CN201311489Y - Standard detection device for high-voltage three-phase combined transformer - Google Patents

Standard detection device for high-voltage three-phase combined transformer Download PDF

Info

Publication number
CN201311489Y
CN201311489Y CNU2008201411627U CN200820141162U CN201311489Y CN 201311489 Y CN201311489 Y CN 201311489Y CN U2008201411627 U CNU2008201411627 U CN U2008201411627U CN 200820141162 U CN200820141162 U CN 200820141162U CN 201311489 Y CN201311489 Y CN 201311489Y
Authority
CN
China
Prior art keywords
transformer
standard
phase
voltage
winding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201411627U
Other languages
Chinese (zh)
Inventor
朱晓丽
蒋卫
张嘉岷
江波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority to CNU2008201411627U priority Critical patent/CN201311489Y/en
Application granted granted Critical
Publication of CN201311489Y publication Critical patent/CN201311489Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model relates to a standard detection device for a high-voltage three-phase combined transformer, belonging to an electronic detection device for electric energy metering and current measurement. The standard detection device for the high-voltage three-phase combined transformer comprises a singlechip, an A/D converter, a front end circuit and a three-phase power supply of 380V. Three current-boosting devices are in star connection with the three-phase power supply and are connected in parallel with a compensating winding Ns of a compensating adjusting coil, and a secondary winding of the compensating adjusting coil is connected in series with a primary winding of a standard-current transformer; three voltage-boosting devices are in triangle connection with the three-phase power supply and are connected in parallel with a compensating winding Y of a compensating adjusting coil, and a secondary winding of the compensating adjusting coil is connected in parallel with a primary winding of a standard-voltage transformer; and secondary windings of the standard-current transformer and the standard-voltage transformer are used for connecting the three-phase combined transformer to be detected. The standard detection device for the high-voltage three-phase combined transformer can simulate the practical operation states of the transformer, carries out detection tests in the state and rightly reflects the true errors and the relative performance of the three-phase transformer.

