国建筑第六工程局有限公司 Construction method by using sandbox as temporary support for continuous beam
CN102518046A (en) * 2011-12-29 2012-06-27 广东冠粤路桥有限公司 Method for eliminating secondary internal force of sinking of support saddle of continuous beam during cantilever construction
CN105369742A (en) * 2015-10-14 2016-03-02 天津城建大学 Rolling bearing suitable for construction by incremental launching method and integrated with permanent support
CN106498855A (en) * 2016-11-15 2017-03-15 中铁十局集团第二工程有限公司 A kind of construction method for the little headroom Cast-in-situ Beam of bridge
CN109781366A (en) * 2019-01-14 2019-05-21 内蒙古科技大学 A kind of rectangular top pipe tunnel F type bell and spigot joint by curved test method
CN110258349A (en) * 2019-07-17 2019-09-20 中交第四公路工程局有限公司 A kind of synchronous adjustment formula precast beam support device and method for supporting
CN112267382A (en) * 2020-10-13 2021-01-26 台州市交通勘察设计院 Prestressed steel-concrete composite beam anchor groove construction method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775783B (en) * 2010-01-15 2012-05-23 中国建筑第六工程局有限公司 Construction method by using sandbox as temporary support for continuous beam
CN101881002A (en) * 2010-07-09 2010-11-10 中冶建工有限公司 Temporary support seat for simply supporting bridge precast beam
CN102518046A (en) * 2011-12-29 2012-06-27 广东冠粤路桥有限公司 Method for eliminating secondary internal force of sinking of support saddle of continuous beam during cantilever construction
CN102518046B (en) * 2011-12-29 2014-05-21 广东冠粤路桥有限公司 Method for eliminating secondary internal force of sinking of support saddle of continuous beam during cantilever construction
CN105369742A (en) * 2015-10-14 2016-03-02 天津城建大学 Rolling bearing suitable for construction by incremental launching method and integrated with permanent support
CN105369742B (en) * 2015-10-14 2016-11-30 天津城建大学 It is applicable to the rolling bearing unified with permanent bearing of incremental launching method
CN106498855A (en) * 2016-11-15 2017-03-15 中铁十局集团第二工程有限公司 A kind of construction method for the little headroom Cast-in-situ Beam of bridge
CN106498855B (en) * 2016-11-15 2018-01-19 中铁十一局集团第二工程有限公司 A kind of construction method for the small headroom Cast-in-situ Beam of bridge
CN109781366A (en) * 2019-01-14 2019-05-21 内蒙古科技大学 A kind of rectangular top pipe tunnel F type bell and spigot joint by curved test method
CN110258349A (en) * 2019-07-17 2019-09-20 中交第四公路工程局有限公司 A kind of synchronous adjustment formula precast beam support device and method for supporting
CN110258349B (en) * 2019-07-17 2023-11-21 中交第四公路工程局有限公司 Synchronous adjustment type precast beam supporting device and supporting method
CN112267382A (en) * 2020-10-13 2021-01-26 台州市交通勘察设计院 Prestressed steel-concrete composite beam anchor groove construction method
CN112267382B (en) * 2020-10-13 2021-12-07 台州市交通勘察设计院有限公司 Prestressed steel-concrete composite beam anchor groove construction method

Similar Documents

Publication Publication Date Title
CN201317909Y (en) Temporary support saddle for bridge
CN102632547B (en) Semi-automatic production method of novel composite heat insulation building block
CN105177202B (en) A kind of blast furnace overhaul method
CN103360026A (en) Wear-resisting plastic material and generation method thereof
CN108999094A (en) Bridge pier conservation layer and bridge pier pier shaft insured's cloth conserve engineering method
CN203965450U (en) Screw detecting machine
CN104612416B (en) A kind of off-loadable resilient supporting unit and the method utilizing its temporary support load
CN202390077U (en) Lifting appliance for conveying tower crane
CN206013588U (en) A kind of garbage compression station with container carries door gear
CN204783059U (en) Poling combination bow member of tunnel work face of processing landslide
CN104545576A (en) Oil bucket convenient for taking oil
CN201932721U (en) Ink bucket dumping device
CN201264783Y (en) Tank type container
CN208327350U (en) Well lid is opened and closed tool
CN209617397U (en) A kind of clear bleaching device of stand alone type
CN201692731U (en) Air-ice separator
CN201544835U (en) Dump truck for building blocks
CN208897265U (en) A kind of novel rudder paddle mounting tool
CN102259743B (en) Garbage transfer collecting turnover hopper compressor
CN205472248U (en) Suspension cage
CN203281807U (en) Dewaxing device
CN108033176A (en) A kind of ruins handle transport vehicle
CN203771995U (en) Fence type smelting crucible
CN204412038U (en) A kind of frame desulfurization reaction tower
CN204056816U (en) A kind of material stores lifting Fang Dou

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090930