CN201310182Y CNU2008201395662U CN200820139566U CN201310182Y CN 201310182 Y CN201310182 Y CN 201310182Y CN U2008201395662 U CNU2008201395662 U CN U2008201395662U CN 200820139566 U CN200820139566 U CN 200820139566U CN 201310182 Y CN201310182 Y CN 201310182Y
Authority
CN
China
Prior art keywords
scaffold
bar
fastener type
steel tube
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201395662U
Other languages
Chinese (zh)
Inventor
谢良波
刘群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGTAI CONSTRUCTION GROUP CO Ltd
Original Assignee
ZHONGTAI CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGTAI CONSTRUCTION GROUP CO Ltd filed Critical ZHONGTAI CONSTRUCTION GROUP CO Ltd
Priority to CNU2008201395662U priority Critical patent/CN201310182Y/en
Application granted granted Critical
Publication of CN201310182Y publication Critical patent/CN201310182Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a steel-tube full scaffold of fastener type, The scaffold has 4 longitudinal strides and 4 transversal strides, loads in a range of 4 stride*4 strides and has no added strides outside a loading region, a support has a depth-width ratio of 1.6 and a height of 8.0 m; the step pitch of vertical bars is 1.47 m, the longitudinal distance between the vertical bars is 1.27 m, and the transversal distance between the vertical bars is 1.2 m; the scaffold is erected by the steel tubes with the diameter of 48*3.5, and all joints are connected by fasteners; transversal bars at the top of the scaffold directly bear upper loads, and an upper transversal bar is longitudinally arranged in the middle between the adjacent vertical bars. The steel-tube full scaffold of fastener type has safe and stable structure and is convenient erect and dismount.

Description

The full hall of a kind of fastener type steel pipe scaffold
Technical field
The utility model relates to the fastener type steel pipe scaffold that a kind of building site is used, the full hall of especially a kind of fastener type steel pipe scaffold.
Background technology
The full hall of the fastener type steel pipe scaffold of building site use at present, the physical dimension of setting up that does not have series, do not have design code accurately, do not have the full hall of a contacting piece formula steel pipe scaffold critical load to limit, do not have full scaffolding structure critical load requirement one to one of series.Set up by rule of thumb at the scene, on the one hand, causes the waste of material cost to increase, and on the other hand, causes potential safety hazard.
The utility model content
The purpose of this utility model is to provide a kind of full hall of fastener type steel pipe scaffold with Rational structure size, and provides corresponding critical load, makes the economical rationality of the full hall of fastener type steel pipe scaffold, safe and applicable.
The utility model is to realize above-mentioned purpose like this:
The full hall of a kind of fastener type steel pipe scaffold comprises pole steel tube, vertical equity bar and transverse horizontal bar; Node connects with the malleable cast iron fastener, and upper load is directly born by the transverse horizontal bar in the scaffold top, the upper lateral horizon bar longitudinally between adjacent pole steel tube the middle part arrange one; Scaffold vertical 4 is striden, and horizontal 4 stride, and strides 4 * 4 stride in the scope and to load; The outer nothing of loading zone adds strides; The support depth-width ratio is 1.6.
Scaffold top cross horizon bar epithelium is 7.7m to pole steel tube bottom surface distance, scaffold upright rod steel pipe end face on earth identity distance from, be the high 8.0m of frame, adjacent vertical equity bar or adjacent transverse horizon bar axial line distance, be vertical rod step pitch 1.47m, pole steel tube longitudinal pitch 1.27m, pole steel tube horizontal spacing 1.2m.
The full hall of this fastener type steel pipe scaffolding structure safety and firmness, supporting structure is simple, takes and tears open conveniently, steel pipe scaffold template stand economical rationality, safe and applicable.
Description of drawings
Fig. 1 is the full hall of a fastener type steel pipe scaffold front view;
Fig. 2 is the full hall of a fastener type steel pipe scaffold vertical view;
Fig. 3 is the full hall of a fastener type steel pipe scaffold lateral view;
Fig. 4 is the full hall of a fastener type steel pipe scaffold load test assembling front view;
Fig. 5 is the full hall of a fastener type steel pipe scaffold loading zone vertical view;
Fig. 6 is the full hall of a fastener type steel pipe scaffold load test assembling side elevation;
Among the figure: 1, transverse horizontal bar; 2, vertical equity bar; 3, pole steel tube; 4, malleable cast iron fastener; 5, reaction frame; 6, fixing reaction frame steel pipe; 7, distribution beam; 8, i iron; 9, jack; 10, i iron formula parallels.
The specific embodiment
The full hall of a kind of fastener type steel pipe scaffold comprises pole steel tube 3, vertical equity bar 2 and transverse horizontal bar 1; Node connects with malleable cast iron fastener 4, and upper load is directly born by the transverse horizontal bar in the scaffold top, the upper lateral horizon bar longitudinally between adjacent vertical rod the middle part arrange one.Scaffold vertical 4 is striden, and horizontal 4 stride, and strides 4 * 4 stride in the scope and to load, and loading zone is outer not to be had to add and strides; Support depth-width ratio=7.7 ÷ (4 * 1.2)=1.6; The bar of sweeping the floor is the support lower crosspiece, and D is the bar height of sweeping the floor.
Scaffold top cross horizon bar epithelium is 7.7m to pole steel tube bottom surface distance, the scaffold upright rod end face on earth identity distance from, be the high 8.0m of frame, adjacent vertical equity bar or adjacent transverse horizon bar axial line distance, be that vertical rod step pitch E is 1.47m, pole steel tube horizontal spacing A is 1.2m, and pole steel tube longitudinal pitch B is 1.27m, and the bar height D that sweeps the floor is 0.35m.
Scaffold top cross horizon bar epithelium is 7.7m to the pole steel tube bottom surface apart from F, and support upper lateral horizon bar epithelium is 0.3m (shown in the figure) to the pole steel tube end face apart from G.
Test is shown in Fig. 4-6, the full hall of this fastener type steel pipe scaffold is through jack 9 loadings, top reaction frame 5 girders, reaction frame returns back to top load is reached distribution beam 7, distribution beam 7 reaches i iron 8 with load, i iron 8 reaches support top cross horizon bar 1 with load, realizes the loading test of full hall scaffold.Determine the every square meter 12.42kN of critical load, average single vertical rod critical load 12.11kN through loading test.