Description

Standard verification apparatus of high-voltage three-phase combined transformer
Technical field
The utility model relates to a kind of electric energy metering verification standard set-up, especially for error in dipping performance, the calibrating of temperature rise performance and the electric energy metering verification device of test thereof of high-voltage three-phase combination transformer under its actual running status of simulation.
Background technology
The a large amount of utilization of type three phase combined mutual-inductor (batch meter) of 35kV and following electric pressure at present, and this kind equipment is installed on the large user mostly and critical point metering usefulness is made in the private station change, the quality of its capability and performance is directly connected to the accuracy of electric energy metrical, also influence simultaneously the safe operation production of power department, therefore must carry out certificate test to it, to guarantee its quality and accurate measurement.National departments concerned in JB/T10432-2004 " type three phase combined mutual-inductor " standard of implementing on August 1st, 2004 clear and definite standard the test method of three-phase combination transformer, point out, the error test of three-phase combination transformer, temperature rise test and mutual interference test all should be carried out under the situation that applies three-phase voltage and three-phase current, and present domestic each mechanism for testing all is not applicable to the device of this project, product testing is all examined and determine respectively with single-phase standard under single phase poaer supply, and three combined mutual manufacturing firms also only carry out the error calibrating and the correlation test (accompanying drawing 1) of each phase with single plane method, the two does not all meet the requirement of existing relative national standards, simultaneously, make delivery test and measurement verification all not meet the service condition of product, thereby bring the detection error, particularly have influence on the fair and just property of electric energy trade settlement.
The utility model content
The purpose of this utility model provides a kind of standard verification apparatus of high-voltage three-phase combined transformer, with under simulation actual motion state, high-voltage three-phase combination transformer is carried out electric energy metering verification, reflects the electronic installation of its true error and respective performances.
This novel purpose is achieved in that a kind of standard verification apparatus of high-voltage three-phase combined transformer, comprises single-chip microcomputer, A/D converter, and front end circuit, current lifting device and standard current transformer, stepup transformer and standard potential transformer also have the 380V three-phase supply; Described current lifting device is three, the one-level winding of three current lifting devices is done Y-connection and in parallel with the compensation winding Ns of a Compensation Regulation coil with three-phase supply respectively, a plurality of taps are arranged, the secondary winding of Compensation Regulation coil and the one-level windings in series of described standard current transformer on the compensation winding; Described stepup transformer is three, the one-level winding of three stepup transformers is connected as triangle with three-phase supply respectively and is in parallel with the compensation winding Y of a Compensation Regulation coil, on the compensation winding a plurality of taps are arranged, the secondary winding of this Compensation Regulation coil is in parallel with the one-level winding of described standard potential transformer, and the secondary winding of standard current transformer and standard potential transformer all is used to be connected tested type three phase combined mutual-inductor.
The voltage withstand class of the secondary winding of the secondary winding of above-mentioned Compensation Regulation coil and the one-level winding of standard current transformer and Compensation Regulation coil and the one-level winding of standard potential transformer is the 42KV high voltage.
Above-mentioned single-chip microcomputer adopts DSPF206, and A/D converter adopts 8 passages, 14 A/D converter MAX125 at a high speed; Also have programmable logic controller (PLC) GAL and data latches; Data latches is connected between single-chip microcomputer and the A/D converter, and the signal input part of programmable logic controller (PLC) is connected with the signal output part of DSP, and the signal output part of programmable logic controller (PLC) is connected with data latches and A/D converter respectively.
Above-mentioned single-chip microcomputer DSPF206 also is connected with display and the communication module that is used to show the three-phase transformer error.
The utility model three-phase mutual-inductor tester passes through combination of circuits by three single-phase transformers testers, and is controlled by software program, and calculating forms.Wherein the gordian technique of Cai Yonging has: 1, use the high speed digital signal processor chip F206 of dsp technology, its processing speed instruction cycle has reached the ns level, than the ms level of common single-chip microcomputer fast 3 orders of magnitude; 2, adopted the fft technology.Be different from existing single-phase transformers tester, adopt fft to calculate ratio and angular difference, avoided hardware circuit with frequency, temperature, time and humidity to the influence that data cause, improved stable testing and precision; 3, adopt the AD sampling of high-speed, high precision.Used 14 mould/numbers of 8 passages high speed of MAX125 to carry out multichannel continuous conversion in the circuit, by reasonable circuit design, sampling rate can reach 100kS/s, has satisfied the real-time requirement of system.
This novel beneficial effect is:
1, can guarantee the accuracy of electric energy metrical, meet national JB/T10432-2004 " type three phase combined mutual-inductor " standard.The one,, for test specimen, be to have simulated its actual working state fully, making error calibrating and temperature rise test under such condition is to meet reality most, can guarantee that test specimen is used for the accuracy of electric energy metrical; The 2nd,, at the imbalance of three-phase voltage, partly set up the Compensation Regulation coil at current lifting device and stepup transformer, solved the unbalanced problem of three-phase supply well, improved the accuracy of electric energy metrical; The 3rd,, signals such as condenser voltage to load current, offset current, source current and converter DC side have carried out high-speed high-precision sampling and have adopted fft (fast fourier transform) technology, calculate ratio, angular difference, avoided hardware circuit data to be impacted with frequency, temperature, time, humidity, as adopting the capacitance-resistance phase shift to test angular difference, electric capacity is bigger with temperature, frequency influence, thereby has improved the stability and the precision of test.
2, this device has the great significance for popularization in the electric energy metrical field.
Description of drawings
Fig. 1 is the theory diagram of existing single plane method from current parameters and voltage parameter calibrating three-phase mutual inductor;
