CN201268967Y - Protection barrier for firework A-grade workshops in plain area - Google Patents

Protection barrier for firework A-grade workshops in plain area Download PDF

Info

Publication number
CN201268967Y
CN201268967Y CNU2008200527908U CN200820052790U CN201268967Y CN 201268967 Y CN201268967 Y CN 201268967Y CN U2008200527908 U CNU2008200527908 U CN U2008200527908U CN 200820052790 U CN200820052790 U CN 200820052790U CN 201268967 Y CN201268967 Y CN 201268967Y
Authority
CN
China
Prior art keywords
factory building
workshop
worker
fireworks
house
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200527908U
Other languages
Chinese (zh)
Inventor
罗建社
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008200527908U priority Critical patent/CN201268967Y/en
Application granted granted Critical
Publication of CN201268967Y publication Critical patent/CN201268967Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model relates to the technical field of workshop explosion safety protection, in particular to a safety protection barrier for a fireworks and crackers workshop built on plain. The utility model discloses a protection barrier for a fireworks and crackers A grade workshop built on plain, which comprises a workshop and a protection barrier which adopts a protective claybank according to different earthiness; the protective claybank is dug hollow for building workshop foundation; a main passage and an explosion venting bank face are arranged in the front of the workshop; and the rear face and the side faces of the workshop are provided with explosion preventing faces. The utility model has simple construction, low construction cost and good performance of safety protection, can save occupied land, reduces the labor intensity of a worker, improves the working efficiency of the worker, and has popularization value.

Description

Fireworks and firecrackers A level worker-house, plains region protective barrier
Technical field
The utility model relates to factory building explosion safety guard technology field, particularly builds the security protection barrier in fireworks and firecrackers A level worker-house in the plains region.
Background technology
According to GB50161-92 " Code for safety design of fireworks and firecrackers plants ", the A level building of fireworks and firecrackers factory should be provided with protective barrier.At present, mountain area A level factory building can utilize massif to serve as natural cover, and promptly excavation factory building base cave just can solve the safety curtain problem on massif, and building is at the fireworks and firecrackers factory building in Plain, adopt adjacent factory building must reach the means that certain distance is a safety guarantee at present, such method for protecting exists not enough, causes apart from each other between the factory building, and plant area's floor space is big, increased working strength of workers, not only inefficiency, and easy the initiation is operated against regulations, even causes the accident.
Summary of the invention
In order to overcome above-mentioned drawback, technical problem to be solved in the utility model is, a kind of security protection barrier at Plain building fireworks and firecrackers factory building is provided, and can reduce area of mill site, reduces construction investment, alleviates labor strength.
The technical scheme that is adopted of the utility model technical solution problem is: fireworks and firecrackers A level worker-house, plains region protective barrier, comprise factory building, protective barrier, it is characterized in that: protective barrier adopts the protection earth embankment according to different soil properties, in the protection earth embankment, dig to lack the factory building ground is set, there are main channel, venting of dust explosion dike face in the factory building front, and there is the quick-fried dike face of retaining factory building back, side.
The height of described protection earth embankment is not less than the height of factory building eaves, and top width is not less than 1 meter, and bottom width is not less than high 1.5 times of dike, and dike length exceeds exterior wall before the factory building.
The described protection earth embankment gradient determines that according to different soil properties and needs keeping off the quick-fried dike face gradient can be the 70-80 degree, and the gradient of venting of dust explosion dike face can be the 30-40 degree.
The beneficial effects of the utility model are: construction is simple, and construction cost is low, and the security protection performance is good; Can save the area, alleviate working strength of workers, improve workman's efficiency, have promotional value.
Description of drawings
Fig. 1 is a plane structure chart of the present utility model;
Fig. 2 is the sectional view of A-A ' section;
Fig. 3 is the sectional view of B-B ' section.
The specific embodiment
At first determine factory building towards, fireworks and firecrackers factory will keep away with a western exposure, north wind as far as possible, its objective is that to prevent summer plant area's temperature too high, increases potential safety hazard; Avoid north wind then can be so that be unlikely to undue cold winter as far as possible, and therefore, building should be tried one's best southwards, and the main channel is east-west.
Dig the trench of a wide 8-10 rice, dark 1.2-1.5 rice, as main channel 2; Earth in the trench is piled the bulwark 4 that is higher than 4 meters toward both sides, and keeping off quick-fried dike face 1 gradient is the 70-80 degree, and the gradient of venting of dust explosion dike face 3 is the 30-40 degree, to prevent the reaction of shock wave.Dig scarcely at quick-fried dike one bank of retaining as required then, determine factory building 5 tofts, toft is arranged in the protection earth embankment 4.Distance between the operation factory building 5 on the same protection earth embankment 4 (calculating from exterior wall) is not less than 7 meters, and the distance between transfer storage facility and the factory building 5 is not less than 10 meters; The factory building 5 in same protection earth embankment 4 not, distance each other is not less than 20 meters.Build up back protection earth embankment 4 top widths and be not less than 1 meter, the dike height is not less than the height of factory building eaves.If toft and protection earth embankment 4 loosen the soil, should build bank protection and collapse to prevent earth.Toft ground should be equal with the road surface, main channel.