Claims (3)

1, the full hall of a kind of fastener type steel pipe scaffold comprises pole steel tube (3), vertical equity bar (2) and transverse horizontal bar (1); It is characterized in that: node connects with malleable cast iron fastener (4); Upper load is directly born by transverse horizontal bar (1) in the scaffold top, the top cross horizon bar longitudinally between adjacent vertical rod the middle part arrange one; Scaffold vertical 4 is striden, and horizontal 4 stride; Loading zone is 4 to stride * 4 scopes of striding; The scaffold depth-width ratio is 1.6.
2, the full hall of a kind of fastener type steel pipe according to claim 1 scaffold, it is characterized in that: scaffold top cross horizon bar epithelium is 7.7m to pole steel tube (3) bottom surface distance, the scaffold upright rod end face on earth identity distance from 8.0m, adjacent vertical equity bar (2) axial line distance is 1.47m, adjacent transverse horizon bar (1) axial line distance is 1.47m, adjacent pole steel tube (3) longitudinal pitch 1.27m, adjacent pole steel tube (4) horizontal spacing 1.2m.
3, the full hall of a kind of fastener type steel pipe according to claim 1 scaffold is characterized in that arranging one in the middle part of scaffold upper lateral horizon bar is longitudinally between adjacent pole steel tube (3).
CNU2008201395662U 2008-10-27 2008-10-27 Steel-tube full scaffold of fastener type Expired - Fee Related CN201310182Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201395662U CN201310182Y (en) 2008-10-27 2008-10-27 Steel-tube full scaffold of fastener type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201395662U CN201310182Y (en) 2008-10-27 2008-10-27 Steel-tube full scaffold of fastener type

Publications (1)

Publication Number Publication Date
CN201310182Y true CN201310182Y (en) 2009-09-16

Family

ID=41107435

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201395662U Expired - Fee Related CN201310182Y (en) 2008-10-27 2008-10-27 Steel-tube full scaffold of fastener type

Country Status (1)

Country Link
CN (1) CN201310182Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322134A (en) * 2011-06-14 2012-01-18 刘群 Method for determining difference in bearing capacities of fastener-type full space support frame and full space scaffold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322134A (en) * 2011-06-14 2012-01-18 刘群 Method for determining difference in bearing capacities of fastener-type full space support frame and full space scaffold

Similar Documents

Publication Publication Date Title
CN108489440B (en) Device for monitoring dynamic horizontal displacement of vertical rod of high formwork support frame and application method of device
CN202688885U (en) High-stability fastener type full space support
CN103362298A (en) Mobile tower scaffold with circular disc connecting device
CN102322134B (en) Method for determining difference in bearing capacities of fastener-type full space support frame and full space scaffold
CN201284550Y (en) Fastener type steel pipe full scaffold
CN201381637Y (en) Fastener type steel pipe scaffold template bracket
CN100554629C (en) A kind of buckled type steel pipe scaffold formwork support
CN102182300B (en) Method for increasing horizontal cross braces and improving and determining bearing capacity of support frame
CN201284559Y (en) Fastener type steel pipe scaffold template stand
CN213626572U (en) Tool type external cantilever operation platform
CN101560829B (en) Buckled type steel pipe scaffold formwork support with large height-width ratio
CN201310182Y (en) Steel-tube full scaffold of fastener type
CN101560828B (en) Buckled type steel pipe scaffold formwork support of cross strut
CN201381638Y (en) Fastener type steel pipe scaffold template bracket
CN204040437U (en) Cantilever tripod and single-row cantilever protection frame system
CN201310191Y (en) Template support of steel-tube scaffold of fastener type
CN201284556Y (en) Fastener type steel pipe scaffold template support
CN212453580U (en) Novel safe cat ladder of dish mouth formula scaffold frame
CN205314515U (en) Scaffold of building a wall
CN201284557Y (en) Fastener type steel pipe scaffold template stand
CN201284558Y (en) Fastener type steel pipe scaffold template support
CN100540826C (en) A kind of buckled type steel pipe scaffold formwork support
CN213710274U (en) Scaffold with anti-bending structure for constructional engineering
CN210767782U (en) Guide rail pole setting connecting piece that convenient concatenation was used
CN102182311A (en) Method for increasing wall connecting piece and improving and determining bearing capacity of support frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090916

Termination date: 20151027