Fig. 2 is the theory diagram of this novel trichotomy calibrating three-phase mutual inductor (being high-voltage three-phase combination transformer);
Fig. 3 is the circuit diagram of current lifting device shown in Figure 2, Compensation Regulation coil and standard current transformer;
Fig. 4 is the circuit diagram of stepup transformer shown in Figure 2, Compensation Regulation coil and standard potential transformer;
Fig. 5 is the theory diagram of computer chip acquisition channel;
Fig. 6 is the program flow diagram of timer cycle break in service;
Fig. 7 is the theory diagram of signal Processing in the transformer test loop;
Fig. 8 is the circuit diagram of signal Processing shown in Figure 7;
Fig. 9 is the program flow diagram that DSPF206 shown in Figure 8 carries out the fft computing.
Embodiment
Fig. 2 illustrates, and standard verification apparatus of high-voltage three-phase combined transformer comprises single-chip microcomputer, A/D converter, and preposition (sampling) circuit, current lifting device and standard current transformer, stepup transformer and standard potential transformer also have the 380V three-phase supply; Described current lifting device is three, the one-level winding of three current lifting devices is done Y-connection and in parallel with the compensation winding Ns of a Compensation Regulation coil with three-phase supply respectively, a plurality of taps are arranged, the secondary winding of Compensation Regulation coil and the one-level windings in series of described standard current transformer on the compensation winding; Described stepup transformer is three, the one-level winding of three stepup transformers is connected as triangle with three-phase supply respectively and is in parallel with the compensation winding Y of a Compensation Regulation coil, on the compensation winding a plurality of taps are arranged, the secondary winding of this Compensation Regulation coil is in parallel with the one-level winding of described standard potential transformer, and the secondary winding of standard current transformer and standard potential transformer all is used to be connected tested type three phase combined mutual-inductor (referring to Fig. 3 Fig. 4).Can be by the tap of compensation winding be adjusted, to solve the problem of imbalance of three-phase voltage.The voltage withstand class of the secondary winding of the secondary winding of Compensation Regulation coil and the one-level winding of standard current transformer and Compensation Regulation coil and the one-level winding of standard potential transformer is the 42KV high voltage.Referring to Fig. 5 Fig. 7, single-chip microcomputer adopts DSPF206, and A/D converter adopts 8 passages, 14 A/D converter MAX125 at a high speed; Also have programmable logic controller (PLC) GAL and data latches; Data latches is connected between single-chip microcomputer and the A/D converter, and the signal input part of programmable logic controller (PLC) is connected with the signal output part of DSP, and the signal output part of programmable logic controller (PLC) is connected with data latches and A/D converter respectively.Single-chip microcomputer DSPF206 also is connected with display and the communication module that is used to show the three-phase transformer error.
Fig. 2 is the theory diagram of the utility model device.The three-phase mutual-inductor tester is installed in the calibrating installation, three-phase current is controlled in device output simultaneously and three-phase voltage is given standard current transformer and standard potential transformer, in the calibrating circuit of trichotomy, also simultaneously three-phase current and three-phase voltage have been added on the test specimen.In addition,, have the current loading case and the three-phase voltage load box of three-phase in the device, can carry out wiring, satisfy star and open-delta or leg-of-mutton secondary load wiring by phase three-wire three and three-phase and four-line mode for the secondary load of combination transformer.
Compensation Regulation coil in the up-flow source among Fig. 3 and Fig. 4 and the source of boosting is as the adjusting compensation to three-phase imbalance current source and three-phase imbalance voltage source, to guarantee the symmetry of three-phase supply.The elementary winding of current lifting device among Fig. 3 (being the one-level winding) L1, secondary winding (being the secondary winding) is combined together to form S1 with the elementary winding of standard current transformer.Dotted line shows that with interior part this part all is in the high voltage that can bear 42kV.
The elementary winding of all insulation stepup transformer among Fig. 4 (being the one-level winding) Y1, compensation winding, stepup transformer secondary winding (being the secondary winding) Y2, standard potential transformer P1, elementary winding P2.Dotted line shows that with interior part this part all is in the high voltage that can bear 42kV.
Referring to Fig. 7 Fig. 8; K in the transformer test loop, D, A, X and T0, TX signal are sent into after the tester; after two-stage protection filtering circuit OP07; be admitted among the A/D converter MAX125 (U14); the digital quantity that carries out generating after the digital-to-analog conversion is admitted among the DSP F206 (U19) and carries out FFT computing and signal allocation, and the data that obtain after the computing are sent to chips such as demonstration, control, communication by the F206 distribution again.
The standard set-up of the utility model high pressure three-phase ct calibrating test.Be used to do the three-phase combination transformer and the calibrating of threephase potential transformer error of electric energy metrical and electric measurement, temperature rise test, test influences each other.The major technique innovation of this three-phase installation is: 1, researched and developed a kind of three-phase mutual-inductor tester, it can side by side carry out the error testing of threephase current transformer and threephase potential transformer fast with in the calibrating circuit of trichotomy, has improved work efficiency.2, having adopted a kind of can be the integrated system of one at the up-flow power supply and the standard current transformer of 35kV and the operation of following electric pressure, be characterized in: a. considers the influence of the problems such as imbalance of three-phase supply to certificate test, and it is poor to regulate each alternate current amplitude.B. the up-flow source organically combines with standard current transformer, so not only the little integrated level height of volume has reduced test connection, also can reduce the magnetic interference that electric current returns conductor, simultaneously it is all placed under the high voltage actual conditions that can the real simulation running status.3, three-phase high-voltage voltage source and standard potential transformer adopt all insulation mode, and being characterized in not only can be at all insulation product, and is applicable to semi-insulating product; Not only can form the star-star connection mode, also can form open-delta and delta connection mode, and, set up the Compensation Regulation function at the imbalance of three-phase voltage.4, the adjusting of three-phase ct calibrating test standard device control testing table.Its feature three-phase regulator independent separate in stage body with touching the control of key system, makes that the stage body appearance looks elegant is generous, and main is to make things convenient for operation maintenance and maintenance.