Claims (3)

1, plains region fireworks and firecrackers A level worker-house protective barrier, comprise factory building, protective barrier, it is characterized in that: trench digging is built furrow on the level land, the excavation breach is provided with the factory building position in furrow, the main channel is left in the factory building front, and the worker-house periphery is built gutter, opposite, worker-house, it is domatic to be that the back of front-seat earth embankment is provided with venting of dust explosion, forms the protection earth embankment of factory building back, side.
2, according to fireworks and firecrackers A level worker-house, the described plains region of claim 1 protective barrier, it is characterized in that: the height of described protection earth embankment is not less than the height of factory building eaves, and top width is not less than 1 meter, and bottom width is not less than high 1.5 times of dike, and dike length exceeds exterior wall before the factory building.
3, according to fireworks and firecrackers A level worker-house, the described plains region of claim 1 protective barrier, it is characterized in that: it is the 50-60 degree that the described protection earth embankment gradient is kept off the quick-fried dike face gradient, and the gradient of venting of dust explosion dike face is the 30-40 degree.
CNU2008200527908U 2008-04-04 2008-04-04 Protection barrier for firework A-grade workshops in plain area Expired - Fee Related CN201268967Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200527908U CN201268967Y (en) 2008-04-04 2008-04-04 Protection barrier for firework A-grade workshops in plain area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200527908U CN201268967Y (en) 2008-04-04 2008-04-04 Protection barrier for firework A-grade workshops in plain area

Publications (1)

Publication Number Publication Date
CN201268967Y true CN201268967Y (en) 2009-07-08

Family

ID=40841564

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200527908U Expired - Fee Related CN201268967Y (en) 2008-04-04 2008-04-04 Protection barrier for firework A-grade workshops in plain area

Country Status (1)

Country Link
CN (1) CN201268967Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111445663A (en) * 2019-01-16 2020-07-24 余珊 On-site safety alarm method
CN111519958A (en) * 2020-05-08 2020-08-11 李孝斌 Explosion-proof workshop for firework and firecracker production

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111445663A (en) * 2019-01-16 2020-07-24 余珊 On-site safety alarm method
CN111445663B (en) * 2019-01-16 2021-10-19 阜宁泰利泵业有限公司 On-site safety alarm system
CN111519958A (en) * 2020-05-08 2020-08-11 李孝斌 Explosion-proof workshop for firework and firecracker production
CN111519958B (en) * 2020-05-08 2022-07-22 浏阳市达浒花炮艺术焰火燃放集团有限公司 Explosion-proof workshop for producing fireworks and crackers

Similar Documents

Publication Publication Date Title
CN206256454U (en) A kind of massif ecological slope protection structure
CN201268967Y (en) Protection barrier for firework A-grade workshops in plain area
CN108166520A (en) Electric power transmission line engineering construction soil and water conservation method
CN106638891A (en) Comprehensive water managing method in underground mining stage of open pit into underground mining
CN207211100U (en) Vertical shaft type powerhouse of hydropower station structure
CN201165666Y (en) Flexible netted check dam
CN206245283U (en) A kind of river course dykes and dams ecological revetment
US20160312427A1 (en) Embankment Support
CN106192896B (en) A kind of highlight lines frigid mountainous areas highway cutting gradient slope ecological protection system and method
CN110029624B (en) Ecological seawall with multistage modularized protection
CN104264635A (en) Construction technology of slag stacking behind concrete faced rock-fill dam
CN106522572A (en) Construction method for constructing large-space underground channel in limited space of historical protection building
CN207891897U (en) A kind of protective slope structure of side slope
CN208486459U (en) Planted roof
CN202139595U (en) Short-pipe-type ecological slope protective structure
CN105103696A (en) Method for desertification control through salix bangongensis cuttage in high-altitude gobi wind-blown sand region
DE19844659A1 (en) Thermal wind current driven power plant
CN205804373U (en) A kind of new-type embankment slope protection structure of saline soil area
CN104612699A (en) Large-section tailwater tunnel excavation-with-cap method
CN211948481U (en) Civil engineering is with bank protection soil erosion and water loss prevention structure
CN205152966U (en) Ecological concrete bank protection earth embankment
CN101363317A (en) Developing method for large-scale strip mine
CN212000961U (en) Protection building structure of ecological meshing brick of farmland escape canal
CN210086427U (en) Siphon seepage and drainage pipe
CN202298627U (en) Foundation pit supporting structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090708

Termination date: 20100404