This apparatus features:
1, adopts the dsp technology
F206 is the higher fixed-point DSP chip of a kind of cost performance that TI company releases in recent years, its principal feature has: 1, adopt the static CMOS integrated technique advanced Harvard structure that is made, make that calling program and data-carrier store independently address, two buses of independent access, can allow reading simultaneously of data and instruction to carry out, thereby the throughput of data is doubled.The order set of highly-specialised provides powerful signal Processing, the operation flash memory is embedded among the DSP, can reduce system bulk, improve system stability, and programmable device XDS510 that need be special, thereby emulator promptly has programing function has reduced cost of development, and F206 is the design that the square flat package small and light of the TQFP of 100 pins is suitable for portable instrument.
It is 32 that F206 has the multiplying of symbol or unsigned number long-pending with the hard multiplier of a 16*16, position multiply accumulating instruction only need a machine cycle (being 50ns during the 20M clock) and in common single-chip microcomputers such as 51 and 196 multiplication need utilize software to realize that the execution time is the ms level, the F206 map addresses is divided into 4 independently selectable spaces: 64k word program storer, 64k word local data memory, 32k word overall situation data memory, the input/output space of 64k word.
Owing to and adopted JTAG scan logic circuit interface based on the IEEE1149.1 standard between the goal systems, thereby can accomplish really that simulation hardware does not take hardware resource when emulation completely, and can watch the working condition of CPU inside and peripheral hardware at any time, for the debugging and the debug of program brings great convenience.
F206 has zero-waiting FLASH storer on the sheet of two 16K, is used for depositing program and coefficient.Improved the reading speed of programmed instruction like this, the reverse carry addressing that has of F206 and take advantage of characteristics such as adding instruction in addition can improve writing efficient and shortening the program implementation time of program.
2, adopt the fft technology
Be different from common single-phase tester now, adopt fft to calculate ratio, angular difference, avoided hardware circuit data to be impacted with frequency, temperature, time, humidity.Particularly present many testers adopt the capacitance-resistance phase shift to test angular difference, and electric capacity is bigger with temperature, frequency influence, and adopt fft pure software algorithm just can avoid the problems referred to above, improve stable testing and precision.
Fourier transform is a kind of variation that signal is transformed from the time domain to frequency domain.It is a kind of important analysis tool in the fields such as acoustics, image, telecommunications and signal Processing.Wherein, discrete Fourier transformation (DFT) especially the appearance of one of indispensable instrument of digital processing field, particularly Fast Fourier Transform (FFT) (FFT) make that DFT has obtained widely using in actual applications.Fft algorithm is exactly the DFT that constantly DFT of long sequence is decomposed into one by one several short sequences, and the periodicity of utilizing and symmetry this ultimate principle of operation times of reducing DFT is accelerated arithmetic speed.
General high radix fft algorithm is littler than low radix fft algorithm operand, and it is fast that computing velocity is wanted, but the device support and the programming difficulty that need have a more powerful data parallel processing power have also increased.
Power frequency component decomposes through the Fourier quadrature, obtains sinusoidal component and cosine component respectively, is example with voltage:
Figure Y20082014116200081
Figure Y20082014116200082
In the formula, the effective value of U1-input fundamental voltage; The effective value of Un-each harmonic component;
Figure Y20082014116200083
Figure Y20082014116200084
ω-angular frequency;
Figure Y20082014116200085
-first-harmonic phase angle;
Figure Y20082014116200086
-nth harmonic phase angle, n=2,3 The T-cycle.
Obviously, the effective value U1 of fundamental voltage and phase angle φ 1 are respectively: U 1 = a 1 2 + b 1 2 , φ 1 = tg - 1 ( b 1 a 1 ) (3)
In like manner can get the effective value I1 and the phase angle theta 1 of fundamental current, that is:
I 1 = a 2 2 + b 2 2 , θ 1 = tg - 1 ( a 2 b 2 )
3, adopt high-speed, high precision ad sampling
MAX125 is 8 passages, 14 A/D converters at a high speed, establish sampling/retainer (T/H) in it, the single conversion time is 3 μ s, by MAX125 is write control word, can make it to work in the single channel conversion, also can make it to work in multichannel continuous conversion, and its translation data has pooling feature, DSP can read easily, MAX125 adopts the bipolarity power supply, input voltage range is ± 5V, the highest input superpotential of converter is up to ± 17V, and the damage of certain passage can not influence the operate as normal of entire circuit, and MAX125 has satisfied accuracy requirement preferably, by rational Circuit Design, this data acquisition channel can satisfy the real-time requirement of system preferably.
The work schedule of MAX125: 1-4 T/H conversion of each CONVST pulse enable, after the MAX125 initialization, it is 0X0002 that mode of operation is set, system utilizes CH1A, the CH2A of 2 MAX125, CH3A passage respectively three-phase voltage and three-phase current to be changed, be that each MAX125 has only 3 passages to need conversion, be 3 μ s the switching time of each passage, and changing three passages needs 9 μ s, and sampling rate is up to 100kS/s.
Conversion by CONVST pulse enable MAX125, behind about 9 μ s, 3 passage conversions finish, produce 1 look-at-me, look-at-me is sent in the programmable logic controller (PLC) (GAL), and DSP reads sampled data by the GAL notice, and GAL applies read pulse for the RD pin of MAX125 simultaneously, 3 continuous read operations can be read 3 continuous data, and Fig. 5 illustrates the theory diagram of acquisition channel.
MAX125 has A, B2 group signal input part, every group of 4 input channels, and built-in 4 road sampling holders are gathered load current, offset current, source current in actual applications respectively.MAX125 can with the DSP concurrent working to alleviate the work load of DSP, circuit theory is as shown in Figure 5.
Referring to Fig. 9, in a kind of standard verification apparatus of high-voltage three-phase combined transformer the current type voltage value is carried out the program of Fourier transform, it is characterized in that: carry out according to the following steps:
Program begins; Input will be carried out the curtage value sequence of Fourier transform and the radix M that will decompose; Draw the operation times N that need carry out fast fourier transform; Fast fourier transform after decomposing obtains first-harmonic and up to the Fourier transform formula of M subharmonic; Finish computing, the output result.

Claims (4)

1, a kind of standard verification apparatus of high-voltage three-phase combined transformer comprises single-chip microcomputer, A/D converter, and front end circuit, current lifting device and standard current transformer, stepup transformer and standard potential transformer is characterized in that: also have the 380V three-phase supply; Described current lifting device is three, the one-level winding of three current lifting devices is done Y-connection and in parallel with the compensation winding Ns of a Compensation Regulation coil with three-phase supply respectively, a plurality of taps are arranged, the secondary winding of Compensation Regulation coil and the one-level windings in series of described standard current transformer on the compensation winding; Described stepup transformer is three, the one-level winding of three stepup transformers is connected as triangle with three-phase supply respectively and is in parallel with the compensation winding Y of a Compensation Regulation coil, on the compensation winding a plurality of taps are arranged, the secondary winding of this Compensation Regulation coil is in parallel with the one-level winding of described standard potential transformer, and the secondary winding of standard current transformer and standard potential transformer all is used to be connected tested type three phase combined mutual-inductor.
2, according to the described standard verification apparatus of high-voltage three-phase combined transformer of claim 1, it is characterized in that: the voltage withstand class of the secondary winding of the secondary winding of described Compensation Regulation coil and the one-level winding of standard current transformer and Compensation Regulation coil and the one-level winding of standard potential transformer is the 42KV high voltage.
3, according to claim 1 or 2 described standard verification apparatus of high-voltage three-phase combined transformer, it is characterized in that: described single-chip microcomputer adopts DSPF206, and A/D converter adopts 8 passages, 14 A/D converter MAX125 at a high speed; Also have programmable logic controller (PLC) GAL and data latches; Data latches is connected between single-chip microcomputer and the A/D converter, and the signal input part of programmable logic controller (PLC) is connected with the signal output part of DSP, and the signal output part of programmable logic controller (PLC) is connected with data latches and A/D converter respectively.
4, according to the described standard verification apparatus of high-voltage three-phase combined transformer of claim 3, it is characterized in that: described single-chip microcomputer DSPF206 also is connected with display and the communication module that is used to show the three-phase transformer error.
CNU2008201411627U 2008-11-05 2008-11-05 Standard detection device for high-voltage three-phase combined transformer Expired - Fee Related CN201311489Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201411627U CN201311489Y (en) 2008-11-05 2008-11-05 Standard detection device for high-voltage three-phase combined transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201411627U CN201311489Y (en) 2008-11-05 2008-11-05 Standard detection device for high-voltage three-phase combined transformer

Publications (1)

Publication Number Publication Date
CN201311489Y true CN201311489Y (en) 2009-09-16

Family

ID=41108747

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201411627U Expired - Fee Related CN201311489Y (en) 2008-11-05 2008-11-05 Standard detection device for high-voltage three-phase combined transformer

Country Status (1)

Country Link
CN (1) CN201311489Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101707130B (en) * 2009-11-10 2012-12-05 深圳市科陆电子科技股份有限公司 Combined electronic transformer
CN103616605A (en) * 2013-11-08 2014-03-05 国家电网公司 Optimized low-voltage current transformer assembly line detection method
CN109342987A (en) * 2018-12-04 2019-02-15 山东泰开互感器有限公司 A kind of combined instrument transformer calibration equipment in included boosting up-flow source
CN113466775A (en) * 2021-06-16 2021-10-01 云南电网有限责任公司 Comprehensive test device and method for metering power transformer

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101707130B (en) * 2009-11-10 2012-12-05 深圳市科陆电子科技股份有限公司 Combined electronic transformer
CN103616605A (en) * 2013-11-08 2014-03-05 国家电网公司 Optimized low-voltage current transformer assembly line detection method
CN103616605B (en) * 2013-11-08 2016-08-17 国家电网公司 A kind of low-voltage current mutual inductor streamline detection method of optimization
CN109342987A (en) * 2018-12-04 2019-02-15 山东泰开互感器有限公司 A kind of combined instrument transformer calibration equipment in included boosting up-flow source
CN109342987B (en) * 2018-12-04 2024-03-22 山东泰开互感器有限公司 Combined transformer verification device with boosting and boosting sources
CN113466775A (en) * 2021-06-16 2021-10-01 云南电网有限责任公司 Comprehensive test device and method for metering power transformer

Similar Documents

Publication Publication Date Title
CN101403789B (en) Standard verification apparatus of high-voltage three-phase combined transformer
CN100489555C (en) Universal electric power mutual-inductor verification device
CN104345294B (en) A kind of electric energy meter dynamic performance and testing
CN103513211B (en) Ac impedance measurement measuring device
CN102565751B (en) Device for developing programmable single-phase electric energy metering chip
CN201311489Y (en) Standard detection device for high-voltage three-phase combined transformer
CN102749549A (en) Intelligent checking system for substation alternating current voltage secondary circuit
CN110187299A (en) A kind of aviation Support Equipment electrical parameter generic calibration system
Viciana et al. All-in-one three-phase smart meter and power quality analyzer with extended IoT capabilities
CN2261029Y (en) Comprehensive calibrator for electric measuring device
CN104316892A (en) Transformer load box calibration device
CN203490355U (en) Detection device for alternating current impedance tester
CN113433450B (en) Mixed signal testing device based on graphical control
CN103926550A (en) Device and method for checking electric transformer based on virtual instrument
CN105652231A (en) Electric energy meter calibration system and calibration method thereof
CN210136298U (en) General calibrating device of aviation guarantee equipment electrical parameter
CN103033682B (en) High-precision three-phase power meter and metering method thereof
CN103513133A (en) Device and method for measuring MCR type SVC device dynamic response time
CN203149428U (en) Three-phase program-control accurate test power supply
Bucci et al. Development of a low cost power meter based on a digital signal controller
CN102495317A (en) Equipment for achieving multifunction parallel operation aiming at single measuring device
CN207924940U (en) Digitalized electric energy measures Training Simulation System
CN207587208U (en) A kind of multifunctional digital electric energy metering Training Simulation System
CN207008015U (en) A kind of SCM Based intelligent signal analysis system
CN205263299U (en) Energy metering equipment function detecting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090916

Termination date: 20111105